National Highway System pavement projects
MnDOT Metro District
How the projects scored in 2020
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated December 2020
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
96 | I-494 | Medium mill and overlay from Hardman Ave to 5th Ave | $2,000,000 | Not Selected | Resurfaced in 2019 |
95 | I-94 | Medium mill and overlay from Nicollet Ave Bridge to Western Ave | $42,500,000 | 2028 | |
95 | I-94 | Medium mill and overlay from County Road 13 to Hwy95 | $4,000,000 | 2023 | |
95 | I-494 | Minor resurfacing from France Ave to Hwy12 | $26,000,000 | 2029 | |
94 | I-35E | Major reconstruction from I35W to Lone Oak Rd | $34,400,000 | 2026 | |
94 | I-694 | Minor resurfacing from Hwy 49 to Washington County Road 10 | $14,000,000 | 2029 | |
91 | US 169/US 12 | Medium mill and overlay on 169 from Hwy 55 to 77th ave and on Hwy 12 from Hennepin County Road 9 to Reference point 148 | $4,100,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
90 | I-35E | Minor reconstruction from Little Canada road to County Road E | $1,800,000 | 2029 | |
89 | I-94 | Unbonded overlay from Ramsey/Washington County Line to Washington County Road 13 | $8,600,000 | 2023 | |
89 | I-35W | Major rehabilitation from South of 106th St to 90th St | $2,700,000 | 2023 | |
88 | I-94 | Medium mill and overlay from Hwy101 overpass to Hennepin County Road 81 | $1,400,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
88 | US 52 | Major rehabilitation from I-494 to Concord Blvd | $2,800,000 | 2021 | |
87 | I-94 | Medium mill and overlay from Hwy95 to Minnesota river Bridge | $1,500,000 | 2023 | |
87 | I-394 | Medium mill and overlay from Hwy100 to Xerxes Ave | $2,200,000 | Not Selected | Many bridge decks adversely affect smoothness. |
86 | I-94 | Major rehabilitation from Western Ave to I-35E | $1,100,000 | 2022 | |
86 | I-494 | Medium mill and overlay from 5th Ave to Peiper Rd | $4,500,000 | Not Selected | |
86 | MN 101 | Medium mill and overlay from I-94 to Moore Lake Rd | $4,000,000 | 2025 | |
86 | I-35W | Medium mill and overlay from Hwy36 to County Road C | $2,100,000 | Not Selected | Resurfaced in 2017 |
86 | I-35E | Major reconstruction from 10th St bridge to University Ave bridge | $1,200,000 | 2022 | |
85 | MN 65 | Medium mill and overlay from Hwy10 to 117th Ave | $4,800,000 | Not Selected | |
85 | I-694 | Medium mill and overlay from Hwy49 to I-35E | $1,200,000 | 2029 | |
84 | US 169 | Medium mill and overlay from Hwy 55 to 77th Ave | $3,900,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
84 | US 10 | Whitetop overlay from Hwy169 to Creek Meadows Bridge | $15,600,000 | 2030 | |
84 | I-35W | Medium mill and overlay from 4th St to Hwy36 | $5,800,000 | Not Selected | Resurfaced in 2017 |
84 | I-35W | Minor reconstruction from 66th St to 42nd St | $3,700,000 | 2028 | |
84 | I-394 | Thin mill and overlay from I-494 to Hwy 100 | $28,000,000 | 2029 | |
83 | I-694 | Medium mill and overlay from County Road 10 to Reference point 58 north of I-94 | $1,000,000 | Not Selected | Data collected during System Interchange construction. |
82 | US 12 | Medium mill and overlay from Wright/Hennepin County Line to Independence eastern City limits | $8,000,000 | 2029 | |
82 | I-35 | Medium overlay from Dakota County Road 70 to I35 | $19,300,000 | 2029 | |
82 | I-694 | Medium mill and overlay from I35W to Lexington Ave | $700,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
81 | I-94 | Unbonded overlay from Washington County Road 13 to Hwy 95 | $14,600,000 | 2023 | |
81 | US 169 | Medium mill and overlay from Anderson Lake Bridge to Valley View Rd | $700,000 | Not Selected | Interchange area - numerous bridge decks. |
81 | I-35W | Medium mill and overlay from Washington bridge to 4th St bridge | $1,600,000 | Not Selected | St. Anthony Falls Bridge. |
