MnDOT Metro District
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- Metro District project selection
- Metro District Non-National Highway System pavement projects
- Metro District Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated October 2024
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
0 | MN55 | Replace signal, reconstruct pavement, improve ADA at TH55 at Pine St and River St in Hastings | $1,326,000 | Not Selected | |
0 | MN62 | Resurface Hwy 62 from Lexington Ave to Northbound 35E Ramp. | $3,044,445 | Not Selected | |
0 | MN65 | Improve TH65 in Columbia Heights | $25,000,000 | 2028 | |
96 | MN100 | Resurface road, repair 14 bridges, curb and gutter repair, access removal, ramp realignment and removal of bridge 27042 on Hwy 100 from under pedestrian bridge/exit Cedar Lake Rd in St Louis Park to I-694 in Brooklyn Center | $49,618,000 | 2027, 2028 | Poor pavement conditions; preventive maintenance. |
95 | I35E | Repair road surface from Little Canada Rd to County Rd E bridge | $8,000,000 | Not Selected | Repair early distresses. |
95 | I35E | Repair road from I-35W/I-35E split to Lone Oak Rd in Burnsville | $128,834,599 | 2030 | Projected poor pavement conditions. |
95 | I494 | Repair road from France Ave to US 12 | $18,000,000 | Not selected | Preventive maintenance. |
94 | I694 | Resurface Hwy 694 from Hwy 61 to CR 10 in Vadnais Heights | $23,400,000 | 2033 | Repair early distresses. |
93.5 | I35E | Resurface I-35E from Lone Oak Rd to bridge over Marie in Mendota Heights | $24,079,234 | 2033 | |
91 | US169 | Medium mill and overlay from MN55 to 77th Ave | $7,800,000 | Not Selected | Program limited by available funding. |
91 | US52 | Medium mill and overlay from I-494 to Lafayette bridge | $5,100,000 | Not Selected | Program limited by available funding. |
90 | I35W | Medium mill and overlay from MN13 to 106th St | $4,000,000 | Not Selected | Construction of I-35W River Crossing at time of DIV run, bypass pavement is rough. |
90 | I35W | Medium mill and overlay from 4th St bridge to Ramsey County Road C | $8,000,000 | Not Selected | RQI does not reflect on the ground conditions |
90 | I494 | Medium mill and overlay from 24th Ave to France Ave | $29,400,000 | Not selected | Poor pavement conditions. Coordinate with 494 Corridors of Commerce project. |
90 | I94 | Medium mill and overlay from I-494 to Nicollet Ave bridge | $27,400,000 | Not Selected | RQI does not reflect on the ground conditions |
89 | I35W | Repair road from 82nd to 66th Street | $25,378,591 | Not selected | Repair early distresses. |
89 | I394 | Resurface I 394 from I-494/US 212 to MN 100 in Golden Valley, Minnetonka and Saint Louis Park | $56,244,000 | 2031 | Projected poor pavement conditions. |
89 | I94 | Resurface I 94 from E. of Nicollet Ave Bridge in Minneapolis to .1 mi. W of Western Ave in St. Paul | $82,347,797 | 2034 | Projected poor pavement conditions. |
89 | US212 | Resurface road from I-494 to Hwy 62 in Eden Prairie | $28,270,000 | 2033 | Poor pavement conditions. |
88 | I394 | Medium mill and overlay from MN100 to Washington Ave N | $3,200,000 | Not Selected | Recent major rehab. Low RQI attributed largely to high percentage of bridge decks. Also, after a recent lane reconfiguration of WB, part of the outside lane is on rough bituminous shoulder. |
88 | I494 | Medium mill and overlay from 5th Ave to Dakota/Hennepin County Line | $13,600,000 | Not Selected | RQI does not reflect on the ground conditions |
87 | I35 | Repair road surface, I 35 from County Rd 70 to 35E/35W split and from County Road 50 to the 35E/35W split. Replace I-35 bridges over CSAH 50 & 205th St and repair I-35 bridges over Lake Marion in Burnsville and Lakeville | $75,830,000 | 2029 | Poor pavement conditions. |
