Project selection

Increasing the transparency of how we select highway construction projects

Non-National Highway System pavement projects

MnDOT Metro District

Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2024

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
90 Hwy 13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
90 Hwy 95 Resurface road from Hwy 97 to Hwy 36 in Scandia and Stillwater $17,004,000 2030 Projected poor pavement conditions.
90 Hwy 95 Resurface Hwy 95 from the Isanti county line to Hemingway Ave in North Branch $14,185,600 2029  
87 Hwy 120 Resurface road on Hwy 120 (Century Ave) from 35 feet north of 4th St to Hwy 36 in Maplewood and bituminous mill and overlay on Hwy 120 (Century Ave) from Hwy 36 to Hwy 244 (County Rd E) in White Bear Lake    $8,770,000   2027   Poor pavement conditions. 
85.5 Hwy 13 Resurface Hwy 13 from Eagle Creek Ave to CSAH 42 in Savage - Future Project $37,229,649 2035 Projected poor pavement conditions.
84 Hwy 5 Repair road on Hwy 5 (W 78th St) from Hwy 41 (Hazeltine Blvd) to Eden Prairie Rd in Chanhassen $21,724,572 2033 Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues.
82 Hwy 97 Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake    $17,700,000   2025   Geometrics. Poor pavement conditions. Ped/bike trail needs. 
82 US Hwy 61 Resurface road, traffic signals, pedestrian improvements, drainage, curb and gutter and replace bridge #96093 on Hwy 61 from 0.2 miles north of Carver Ave to east junction of I-94 in St Paul    $25,259,000   2027, 2028   Poor pavement conditions.
81 Hwy 5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down.
81 Hwy 97 Resurface Hwy 97 from US Hwy 61 to Hwy 95 in Scandia $11,716,661 2032 Poor pavement conditions. Project has been deferred several times. 
79 Hwy 96 Resurface road from US Hwy 61 to Hwy 95 $10,280,000 Not selected Projected poor pavement conditions.
78 Hwy 13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 Hwy 3 Medium mill and overlay from Hwy 50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
77 Hwy 120 Resurface Hwy 120 from Brookview Dr to 4th St in Maplewood $2,763,119 2032 Projected poor pavement conditions.
77 Hwy 21 Medium mill and overlay from Hwy 19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
77 Hwy 3 Resurface road on Hwy 3 from Rice County line to Hwy 50 in Hampton $12,933,131 2029 Poor pavement conditions. 
76 Hwy 21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
74 Hwy 13 Medium mill and overlay from Hwy 13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
74 Hwy 51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021
73 952A Resurface road, construct separated bike lanes, signal, ADA and sidewalk work on Hwy 952A/Hwy 47 (University Ave) from Hwy 65 (Central Ave) to I-35W in Mpls $9,500,000 2027 Poor pavement conditions plus ADA and bike needs. 2726-87
73 Hwy 13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 Hwy 21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
73 Hwy 3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
72 MN121 Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from WB TH62 loop to W 58th St and CR22 from W 58th St to W 56th St in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls    $2,192,000   2025   Poor pavement conditions. 
72 Hwy 13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
72 Hwy 3 Reconstruct Hwy 3 (Robert St) from Amana Trail to Hwy 62 in Settler's Ridge $13,603,200 2033 RQI does not match on the ground conditions
72 Hwy 95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
72 US Hwy 61 Medium mill and overlay from US 10 to 70th St $8,500,000 Not Selected  Program limited by available funding.
72 US Hwy 61 Medium mill and overlay from Hwy 96 to White Bear Lake CL $1,000,000 Not selected RQI does not match on the ground conditions
71 Hwy 13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 Hwy 3 Medium mill and overlay from Hwy 149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
70 Hwy 13 Repair concrete from I-494 to Hwy 55 in Eagan and Mendota Heights $6,618,480 2029 Poor pavement conditions. 2020 Remaining service life 0 to 5 years. 
70 Hwy 50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 (Lillehei Ave) in Douglas Township    $8,000,000   2026   Poor pavement conditions. 
69 Hwy 149 Medium mill and overlay from Hwy 3 to Albano Tr $200,000 Not selected Program limited by available funding.
69 Hwy 3 Resurface Hwy 3 (S Robert Trl) from 145th St to Hwy 149 (Dodd Rd) in Rosemount $6,045,603 2033  
69 Hwy 5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
69 US Hwy 61 Medium mill and overlay from Frenchman Rd to Trailer Pk entrance $400,000 Not selected Program limited by available funding.
68 Hwy 101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
68 Hwy 13 Medium mill and overlay from MN282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 Hwy 95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
68 US Hwy 61 Medium mill and overlay from White Bear Lake Cr to Frenchman Rd $1,800,000 Not selected Program limited by available funding.