80 | US 10 | Thin mill and overlay from Hwy 65 to I35W | $7,700,000 | 2026 | |
80 | I-694 | Major rehabilitation and overlay from I-94 to Hwy252 | $500,000 | 2021 | |
79 | US 169 | Medium mill and overlay from Scott County road 18 bridge to Minnesota River Bridge | $1,600,000 | Not Selected | |
79 | MN 100 | Medium mill and overlay from Cedar Lake Road to Railroad bridge | $9,900,000 | 2026 | |
79 | I-35 | Medium mill and overlay from .05 miles north of County road 2 to 1 mile north of County Road 2 | $500,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
78 | I-494 | Medium mill and overlay from I-94/I-694 to Jct I-94 | $100,000 | Not Selected | Bridge deck affects smoothness. |
78 | US 169 | Medium mill and overlay from Cedar Lake Road to Hwy 55 | $1,100,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
78 | I-35 | Whitetop overlay from Hwy8 to Hwy 95 | $63,900,000 | 2027 | |
77 | I-94 | Medium mill and overlay from Brooklyn Blvd to Humboldt bridge | $2,200,000 | 2021 | |
77 | US 212 | Minor overlay from McLeod/Carver County line to Hwy 5 | $1,700,000 | 2028 | |
77 | US 8 | Unbonded overlay from Wyoming Ave to Tern Ave | $33,300,000 | 2030 | |
77 | US 61 | Whitetop overlay from Carver Ave to I-94 | $23,900,000 | 2030 | |
76 | US 52 | Medium mill and overlay from Lafayette Bridge to under I-94 | $100,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
76 | MN 100 | Medium mill and overlay from .04 miles south of Hwy 62 to 1.3 miles north of Hwy 62 | $2,100,000 | Not Selected | Bridge decks affect smoothness rating. |
74 | MN 100 | Minor overlay from Railroad Bridge to Hennepin County Road 152 | $4,500,000 | 2026 | |
73 | US 212 | Minor overlay from Hennepin County Road 4 to I-494 | $4,000,000 | 2027 | |
73 | US 52 | Medium mill and overlay from Dakota County road 42 to Clayton Ave | $800,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
73 | MN 7 | Medium mill and overlay from Shady Oak rd. to Texas Ave | $2,700,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
73 | US 169 | Major rehabilitation from 173rd St to Shakopee Bypass | $2,200,000 | 2024 | |
73 | US 10 | Medium mill and overlay from Cleveland Fairoak Ave | $14,100,000 | 2026 | |
73 | MN 280 | Major reconstruction from I-94 to Como Ave | $7,700,000 | 2026 | |
73 | MN 610 | Medium mill and overlay from Mississippi River Bridge to east of Coon Rapids Blvd | $1,200,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
73 | I-394 | Medium mill and overlay from HOV overpass to I-94 | $200,000 | Not Selected | Many bridge decks adversely affect smoothness. |
73 | MN 610 | Medium mill and overlay from East of Coon Rapids Blvd to Hwy10 | $1,120,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
72 | US 52 | Medium mill and overlay from Dakota County Road 86 to Hwy 50 | $5,200,000 | Not Selected | |
72 | MN 55 | Medium mill and overlay from Wright/Hennepin County line to Fernbrook | $22,400,000 | 2027 | |
72 | MN 7 | Medium mill and overlay from Hwy25 to end of Six mile creek | $9,700,000 | 2030 | |
72 | US 12 | Medium mill and overlay from Hennepin County Road 101 Bridge to east of Crosby Rd | $6,800,000 | 2025 | |
72 | MN 62 | Medium mill and overlay from 43rd Ave to Mendota Bridge | $1,400,000 | 2026 | |
72 | I-35E | Thin mill and overlay from Railroad Bridge to 10th St Bridge | $10,000,000 | 2027 | |
71 | MN 55 | Medium mill and overlay from 13th Ave to 32nd st | $2,900,000 | Not Selected | |
71 | MN 7 | Medium mill and overlay from Division st to Hennepin County Road 101 | $2,800,000 | 2026 | |
71 | MN 65 | Major rehabilitation from 229th Ave to 217th Ave | $6,600,000 | 2024 | |
71 | US 169 | Major rehabilitation from Shakopee bypass to Reference point 102 | $200,000 | 2026 | |