85 | I494 | Medium mill and overlay from Hardman bridge to 5th Ave | $2,200,000 | Not Selected | RQI does not reflect on the ground conditions |
84 | MN280 | Resurface road, ADA, signal work, rehabilitate bridges 9471, 9472, 62033, 62034, 62843 on Hwy 280 from Wabash Ave in St Paul to north of Broadway Ave in Lauderdale and close median on Hwy 280 at Broadway Ave in Lauderdale and install signals at Kosata Ave and ramps with Energy Park Dr in St Paul | $7,700,000 | 2028 | |
84 | MN280 | Repair pavement, guardrail, rehab 7 bridges on Hwy 280 from Wabash in St Paul to junction with I-35W in Lauderdale | $25,972,000 | 2026, 2027 | Poor pavement conditions; coordinate with bridge work. |
84 | US10 | Resurface Hwy 10 from US169/MN47 to Creek Medows Bridge in Coon Rapids and Anoka | $19,620,000 | 2032 | Projected poor pavement conditions. |
83 | I694 | Medium mill and overlay from I-494/694 to Lexington Ave | $2,900,000 | Not Selected | This segment consists of older concrete pavement with recent CPR and fairly new UBOLs. 2020 RQI is very good to excellent. Minor CPR is ongoing due to dowel bar issues. |
83 | US169 | Medium mill and overlay from MN 62 to MN55 | $6,300,000 | Not Selected | Program limited by available funding. |
81 | I35W | Medium mill and overlay from Washington Ave bridge to 4th St Bridge | $1,600,000 | Not Selected | This is new pavement but is predominantly comprised of St. Anthony Falls bridge deck. 2020 RQI is excellent. |
81 | I494 | Medium mill and overlay from Tamarack bridge to Hardman bridge | $6,100,000 | Not Selected | RQI does not reflect on the ground conditions |
81 | MN7 | Resurface road from the Hennepin/Carver County line to Division St and replace bridge over County Road 82 in Excelsior | $40,910,000 | 2029 | Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride. |
81 | US169 | Resurface road from 77th Ave N to 101st Ave N | $4,400,000 | Not Selected | Poor pavement conditions. |
81 | US61 | Thin mill and overlay from Goodhue/Dakota County Line to MN316 | $9,000,000 | Not Selected | Projected poor pavement conditions. |
80 | US12 | Resurface road, upgrade ADA, drainage on TH12 from the Wright/Hennepin County line in Delano to CR 29 in Maple Plain and Construct roundabout at TH12 and County Line Road in Delano | $12,940,000 | 2028, Future | Poor pavement conditions. |
80 | US52 | Medium mill and overlay from MN65 to University Ave | $1,600,000 | Not selected | Program limited by available funding. |
80 | US52 | Resurface US 52 from Clayton to south of Inver Grove Trail; replace 2 and resurface 2 US 52 bridges over the UP Railroad, and replace the Hwy 55 bridge over US 52 in Inver Grove Heights | $54,190,000 | 2032 | |
79 | US61 | Resurface road and repair bridge 19075 on Hwy 61 (Vermillion St) from N Jct Hwy 316 (Red Wing Blvd) to 4th St in Hastings | $10,867,000 | 2027 | Poor pavement conditions. |
78 | I35W | Medium mill and overlay from 42nd st bridge to Chicago Ave Bridge | $6,500,000 | Not Selected | Construction of Lake St project at time of DIV run, bypass pavement is rough. |
78 | MN7 | Medium mill and overlay from Shady Oak Rd to Texas Ave | $3,000,000 | Not Selected | RQI does not reflect on the ground conditions |
78 | US10 | Medium mill and overlay from US61 to .1 miles east of US61 | $100,000 | Not selected | Program limited by available funding. Short piece of 4 lane east of USTH 61. Recently received a UTBWC surface treatment. |
77 | I35 | Medium mill and overlay from US 8 to MN95 | $15,700,000 | Not Selected | Program limited by available funding. Proposed thin overlay within next few years. |
