The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Score |
Route |
Community |
Description |
High Level Cost Estimate for Planning Purposes |
Year Planned (FY) |
Comments |
50 |
MN120 |
Mahtomedi, White Bear Lake |
Resurface pavement on Hwy 120 from north ramp of I-694/Hwy 120 to junction CR 12 (old Hwy 244) in White Bear Lake and Mahtomedi |
$974,000 |
2027, Prior |
Poor pavement conditions. Safety. |
45 |
MN120 |
Oakdale, North St Paul, Maplewood, White Bear Lake |
Resurface road on Hwy 120 (Century Ave) from 35 feet north of 4th St in Maplewood and bituminous mill and overlay on Hwy 120 (Century Ave) from Hwy 36 to Hwy 244 in White Bear Lake |
$8,770,000 |
2027 |
Poor pavement conditions. |
30 |
MN121 |
Minneapolis |
Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from 0.5 miles west of I-35W pedestrian bridge over Lyndale Ave to W 58th St in Mpls |
$1,642,000 |
2025 |
Poor pavement conditions. |
55 |
MN13 |
Eagan, Mendota Heights |
Repair concrete from I-494 to MN 55 |
$5,055,915 |
2029 |
Poor pavement conditions. 2020 Remaining service life 0 to 5 years. |
50 |
MN13 |
Mendota Heights |
Resurface road from MN 55 to MN 13 |
$10,165,320 |
2032 |
|
35 |
MN149 |
|
Resurface Hwy 149 from Hwy 55 to bridge over I-494. |
$3,780,000 |
2033 |
Preventive maintenance. |
60 |
MN156 |
Saint Paul |
Medium mill and overlay from Dakota/Ramsey County Line to US52 |
$500,000 |
Not Selected |
Program limited by available funding. |
55 |
MN156 |
South Saint Paul |
Medium mill and overlay from I-494 to Armour Ave |
$600,000 |
Not Selected |
Program limited by available funding. |
50 |
MN156 |
South Saint Paul |
Medium mill and overlay from Armour Ave to Wentworth Ave |
$1,200,000 |
Not Selected |
Program limited by available funding. |
35 |
MN156 |
South Saint Paul |
Medium mill and overlay from Wentworth Ave to Dakota/Ramsey County line |
$900,000 |
Not Selected |
Program limited by available funding. |
55 |
MN21 |
Jordan |
Thin mill and overlay from Mill st to US169 |
$2,300,000 |
Not Selected |
Poor pavement conditions. |
45 |
MN244 |
Dellwood, Mahtomedi |
Resurface Hwy 244 (Dellwood/Mahtomedi Ave) from CR 12 (Stillwater Rd) in Mahtomedi to Hwy 96 (Dellwood Rd) in Dellwood |
$6,299,000 |
2026 |
Poor pavement conditions. |
35 |
MN244 |
Mahtomedi, White Bear Lake |
Reconstruction from MN120 to Ash St |
$6,000,000 |
Not Selected |
Turnback. Recent surface treatment concealing poor pavement conditions. |
50 |
MN282 |
Jordan |
Medium mill and overlay from US169 to MN244 |
$500,000 |
Not Selected |
Program limited by available funding. |
45 |
MN282 |
|
Resurface MN 282, from bridge over Sand Creek to Mill St |
$1,250,000 |
Not Selected |
|
75 |
MN3 |
St Paul |
Medium mill and overlay from Mendota Rd to Wyoming St |
$2,700,000 |
Not Selected |
Program limited by available funding. |
65 |
MN3 |
Rosemount |
Medium mill and overlay from Dakota County Road 58 to 145th |
$1,300,000 |
Not Selected |
Program limited by available funding. |
55 |
MN3 |
St Paul |
Rehab pavement, sidewalk replacement and ADA improvements on Hwy 3 (Robert St) from Annapolis St E to Mississippi River in St Paul |
$13,775,000 |
2026 |
Poor pavement conditions. |
40 |
MN3 |
St Paul |
Resurface and jurisdictional transfer Hwy 3 (Robert St) from Mississippi River Bridge to E 11th St in St Paul |
$14,610,000 |
2025 |
Poor pavement conditions. Turnback to city. |
40 |
MN3 |
St Paul |
Thin mill and overlay from Kellogg Blvd to I35E |
$7,700,000 |
Not Selected |
Poor pavement conditions. Turnback to city. |
70 |
MN47 |
Minneapolis |
Resurface, drainage, sidewalks, ADA work and signal replacement on Hwy 47 (University Ave) from Hwy 65 (NE Central Ave) to just south of 27th northeast Ave in Mpls |
$7,653,000 |
2027 |
Poor pavement conditions. |
60 |
MN47 |
Minneapolis |
Medium mill and overlay from 27th Ave to 40th Ave |
$1,900,000 |
Not Selected |
Program limited by available funding. |
|
MN47 |
Columbia Heights |