71 | MN 100 | Medium mill and overlay from I-494 to Hwy62 | $2,500,000 | Not Selected | |
71 | I-394 | Medium mill and overlay from I-94 to Washington Ave | $1,200,000 | Not Selected | Many bridge decks adversely affect smoothness. |
71 | MN 610 | Medium mill and overlay from 1.2 miles east of Mississippi River Bridge to east of Coon Rapids Blvd | $210,000 | Not Selected | Not a district priority will continue to monitor pavement performance |
70 | MN 7 | Medium mill and overlay from Bridge #8518 to Carver County Road 33 | $200,000 | Not Selected | |
70 | US 169 | Medium mill and overlay from the Shakopee bypass to Scott County Road 15 | $100,000 | Not Selected | |
70 | MN 610 | Medium mill and overlay from Coon Rapids Blvd overpass to 1.2 miles east of Mississippi River Bridge | $320,000 | Not Selected | |
69 | US 212 | Medium mill and overlay from Hwy 5 to Faxon Rd | $3,200,000 | Not Selected | |
69 | MN 316 | Medium mill and overlay from south junction with Hwy61 to northern junction with Hwy61 in Hastings | $8,700,000 | 2025 | |
69 | US 10 | Medium mill and overlay from east of Fairoak aver to Jct Hwy169/Hwy47 | $900,000 | Not Selected | |
69 | MN 252 | Medium mill and overlay from 85th Ave to Hwy610 | $600,000 | Not Selected | |
68 | US 212 | Medium mill and overlay from 2.2 miles east of Hwy 284 to reference point 145 (begin 4 lane section) | $1,100,000 | Not Selected | |
68 | MN 7 | Medium mill and overlay from Railroad bridge to Wooddale Ave | $700,000 | Not Selected | |
68 | MN 65 | Medium mill and overlay from 143rd Ave to 229th Ave | $500,000 | Not Selected | |
68 | MN 65 | Medium mill and overlay from Bunker Lake Blvd to Anoka County Road 61 | $1,000,000 | Not Selected | |
68 | MN 65 | Medium mill and overlay from east of Reference point 13 to Bunker Lake Blvd | $700,000 | Not Selected | |
68 | US 169 | Major Reconstruction from Scott County Road 15 to Canterbury Road | $10,900,000 | 2026 | |
68 | MN 62 | Minor overlay from Penn Ave to Portland Ave | $2,100,000 | 2026 | |
67 | US 212 | Minor overlay from Hwy 41 to Hennepin County Road 4 | $12,000,000 | 2030 | |
67 | US 52 | Medium mill and overlay from Hwy 19 to Goodhue/Dakota County Line | $400,000 | Not Selected | |
67 | MN 55 | Medium mill and overlay from Mendota Heights Blvd to Hwy149 | $800,000 | Not Selected | |
67 | MN 55 | Medium mill and overlay from Hwy 100 to Lyndale Ave | $13,000,000 | 2025 | |
67 | US 169 | Medium mill and overlay from Elm Creek Blvd. to Old 252 in Champlin | $400,000 | Not Selected | |
67 | US 10 | Medium mill and overlay from .2 miles west I-694 bridge to I-694 | $500,000 | Not Selected | |
67 | US 61 | Medium mill and overlay from EB I-94 exit ramp to Jct I-94 | $100,000 | Not Selected | |
67 | US 61 | Medium mill and overlay from Roselawn aver to Hwy 36 | $1,100,000 | Not Selected | |
67 | MN 62 | Medium mill and overlay from Mendota Bridge to I-35E | $7,300,000 | 2025 | |
67 | MN 252 | Thin mill and overlay from Brooklyn Center to 85th | $12,300,000 | 2029 | |
66 | US 52 | Medium mill and overlay from Inver Grove Trail to Hwy 55. | $3,600,000 | 2028 | |
66 | MN 55 | Medium mill and overlay from 46th St to Minnehaha Bridge | $1,900,000 | Not Selected | |
66 | MN 7 | Reclaim and overlay from east end of Six mile creek to Division St | $29,600,000 | 2026 | |
66 | MN 41 | Medium mill and overlay from Hwy169 to Railroad crossing | $400,000 | Not Selected | |
66 | MN 41 | Medium mill and overlay from Railroad Crossing to Scott/Carver County line | $300,000 | Not Selected | |
65 | US 52 | Medium mill and overlay from Concord Blvd to Plato Blvd | $900,000 | Not Selected | |
65 | US 52 | Unbonded overlay from Hwy 50 to Dakota County Road 42 | $25,900,000 | 2023 | |