77 | US8 | Resurface US 8 from W Wyoming Ave to Tern Ave in Center City | $32,032,920 | 2032 | Poor pavement conditions. |
76 | MN100 | Medium mill and overlay from I-494 to Cedar Lake Bridge | $10,900,000 | Not Selected | RQI does not reflect on the ground conditions |
76 | MN610 | Medium mill and overlay from MN252 to Mississippi River Bridge | $1,000,000 | Not Selected | Program limited by available funding. |
76 | US10 | Medium mill and overlay from Foley Blvd to MN56 | $4,100,000 | Not Selected | RQI does not reflect on the ground conditions |
76 | US212 | Repair and resurface US 212 from Mcleod/Carver County line to MN 5 in Norwood Young America | $5,362,800 | 2032 | |
76 | US52 | Medium mill and overlay from Lafayette bridge to I-94 | $200,000 | Not Selected | Program limited by available funding. |
75.5 | I35W | Resurface I 35W from Portland Ave to Washington Ave Bridge in Minneapolis | $11,020,783 | 2034 | Projected poor pavement conditions. |
75 | I35E | Medium mill and overlay from University Ave to Cayuga/Railroad Bridge | $2,100,000 | Not Selected | Program limited by available funding. Section is predominantly bridge decks. |
74 | MN25 | Medium mill and overlay from MN5 to MN7 | $3,900,000 | Not Selected | Program limited by available funding. |
74 | MN62 | Medium mill and overlay from Tracy ave bridge to Penn Ave Bridge | $3,200,000 | Not Selected | Program limited by available funding. |
74 | US10 | Resurface road, drainage on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka and intersection improvements on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka - TIED LET GROUP 10174 | $11,170,000 | 2027 | |
73 | I694 | Medium mill and overlay from County Road 10 to Anoka Isanti County Line | $1,000,000 | Not Selected | Under construction at time of DIV run. New concrete pavement at system interchange (94/494/694). |
73 | MN62 | Medium mill and overlay from 43rd Ave to Mendota Bridge | $1,600,000 | Not Selected | Program limited by available funding. |
73 | MN7 | Medium mill and overlay from Texas Ave to Railroad Bridge | $700,000 | Not Selected | RQI does not reflect on the ground conditions |
73 | US10 | Medium mill and overlay from I-35W to I694 | $3,000,000 | Not selected | RQI does not match on the ground conditions |
73 | US52 | Medium mill and overlay from Dakota County Road 42 to Clayton Ave | $800,000 | Not Selected | Program limited by available funding. |
72 | I35E | Thin mill and overlay from bridge 9532 to 10th St bridge | $5,700,000 | Not Selected | Projected poor pavement conditions. |
72 | MN7 | Resurface Hwy 7 from Hwy 25 to Carver County Line in Mayer | $13,762,776 | 2033 | Projected poor pavement conditions. |
72 | US169 | Medium mill and overlay from Catrerbury rd to Valley View Rd | $8,600,000 | Not Selected | Program limited by available funding. |
72 | US169 | Medium mill and overlay from Anderson Lakes Pkwy to Valley View Rd | $1,500,000 | Not Selected | Program limited by available funding. |
71 | MN25 | Medium mill and overlay from Scott County line to MN5 | $7,100,000 | Not selected | RQI does not match on the ground conditions |
71 | US10 | Medium mill and overlay from east of 114th Ave NW to east Foley Blvd | $2,200,000 | Not Selected | RQI does not reflect on the ground conditions |
70 | I35W | Medium mill and overlay from 76th St to 66th ST | $1,800,000 | Not Selected | Program limited by available funding. |
70 | MN62 | Resurface MN 62 from Penn Ave to Portland Ave in Minneapolis - Future Project | $26,955,808 | 2035 | Repair early distresses. |
70 | MN65 | Resurface road from NE 37th Ave CL to 53rd Ave NE | $5,270,000 | Not Selected | Projected poor pavement conditions. |
