National Highway System pavement projects
MnDOT Metro District
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- Metro District project selection
- Metro District Non-National Highway System pavement projects
- Metro District Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated October 2022
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
29 | MN610 | Medium mill and overlay from Elm Creek Blvd to US 169 | $2,700,000 | Not Selected | Program limited by available funding. |
31 | MN41 | Repair road from Count Hwy 61 to Hundertmark Rd | $12,980,000 | 2032 | Poor pavement conditions. |
32 | MN280 | Unbonded overlay from Como to I-35W | $23,400,000 | 2027 | Poor pavement conditions. |
33 | MN25 | Resurface road from US 169 to Minnesota River bridge | $2,400,000 | 2031 | Poor pavement conditions. |
35 | MN55 | Medium mill and overlay from General Mills Blvd to Schaper Rd | $2,100,000 | Not Selected | Program limited by available funding. |
46 | MN55 | Resurface road from the Wright-Hennepin county line to Fernbrook | $22,000,000 | 2028 | Poor pavement conditions. |
53 | MN62 | Resurface road from 28th Ave to MN 55 | $10,000,000 | 2027 | Poor pavement conditions. |
55 | MN62 | Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater | $400,000 | Not Selected | Program limited by available funding. |
56 | MN610 | Medium mill and overlay from I-94 to Elm Creek Blvd | $2,400,000 | Not Selected | Program limited by available funding. |
57 | MN62 | Repair pavement on Hwy 62 between Hwy 13 and 0.2 miles east of I-35E in Mendota Heights | $5,172,000 | 2024 | Poor pavement conditions. |
59 | MN25 | Resurface road from US 212 to MN 5 | $2,600,000 | 2031 | Projected poor pavement conditions. 2020 RSL 11 years. |
59 | MN252 | Medium mill and overlay from I-94 WB in Brooklyn Center to .4 miles north of I-94 | $500,000 | Not Selected | Program limited by available funding. |
59 | MN36 | Medium mill and overlay from Washington Ave to MN95 | $1,800,000 | Not Selected | Program limited by available funding. |
61 | MN62 | Medium mill and overlay from Portland Ave bridge to .154 miles east of Portland bridge | $200,000 | Not Selected | Program limited by available funding. |
62 | MN41 | Resurface Hwy 41 from 0.23 miles north of Pioneer Trl in Chaska to Hwy 5 (Arboretum Blvd) in Chanhassen | $1,834,000 | 2023 | Poor pavement conditions. |
62 | MN41 | Medium mill and overlay from MN5 to MN7 | $1,100,000 | Not selected | Program limited by available funding. |
62 | MN55 | Resurface pavement, construct trail and turn lane reconstruction at Dahlberg Drive on Hwy 55 (Olson Memorial Pkwy) from 0.2 miles west of Hwy 100 in Golden Valley to west end of bridge over BNSF tracks in Mpls | $3,337,000 | 2025 | Poor pavement conditions. |
62 | MN55 | Medium mill and overlay from Pine Bend Trail to Hastings CL | $3,500,000 | Not Selected | Program limited by available funding. |
62 | MN62 | Medium mill and overlay from Clearwater to Tracy Ave | $3,300,000 | Not Selected | Program limited by available funding. |
63 | MN55 | Repair road from County Rd 63 to US 52 | $7,000,000 | 2028 | Poor pavement conditions. |
63 | MN62 | Medium mill and overlay from Portland Ave to 28th ave | $1,800,000 | Not Selected | Program limited by available funding. |
64 | MN55 | Resurface Road from Highway 52 to US 61 | $19,500,000 | 2030 | Poor pavement conditions. |
64 | MN610 | Repair and resurface MN 610 from Mississippi River to Coon Rapids Blvd | $15,000,000 | 2028 | |
65 | MN55 | Resurface roadway, sidewalk ADA and signal replacement on MN 55 west of BNSF bridge to I-94 | $5,800,000 | 2026 | Poor pavement conditions. Frontage road and ADA needs. |
65 | MN62 | Medium mill and overlay from I-494 to Clearwater Dr | $300,000 | Not Selected | Program limited by available funding. |
66 | MN36 | Resurface pavement on Hwy 36 from Jct I-35W in Roseville to just east Edgerton in Maplewood/Little Canada and extend auxiliary lane and reconstruct ramp at I-35W SB/Cleveland Ave to Hwy 36 EB | $12,352,000 | 2025 | Poor pavement conditions; maintenance liability. |
66 | MN610 | Repair road from US 169 to Mississippi River | $20,000,000 | 2031 | Projected poor pavement conditions. |
67 | MN41 | Medium mill and overlay from US169 to Pioneer Trail | $1,200,000 | Not Selected | Program limited by available funding. |
68 | MN252 | Resurface road from I-94 to 85th St | $8,500,000 | 2031 | Poor pavement conditions. Coordination with 252 CoC project. |
69 | MN252 | Medium mill and overlay from 85th to MN610 | $1,100,000 | Not Selected | Program limited by available funding. |
69 | MN316 | Resurface pavement on Hwy 316 (Red Wing Blvd) from south jct Hwy 61 to Tuttle in Hastings and widen shoulder at various locations on Hwy 316 (Red Wing Blvd) in Ravenna Township | $6,222,000 | 2025 | Poor pavement conditions. |
69 | MN62 | Medium mill and overlay from I-35E to US52 | $3,500,000 | Not selected | Program limited by available funding. |
71 | MN25 | Medium mill and overlay from Scott County line to MN5 | $7,100,000 | Not selected | RQI does not match on the ground conditions |
72 | MN280 | Repair pavement, guardrail, rehab 13 bridges on Hwy 280 from junction with I-94 in St Paul to junction with I-35W in Roseville and close median on Hwy 280 at Broadway in Lauderdale and install signals at Kosata Ave and ramps with Energy Park Dr in St Paul | $25,763,000 | 2026, Future | Poor pavement conditions; coordinate with bridge work. |
73 | MN62 | Medium mill and overlay from 43rd Ave to Mendota Bridge | $1,600,000 | Not Selected | Program limited by available funding. |
74 | MN25 | Medium mill and overlay from MN5 to MN7 | $3,900,000 | Not Selected | Program limited by available funding. |
74 | MN62 | Medium mill and overlay from Tracy ave bridge to Penn Ave Bridge | $3,200,000 | Not Selected | Program limited by available funding. |
75 | MN41 | Resurface road including pavement marking and guardrail work at Hwy 41 intersection with Peavey Rd in Chaska | $82,000 | 2023 | |
76 | MN100 | Medium mill and overlay from I-494 to Cedar Lake Bridge | $10,900,000 | Not Selected | RQI does not reflect on the ground conditions |
76 | MN610 | Medium mill and overlay from MN252 to Mississippi River Bridge | $1,000,000 | Not Selected | Program limited by available funding. |
80 | MN62 | Resurface road from Penn Ave to Portland Ave | $11,000,000 | 2032 | Repair early distresses. |
82 | MN55 | Repair pavement and bridge culverts 6732 and 6745 and add turn lane on Hwy 55 (Olson Memorial Hwy) from Old Rockford Rd in Plymouth to just east General Mills Blvd in Golden Valley | $18,102,000 | 2024 | Poor pavement conditions. |
96 | MN100 | Resurface road from the Cedar Lake Rd to I-694 | $18,000,000 | 2027 | Poor pavement conditions; preventive maintenance. |