65 | MN 7 | Medium mill and overlay from I-494 to Shady Oak Road. | $400,000 | Not Selected | |
65 | MN 7 | Medium mill and overlay from Wooddale Ave to Hwy 100 | $300,000 | Not Selected | |
65 | US 12 | Medium mill and overlay from .01 miles east of Reference point 148 to .45 miles east of Reference point 148 | $200,000 | Not Selected | |
65 | US 10 | Medium mill and overlay from East of Foley Blvd to Hwy 65 bridge | $2,700,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
65 | US 61 | Medium mill and overlay from I-694 to White Bear Ave | $2,500,000 | Not Selected | |
65 | US 61 | Major rehabilitation from .7 miles west of Hwy 316 to Hwy 316 | $2,500,000 | 2026 | |
65 | MN 62 | Medium mill and overlay from I-494 to Clearwater Dr | $300,000 | Not Selected | |
65 | MN 62 | Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater Dr | $400,000 | Not Selected | |
64 | MN 55 | Medium mill and overlay from Hwy52 to Hwy61 | $27,000,000 | 2028 | |
64 | US 10 | Medium mill and overlay from south of Ramsey County Road 96 to North of I-694 | $700,000 | Not Selected | |
64 | MN 62 | Medium mill and overlay from Tracey Ave to Penn Ave | $9,500,000 | 2026 | |
64 | MN 77 | Medium mill and overlay from Hwy 13 to Dakota/ Hennepin County Line | $4,500,000 | 2026 | |
64 | MN 610 | Major Reconstruction from Hwy169 to Braun Dr | $20,500,000 | 2029 | |
63 | MN 55 | Medium mill and overlay from Hwy 149 to Dakota County Road 63 | $500,000 | 2022 | |
63 | MN 55 | Medium mill and overlay from Hwy 149 to Dakota County Road 63 | $600,000 | Not Selected | |
63 | MN 55 | Major Reconstruction from Dakota County Road 63 to Hwy52 | $6,100,000 | 2028 | |
63 | MN 41 | Medium mill and overlay from Engler Blvd to Pioneer Trail | $600,000 | Not Selected | |
63 | MN 41 | Medium mill and overlay from Pioneer Trail to Hwy 5 | $600,000 | Not Selected | |
62 | MN 65 | Medium mill and overlay from 53rd Ave NE to Reference Point 7 | $4,000,000 | 2027 | |
62 | MN 101 | Medium mill and overlay from Mississippi River Bridge to Hwy10 | $300,000 | Not Selected | |
62 | US 61 | Medium mill and overlay from Forest Lake Circle to south of 250th St (RP163) | $400,000 | Not Selected | |
61 | US 212 | Unbonded overlay from I-494 to Hwy 62 | $23,400,000 | 2030 | |
61 | MN 101 | Major rehabilitation from Hwy 5 to Town Line Rd | $500,000 | 2024 | |
61 | US 61 | Medium mill and overlay from Frenchman Rd to Trailer park entrance | $200,000 | Not Selected | |
61 | MN 41 | Minor overlay from Carver County Road 61 to South of Engler Blvd | $4,900,000 | 2028 | |
60 | US 212 | Medium mill and overlay from Faxon Rd to Carver County Road 134 | $600,000 | Not Selected | |
60 | US 61 | Medium mill and overlay from Chisago County Road 31 to 267th St in Wyoming | $100,000 | Not Selected | |
60 | US 61 | Major rehabilitation from Hwy 97 to south of 170th St Roundabout | $2,800,000 | 2030 | |
60 | I-694 | Unbonded overlay from I-694 to I-35W | $103,100,000 | 2030 | |
59 | US 52 | Medium mill and overlay from Goodhue/Dakota County line to Dakota County Road 86 | $2,300,000 | Not Selected | |
59 | US 10 | Medium mill and overlay from Hwy 61 to Saint Croix River Bridge | $3,400,000 | 2027 | |
59 | MN 77 | Medium mill and overlay from Minnesota River Bridge to I-494 | $2,500,000 | Not Selected | |
59 | MN 77 | Medium mill and overlay from 63rd St to Hwy 62 | $500,000 | Not Selected | |
58 | I-35E | Thin mill and overlay from Lone Oak Rd to Marie Ave | $15,300,000 | 2027 | |
57 | I-94 | Medium mill and overlay from 1.4 miles east of Hwy 101 to I-494 | $6,000,000 | Not Selected | |
57 | US 212 | Medium mill and overlay from 4 lane section to Chaska Creek | $2,700,000 | Not Selected | |
57 | MN 55 | Medium mill and overlay from Mendota Heights Rd to Hwy 149 | $800,000 | Not Selected | |