70 | US12 | Medium mill and overlay from County Road 90 to eastern Independence City limits | $400,000 | Not Selected | Program limited by available funding. |
70 | US52 | Resurface US 52 from Inver Grove Trail to Hwy 55 and Hwy 55 bridge over US 52 in Inver Grove Heights | $5,040,000 | 2032 | |
69 | MN252 | Medium mill and overlay from 85th to MN610 | $1,100,000 | Not Selected | Program limited by available funding. |
69 | MN62 | Medium mill and overlay from I-35E to US52 | $3,500,000 | Not selected | Program limited by available funding. |
69 | US212 | Medium mill and overlay from MN5 to Tacoma Ave | $3,500,000 | Not Selected | Program limited by available funding. |
69 | US52 | Medium mill and overlay from Goodhue/Dakota County Line to County Road 86 | $2,300,000 | Not Selected | Program limited by available funding. |
68 | MN65 | Medium mill and overlay from 26th St to 10th ST | $1,300,000 | Not Selected | Program limited by available funding. |
68 | US169 | Medium mill and overlay from Elm creek Blvd to Mississippi River Bridge | $500,000 | Not Selected | Program limited by available funding. |
68 | US212 | Medium mill and overlay from 2.2 miles east of MN284 to 4 lane section | $2,200,000 | Not Selected | Program limited by available funding. |
67 | I35W | Pavement repair on I35W from 66th St in Richfield to 42nd St Bridge in Minneapolis | $61,038,073 | 2034 | |
67 | MN41 | Medium mill and overlay from US169 to Pioneer Trail | $1,200,000 | Not Selected | Program limited by available funding. |
67 | MN7 | Medium mill and overlay from Railroad bridge to MN100 | $900,000 | Not Selected | Program limited by available funding. |
67 | US12 | Medium mill and overlay from Wright/Hennepin County line to Hennepin County Road 90 | $7,600,000 | Not Selected | Poor pavement conditions. |
67 | US212 | Repair US 212 from Highway 41 to County Rd. 4 in Chaska | $23,680,250 | 2032 | Preventive maintenance. |
66 | I35E | Medium mill and overlay from 76th St to 66th ST | $900,000 | Not Selected | Program limited by available funding. |
66 | MN36 | Medium mill and overlay from I35W to east of Edgerton St | $9,500,000 | Not Selected | Poor pavement conditions; maintenance liability. |
66 | MN610 | Repair road from US 169 to Mississippi River | $20,000,000 | Not Selected | Projected poor pavement conditions. |
66 | MN7 | Medium mill and overlay from I-494 to Shady Oak Road | $1,000,000 | Not Selected | Program limited by available funding. |
66 | US212 | Meduim mill and overlay from MN5 to .4 miles east of MN5 | $400,000 | Not Selected | Program limited by available funding. |
65 | I35E | Pavement repair I35E from Hwy 5 to 10th St in St. Paul | $29,604,018 | 2034 | Projected poor pavement conditions. |
65 | MN62 | Medium mill and overlay from I-494 to Clearwater Dr | $300,000 | Not Selected | Program limited by available funding. |
65 | US10 | Resurface road on Hwy 10 (Point Douglas Dr S) from Hwy 61 to the West end of the St Croix bridge in Hastings and Prescott | $7,609,482 | 2033 | Projected poor pavement conditions. 2020 RSL 10 years. |
65 | US169 | Medium mill and overlay from MN282 to MN21 | $1,400,000 | Not Selected | Program limited by available funding. |
65 | US8 | Medium mill and overlay from Tern Ave roundabout to Minnesota/Wisconsin State line | $1,900,000 | Not Selected | Program limited by available funding. |
64 | I35E | Replace pavement on I-35E from north exit of Shepard Rd to Hwy 5 (W 7th St) and replace bridge 9534 over Shepard Rd and overlay bridge 62912 in St Paul | $18,700,000 | 2026 | Poor pavement conditions. |
64 | MN55 | Resurface Road from Highway 52 to US 61 | $19,500,000 | Not Selected | Poor pavement conditions. |