68 US Hwy 61 Medium mill and overlay from 250th St to Chisago County Road 31/32 $700,000 Not selected Program limited by available funding.
67 Hwy 5 Resurface road from St. Clair Ave to bridge over I94, resurface Hwy 5 bridge in St. Paul. $19,970,000 2029 Poor pavement conditions. 
67 US Hwy 61 Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St $700,000 Not selected Program limited by available funding.
67 US Hwy 61 Medium mill and overlay from Chisago County Road 31/22 to 267th St  $200,000 Not selected Program limited by available funding.
66 Hwy 13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
66 Hwy 95 Medium mill and overlay from St Croix Trail to Point Rd $1,000,000 Not selected Program limited by available funding.
65 Hwy 13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
65 Hwy 5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
64 Hwy 149 Medium mill and overlay from Albano Tr to Hwy 55 $2,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
64 Hwy 95 Medium mill and overlay from Bailey Rd to US Hwy 61 $4,100,000 Not selected Program limited by available funding.
64 US Hwy 61 Medium mill and overlay from 170th St to Hwy 97 $1,900,000 Not selected Program limited by available funding.
62 MN243 Medium mill and overlay from Hwy 95 to St Croix River $700,000 Not selected Program limited by available funding.
62 Hwy 95 Medium mill and overlay from I-94 to Valley Creek $700,000 Not selected Program limited by available funding.
61 Hwy 101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 Not Selected  Poor pavement conditions. 
61 Hwy 95 Medium mill and overlay from Valley Creek to Bailey Rd $1,200,000 Not selected Program limited by available funding.
59 Hwy 5 Medium mill and overlay from MN25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
59 Hwy 51 Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills   $6,477,000   2026   Poor pavement conditions. ADA, bike/ped, and drainage needs. 
58 Hwy 149 Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St $2,500,000 Not selected Program limited by available funding.
57 Hwy 149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
57 Hwy 50 Medium mill and overlay from Hwy 3 to US52 $4,300,000 Not selected Program limited by available funding.
55 MN121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
55 Hwy 5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
47 Hwy 19 Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project $2,700,000 Not selected  
47 Hwy 95 Thin mill and overlay from I-94 to Mulberry St $18,000,000 Not selected Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
46 Hwy 101 Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego    $12,674,000   2027   Poor pavement conditions. 
44 Hwy 95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
43 Hwy 5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
40 Hwy 13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
40 Hwy 56 Resurface road on Hwy 56 (Emery Ave) from the Goodhue/Dakota County line to Hwy 52/Hwy 50 (Hampton Ave) in Randolph $9,486,129 2033 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 
39 Hwy 97 Minor rehabilitation within roundabout at US Hwy 61 $100,000 Not selected Newer concrete roundabouts.
27 Hwy 13 Medium mill and overlay from Hwy 13 to Hwy 149 $200,000 Not selected Program limited by available funding.
27 Hwy 13 Medium mill and overlay from Connelly Pkwy to old Hwy 101 $2,000,000 Not selected Program limited by available funding.
25 Hwy 5 Resurface road, improve ADA, lighting, traffic signal replacement, bridge repairs on TH5 from Munster Ave to 0.02 miles east of St Clair Ave in St Paul    $27,117,000   2028   Poor pavement conditions. 
25 Hwy 51 Resurface Hwy 51 (Snelling) from W 7th to Dayton Ave in St. Paul $13,210,469 2030 Poor pavement conditions.
24 Hwy 5 Resurface Hwy 5 from County Rd 11 to Hwy 41 in Chanhassen $6,540,000 2032 Projected poor pavement conditions.
22 Hwy 149 Resurface Hwy 149 (Dodd Rd) from Hwy 55 to bridge over I-494 in Eagan $4,944,240 2033 Preventive maintenance.
21 Hwy 20 Resurface Hwy 20 from Hwy 19 to Hwy 50 in Cannon Falls $6,540,000 2032 Poor pavement conditions. 2020 RSL 2 to 10 years.
21 Hwy 95 Resurface Hwy 95 from Hwy 8 to Hwy 97 in North Branch $19,620,000 2032  
19 Hwy 47 Thin mill and overlay from Cree St to Pederson Dr $2,400,000 Not Selected  Safety. Poor pavement conditions.
18 Hwy 95 Resurface Hwy 95 (St Croix Trl) from Hemingway Ave to Manning Bridge over Sunrise River in North Branch $9,168,714 2031 Poor pavement conditions. 2020 RSL 0 to 5 years.
16 Hwy 51 Resurface Hwy 51 from Dayton Ave to Pierce Butler in St. Paul $14,713,584 2034  
10 Hwy 244 Resurface Hwy 244 (Dellwood/Mahtomedi Ave) from CR 12 (Stillwater Rd) in Mahtomedi to Hwy 96 (Dellwood Rd) in Dellwood    $6,299,000   2026   Poor pavement conditions. 
0 Hwy 20 Resurface Hwy 20 (Cannon Falls Blvd) from River Road in Cannon Falls to 280th St E at Goodhue and Dakota County line in Cannon Falls Township    $3,420,000   2025    