Reconstruct on MN 47 from 53rd Ave NE to 85th Ave NE in Columbia Heights and Fridley |
$1 |
2028 |
|
70 |
MN5 |
St Paul |
Resurface road from Munster Ave to ST. Claire Ave |
$7,393,539 |
2028 |
Poor pavement conditions. |
60 |
MN5 |
St Paul |
Resurface road from St. Clair Ave to bridge over I94, resurface Hwy 5 bridge. |
$13,854,031 |
2029 |
Poor pavement conditions. |
55 |
MN5 |
Waconia |
Medium mill and overlay from MN284 to Elm St |
$100,000 |
Not Selected |
Program limited by available funding. |
55 |
MN5 |
Waconia |
Medium mill and overlay from Oak ave to MN284 |
$1,500,000 |
Not Selected |
Program limited by available funding. |
55 |
MN5 |
Waconia |
Reconstruct road, manage access and construct multi-use trail at Hwy 5 from CR 284 (W 13th St) to CR 59/Main St in Waconia |
$12,177,972 |
2026 |
|
45 |
MN5 |
Waconia |
Medium mill and overlay from Elm St to Birch St |
$300,000 |
Not Selected |
Program limited by available funding. |
10 |
MN5 |
Maplewood |
Replace traffic signals, ADA and various safety upgrades at Forest, Earl, Ruth and Johnson Parkway on Hwy 5, 0.3 miles east of Mendota St in St Paul to north jct Hwy 120 (Century Ave N) in Maplewood |
$10,784,000 |
2024, Prior |
|
60 |
MN51 |
St Paul |
Medium mill and overlay from Dayton Ave to Pierce Butler |
$1,600,000 |
Not Selected |
Program limited by available funding. |
50 |
MN51 |
St Paul, Falcon Heights, Roseville |
Medium mill and overlay from Pierce Butler to MN36 |
$3,000,000 |
Not Selected |
Program limited by available funding. |
65 |
MN65 |
Minneapolis |
Medium mill and overlay from 27th Ave to 37th Ave |
$1,400,000 |
Not Selected |
Program limited by available funding. |
65 |
MN65 |
Minneapolis |
Reconstruction, ADA and BR repair on MN 65 from 2nd ST to 37th Ave NE in Mpls and 37st Ave to 53rd Ave in Columbia Heights |
$1 |
2028 |
|
35 |
MN65 |
Columbia Heights |
Repair road from University Ave SE. to NE 27th Ave |
$3,300,000 |
2030 |
Poor pavement conditions. |
60 |
MN95 |
Taylors Falls |
Medium mill and overlay from County Road 16/Taylors Falls to US8 |
$300,000 |
Not Selected |
Program limited by available funding. |
65 |
US52 |
Minneapolis |
Medium mill and overlay from MN65 to University Ave |
$3,200,000 |
Not selected |
Poor pavement conditions plus ADA and bike needs. |
75 |
US61 |
Forest Lake |
Medium mill and overlay from MN95 to Forest Lake Cl |
$7,400,000 |
Not Selected |
Poor pavement conditions. |
70 |
US61 |
White Bear Lake |
Medium mill and overlay from White Bear Ave to MN96 |
$1,700,000 |
Not Selected |
Program limited by available funding. |
55 |
US61 |
White Bear Lake |
Medium mill and overlay from 8th St to MN96 |
$300,000 |
Not Selected |
Program limited by available funding. |
45 |
US61 |
|
Resurface Hwy 61 from Hwy 97 to N of Hwy 8 |
$5,121,000 |
2029 |
Poor pavement conditions. |
10 |
US61 |
Hastings |
Resurface road from Jct MN 316 to W 36th St in Hastings |
$6,882,750 |
2029 |
Projected poor pavement conditions. |
67 |
US61, MN5 |
Maplewood |
Improve pavement conditions, stormwater drainage, corridor safety, walkability, traffic signals, landscaping, trails, bus stops, lighting, and sidewalk curb ramps on Hwy 61 (Arcade) from East 7th St to 0.2 miles south Roselawn Ave in Maplewood and on Hwy 5 from east end bridge 62703 to Minnehaha Ave in St Paul and Improve pavement conditions, stormwater drainage, corridor safety, walkability, traffic signals, landscaping, trails, bus stops, lighting, and sidewalk curb ramps on Hwy 61 (Arcade) from East 7th St to 0.2 miles south Roselawn Ave in Maplewood and on Hwy 5 from east end bridge 62703 to Minnehaha Ave in St Paul and Improve pavement conditions, stormwater drainage, corridor safety, walkability, traffic signals, landscaping, trails, bus stops, lighting, and sidewalk curb ramps on Hwy 61 (Arcade) from East 7th St to 0.2 miles south Roselawn Ave in Maplewood and on Hwy 5 from east end bridge 62703 to Minnehaha Ave in St Paul |
$30,800,000 |
2025 |
Poor pavement conditions. |