64 | US12 | Medium mill and overlay from Hennepin County Road 29 to Wayzata Blvd exit | $3,000,000 | Not Selected | Program limited by available funding. |
63.5 | MN65 | Resurface Hwy 65 from 53rd to Moore Lake Dr. in Fridley | $7,086,744 | 2031 | Poor pavement conditions. |
63 | MN62 | Medium mill and overlay from Portland Ave to 28th ave | $1,800,000 | Not Selected | Program limited by available funding. |
63 | US212 | Medium mill and overlay from Tacoma Ave to Carver County Road 36 | $2,700,000 | Not Selected | Program limited by available funding. |
63 | US61 | Medium mill and overlay from 70th St to Carver Ave | $4,400,000 | Not Selected | Program limited by available funding. |
63 | US61 | Medium mill and overlay from Trailer Pk entrance to 170th St | $1,000,000 | Not selected | Program limited by available funding. |
62 | MN41 | Medium mill and overlay from MN5 to MN7 | $1,100,000 | Not selected | Program limited by available funding. |
62 | MN55 | Medium mill and overlay from Pine Bend Trail to Hastings CL | $3,500,000 | Not Selected | Program limited by available funding. |
62 | MN62 | Medium mill and overlay from Clearwater to Tracy Ave | $3,300,000 | Not Selected | Program limited by available funding. |
61 | MN62 | Medium mill and overlay from Portland Ave bridge to .154 miles east of Portland bridge | $200,000 | Not Selected | Program limited by available funding. |
61 | MN7 | Minor CPR from Kings Dr to I-494 | $800,000 | Not Selected | Poor pavement conditions. |
61 | US12 | Medium mill and overlay from Railroad bridge to 7th St | $300,000 | Not Selected | Program limited by available funding. |
60 | I694 | Resurface I-694 from Dupont Ave to I-35W, and resurface I-694 bridges over TH65, Mississippi River, and TH 252 in New Brighton | $70,187,280 | 2031 | Projected poor pavement conditions. |
60 | MN62 | Reconstruct road, curb and gutter, guardrail, drainage, sidewalk, railing replacement and repair bridge #27521 on Hwy 62 from 28th Ave to 0.1 miles E of 43rd Ave in Mpls - TIED LET GROUP 10170 | $25,500,000 | 2027, 2028 | Poor pavement conditions. |
60 | MN77 | Medium mill and overlay from Minnesota River bridge to I-494 | $3,100,000 | Not Selected | Program limited by available funding. |
60 | US212 | Medium mill and overlay from Chaska Creek to MN41 | $1,700,000 | Not Selected | Program limited by available funding. |
59 | I35W | Medium mill and overlay from County Road C to Sunset Ave | $15,100,000 | Not Selected | Program limited by available funding. |
59 | MN25 | Resurface MN 25 from US 212 to MN 5 in Norwood Young America | $3,597,000 | 2032 | Projected poor pavement conditions. 2020 RSL 11 years. |
59 | MN252 | Medium mill and overlay from I-94 WB in Brooklyn Center to .4 miles north of I-94 | $500,000 | Not Selected | Program limited by available funding. |
59 | MN36 | Medium mill and overlay from Washington Ave to MN95 | $1,800,000 | Not Selected | Program limited by available funding. |
59 | US10 | Medium mill and overlay from Fairoak Ave to US169/MN47 | $900,000 | Not Selected | Program limited by available funding. |
59 | US169 | Medium mill and overlay from .1 miles north of Ash St to 1.2 miles north of Ash St | $1,300,000 | Not Selected | Program limited by available funding. |
58 | I35W | Resurface road, replace bridge 6583, construct auxiliary lanes, construct additional southbound exit at CR 42, signal system, roadway lighting, and ADA improvements from I-35W/I-35E split to 0.4 miles north of Cliff Rd in Burnsville and replace bridge 9779 and 9780 and install cable median barrier on Hwy 13 and Construct additional SB exit ramp and roundabout from I-35W to Buck Hill Rd and Replace bridge 19863 at I35W and Burnsville Parkway in Burnsville and Install continuous street lighting on I-35W/Hwy 13 to I-35E in Burnsville | $97,220,000 | 2025, 2026 | Mobility needs; bridge replacement coordination. |
58 | US169 | Medium mill and overlay from Elm Creek Blvd to US10 | $1,400,000 | Not Selected | Program limited by available funding. |
58 | US169 | Medium mill and overlay from 4.5 miles north of MN19 to 5.7 miles north of MN19 | $1,100,000 | Not Selected | Program limited by available funding. |
58 | US212 | Medium mill and overlay from 4 lane section to Chaska Creek | $2,700,000 | Not Selected | Program limited by available funding. |
58 | I35W | Reconstruct and widen bituminous shoulders, construct bituminous crossovers and temporary drainage and on Hwy 35W from Hwy 35W/Hwy 35E split to 0.4 mi N of Cliff Rd and on Hwy13 at Hwy 35W | $2,766,360 | 2025 | |
57 | US169 | Medium mill and overlay from LeSueur/Scott County line to MN19 | $400,000 | Not Selected | Program limited by available funding. |
57 | US61 | Medium mill and overlay from RP163 to 250TH St | $200,000 | Not selected | Program limited by available funding. |
57 | MN62 | Resurface roadway and bridges, improve ADA, install cable median barrier, signals on TH62 from 0.1 miles west TH13 to 5th Ave S in Mendota Heights | $13,255,000 | 2028 | |
56 | MN610 | Medium mill and overlay from I-94 to Elm Creek Blvd | $2,400,000 | Not Selected | Program limited by available funding. |
55 | I694 | Medium mill and overlay from Lexington Ave to MN49 | $4,600,000 | Not Selected | Program limited by available funding. |
55 | MN62 | Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater | $400,000 | Not Selected | Program limited by available funding. |
54 | I494 | Medium mill and overlay from US12 to I-94 | $12,800,000 | Not Selected | Program limited by available funding. |
54 | US10 | Resurface road from MN 65 to the north junction I-35W - Future Project | $7,500,000 | Not selected | Poor pavement conditions; bad longitudinal joints. |
54 | US212 | Medium mill and overlay from .1 miles south of MN62 to MN62 | $1,000,000 | Not Selected | Program limited by available funding. |
51 | US52 | Unbonded concrete overlay from Clayton to I-494 | $43,300,000 | Not Selected | Poor pavement conditions. |
50 | I35 | Medium mill and overlay from Scott County road 2 to MN50 | $6,400,000 | Not Selected | Program limited by available funding. |
46 | MN55 | Resurface MN 55 from the Wright-Hennepin county line to Fernbrook in Plymouth | $28,710,000 | 2029 | |
45 | I35 | Medium mill and overlay from MN95 to Chisago County Road 9 | $6,700,000 | Not Selected | Program limited by available funding. |
43 | I94 | Medium mill and overlay from Mounds Blvd to Ramsey/Washington County line | $6,800,000 | Not Selected | Program limited by available funding. |
43 | MN65 | Repair road from 217th Ave to Anoka-Isanti County line | $18,000,000 | Not Selected | Repair early distresses. |
41 | MN77 | Resurface Hwy 77 (Cedar) from 138th St (Hwy 23) to the Dakota-Hennepin County line in Apple Valley | $62,184,000 | 2026, 2027 | Poor pavement conditions. |
40 | US8 | Expand from two-lane undivided to four-lane divided roadway, signals, trail bridges on Hwy 8 from Chisago County line in Wyoming to Karmel Ave/Wyoming Ave in Chisago City and reconstruct Hwy 8 from I-35 to Chisago County line in Forest Lake and Resurface, drainage repair, construct pond from jct I-35 in Forest Lake to 0.1 miles west of Wyoming Ave in Chisago City, and construct left turn lane on Hwy 8 (Lake Blvd) at Hazel Ave and close 250th St at MN 8 in Wyoming Township and Construct J turn at Hale Ave and close Hazel Ave, Hamlet Ave, 250th St, and 14 driveway access points on Hwy 8 (Lake Blvd) in Wyoming Township | $80,962,000 | 2026, 2028 | Coordination with County safety improvements. Poor pavement conditions. |
39 | I35E | Replace short segment of pavement either side of bridge 9532 | $3,000,000 | Not Selected | Poor pavement conditions. Coordinate with Shepard Rd bridge replacement. |
39 | I694 | Major rehabilitation from MN49 to Washington County Road 10 | $18,400,000 | Not Selected | Repair early distresses. |
39 | US12 | Resurface road, lighting, drainage improvements, ADA, pier protection on bridges 27129 and 27130 on Hwy 12 (Wayzata Blvd) from 0.5 miles west Shoreline Dr in Wayzata to 0.5 miles east of I-494 in Wayzata and Minnetonka | $48,448,000 | 2026, 2027 | Poor pavement conditions. |
38 | I94 | Medium mill and overlay from Exit 207 to I494 | $14,500,000 | Not Selected | Program limited by available funding. |
36.5 | I694 | Pavement rehab on I694 from 0.5 miles E Hwy 49 to Hwy 61 in Vadnais Heights and Little Canada | $27,380,000 | 2034 | |
36 | US12 | Thin mill and overlay from the eastern Independence City limits to Hennepin County Road 29 | $3,800,000 | Not Selected | Poor pavement conditions. |
36 | US169 | Medium mill and overlay from Valley View Rd to US 212/MN62 | $1,900,000 | Not Selected | Program limited by available funding. |
35 | MN55 | Medium mill and overlay from General Mills Blvd to Schaper Rd | $2,100,000 | Not Selected | Program limited by available funding. |
34 | US169 | Resurface road on Hwy 169 from the north end of Bloomington Ferry bridge to Anderson Lakes bridge in Eden Prairie | $11,078,760 | 2033 | Poor pavement conditions. |
33 | I94 | Medium mill and overlay from Wright/Hennepin County line | $3,400,000 | Not Selected | Program limited by available funding. |
33 | MN25 | Resurface road from US 169 to Minnesota River bridge in Belle Plaine | $2,375,000 | 2032 | Poor pavement conditions. |
33 | US61 | Resurface US 61 from 3rd St. to US 10 in Hastings | $8,175,000 | 2032 | Poor pavement conditions. |
32.5 | I694 | Resurface road on Hwy 694 from Hwy 49 to Hwy 61 in Vadnais Heights and White Bear Lake | $10,464,000 | 2033 | Repair early distresses. |
32 | MN280 | Unbonded overlay from Como to I-35W | $23,400,000 | Not selected | Poor pavement conditions. |
32 | US61 | Medium mill and overlay from RP155 to 170th ST | $200,000 | Not selected | Program limited by available funding. |
31 | MN41 | Repair MN 41 from County Hwy 61 to Hundertmark Rd in Chaska | $16,977,840 | 2030 | Poor pavement conditions. |
31 | MN7 | Repair road from W end of 494 bridge. to I-494 | $500,000 | Not Selected | Poor pavement conditions. |
29 | I35E | Medium mill and overlay from Cayuga to Little Canada Rd | $7,700,000 | Not Selected | Program limited by available funding. |
29 | I494 | Medium mill and overlay from I-94/694 to Lake Dr | $2,300,000 | Not Selected | Program limited by available funding. |
29 | MN610 | Medium mill and overlay from Elm Creek Blvd to US 169 | $2,700,000 | Not Selected | Program limited by available funding. |
29 | MN65 | Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 | $3,100,000 | Not Selected | Program limited by available funding. |
29 | US10 | Medium mill and overlay from MN101 to Cleveland Ave | $3,400,000 | Not Selected | Program limited by available funding. |
29 | US61 | Medium mill and overlay from 267th St to I35 | $300,000 | Not selected | Program limited by available funding. |
28.5 | US169 | Resurface TH 169 from CR15 to NE end of bridge 27624A in Shakopee | $50,782,100 | 2028, Future | Poor pavement conditions. |
28 | I35E | Medium mill and overlay from Ramsey County Road 96 to 80th St | $10,600,000 | Not Selected | Program limited by available funding. |
27 | I35W | Medium mill and overlay from Sunset Ave to I35W/I35E | $7,100,000 | Not Selected | Program limited by available funding. |
25 | I35 | Medium mill and overlay from I35W/E to US8 | $6,400,000 | Not Selected | Program limited by available funding. |
25 | I35 | Medium mill and overlay from Chisago County Road 9 to Chisago/Pine County line | $8,600,000 | Not Selected | Program limited by available funding. |
25 | MN610 | Repair and resurface Hwy 610 from Mississippi River to Coon Rapids Blvd in Coon Rapids | $19,620,000 | 2033 | |
23 | I494 | Medium mill and overlay from I94/694 to Tamarack Rd | $800,000 | Not Selected | Program limited by available funding. |
23 | US212 | Resurface pavement on Hwy 212, Hwy 5 (W 78th St) from 0.37 miles east of Eden Prairie Rd to Hwy 212 and on Hwy 212 from 0.1 mile west of Eden Prairie Rd to 0.1 mile east of I494 in Eden Prairie | $6,741,000 | 2025 | |
21 | US169 | Medium mill and overlay from MN19 to MN25 | $4,500,000 | Not Selected | Program limited by available funding. |
18 | MN316 | Resurface pavement on Hwy 316 (Red Wing Blvd) from south jct Hwy 61 to Tuttle in Hastings and construct turn lanes at various locations on Hwy 316 (Red Wing Blvd) in Ravenna Township | $11,800,000 | 2025 | Poor pavement conditions. |
18 | MN55 | Resurface pavement, overlay bridge 27237, construct trail, guardrail, ADA and turn lane reconstruction at Dahlberg Drive on Hwy 55 (Olson Memorial Pkwy) from 0.2 miles west of Hwy 100 in Golden Valley to east end of bridge over BNSF tracks in Mpls | $7,200,000 | 2025 | Poor pavement conditions. |
18 | US169 | Medium mill and overlay from 93rd Ave to Elm Creek Blvd | $4,000,000 | Not Selected | Program limited by available funding. |
18 | US169 | Medium mill and overlay from 1.2 miles north of MN282 to .27 miles north of MN282 | $5,900,000 | Not Selected | Program limited by available funding. |
17.5 | MN41 | Resurface MN 41 from 0.17 mi S of Hundermark to 0.23 mi N of Pioneer Trail in Chaska | $10,428,131 | 2034 | RQI does not match on the ground conditions |
17.2 | US52 | Resurface pavement, replace signs and mark pavement on TH52 from Belvidere St to I94 in St Paul | $2,300,000 | 2025 | |
17 | I35E | Medium mill and overlay from County Road E to County Road 96 | $2,300,000 | Not Selected | Program limited by available funding. |
17 | MN55 | Resurface Hwy 55 from County Road 63 to US 52 in Eagan and Inver Grove Heights | $9,170,000 | 2032 | Poor pavement conditions. |
17 | US52 | Resurface US 52 from Hwy 55 from County Road 63 in Inver Grove Heights | $9,156,000 | 2032 | Poor pavement conditions. |
16.5 | MN252 | Resurface Hwy 252 from I-94 to 85th Street in Brooklyn Center and Brooklyn Park | $11,118,000 | 2033 | Poor pavement conditions. Coordination with 252 CoC project. |
15 | US169 | Medium mill and overlay from MN25 to Ash St | $1,800,000 | Not Selected | Program limited by available funding. |
15 | US212 | Repair road from Highway 41 to County Rd. 4 in Chaska and Eden Prairie | $51,573,104 | 2034 | |
11.5 | US61 | Resurface Hwy 61 from Hwy 97 to N of Hwy 8 in Forest Lake | $6,698,268 | 2029 | Poor pavement conditions. |
11 | I35E | Medium mill and overlay from south of I-35W to I35E/W | $1,300,000 | Not Selected | Program limited by available funding. |
5 | MN55 | Resurface roadway, sidewalk, ADA and signal replacement on TH 55 west of BNSF bridge in Golden Valley to I-94 in Mpls. Resurface TH55 bridge 27785 over I-94 and replace bridge 5908 over Bassett Creek | $19,158,000 | 2028 | Poor pavement conditions. Frontage road and ADA needs. |