56 | MN 55 | Medium mill and overlay from Douglas Drive to Shaper Rd | $400,000 | Not Selected | |
56 | US 61 | Medium mill and overlay from Hwy 36 to I-694 | $1,700,000 | Not Selected | |
54 | I-494 | Medium mill and overlay from Pieper Rd to I-35 | $2,000,000 | Not Selected | |
54 | US 61 | Medium mill and overlay from entrance ramp from EB I-694 to WB I-694 entrance ramp | $300,000 | Not Selected | |
53 | US 12 | Reconstruction from Wayzata Blvd to Hennepin County Road 101 Bridge | $21,000,000 | 2025 | |
53 | MN 62 | Unbonded overlay from 28th Ave S to 43rd Ave S | $9,000,000 | 2026 | |
53 | MN 41 | Medium mill and overlay from Hwy 5 to Hwy 7 | $600,000 | Not Selected | |
52 | I-35W | Minor overlay from Sunset Ave to I-35E | $2,300,000 | 2026 | |
50 | I-494 | Medium mill and overlay from Robert St to I-35E | $2,500,000 | Not Selected | |
48 | US 52 | Thin mill and overlay from Hwy 55 to I-494 | $10,000,000 | 2028 | |
47 | MN 55 | Medium mill and overlay from Fernbrook to General Mills Blvd | $4,500,000 | Not Selected | |
46 | I-35W | Unbonded overlay from I35E/W to South of Cliff Rd | $23,800,000 | 2025 | |
44 | US 52 | Unbonded overlay from Clayton to Inver Grove Trail | $31,400,000 | 2028 | |
43 | MN 65 | Minor overlay from 217th Ave to Anoka/Isanti County line | $5,100,000 | 2029 | |
43 | US 169 | Medium mill and overlay from Scott County Road 15 to Shakopee western City limits | $3,100,000 | Not Selected | |
42 | I-35E | Reconstruction from Marie to Railroad bridge | $2,700,000 | 2027 | |
37 | US 169 | Major rehabilitation from Shakopee bypass to Western Shakopee City Limits. | $200,000 | 2024 | |
36 | US 52 | Major rehabilitation from Plato Blvd to South end of Lafayette Bridge | $200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
35 | MN 100 | Medium mill and overlay from .6 miles south of I694 to I694 | $300,000 | Not Selected | |
35 | I-35 | Medium mill and overlay from Hwy 95 to Chisago County Road 9 | $4,900,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
34 | US 61 | Thin mill and overlay from Hwy 316 to 3rd St crossing | $3,900,000 | 2026 | |
33 | MN 65 | Medium mill and overlay from 26th St to 10th St | $1,300,000 | Not Selected | |
33 | US 169 | Medium mill and overlay from Mississippi River Bridge to Hayden Lake Rd | $900,000 | Not Selected | |
33 | US 61 | Thin mill and overlay from 3rd St crossing to Hwy10 | $4,400,000 | 2029 | Combined with another segment with a high score of 65 |
33 | MN 62 | Medium mill and overlay from Portland Ave to 28th Ave S | $6,400,000 | 2026 | |
33 | MN 280 | Unbonded overlay from Como to I35W | $17,300,000 | 2028 | |
32 | MN 55 | Medium mill and overlay from General Mills Blvd to Hwy 100 | $1,000,000 | Not Selected | |
32 | MN 55 | Medium mill and overlay from 32nd St to 46th St | $2,100,000 | Not Selected | |
32 | MN 100 | Reclaim and overlay from Hennepin County Road 152 to I-694 | $11,200,000 | 2026 | |
31 | MN 7 | Minor overlay from Kings Dr to I-494 | $800,000 | 2030 | |
31 | US 12 | Thin mill and overlay from Independence to Hennepin County Road 29 | $3,900,000 | 2029 | |
30 | MN 77 | Unbonded overlay from 138th St to Hwy 13 | $42,900,000 | 2026 | Combined with another segment with a high score of 64 |
29 | MN 55 | Medium mill and overlay from General Mills Blvd to Douglas Dr | $800,000 | Not Selected | |
28 | US 10 | Medium mill and overlay from I35W to north of I-494/I694 | $1,000,000 | Not Selected | |
28 | I-35W | Medium mill and overlay from 42nd st to Washington | $8,000,000 | 2027 | |
26 | MN 101 | Medium mill and overlay from Hennepin County Road 14 to Kiowa Trail | $1,100,000 | Not Selected | |
26 | MN 41 | Medium mill and overlay from Minnesota River to Carver County Road 61 | $500,000 | Not Selected | |
25 | MN 101 | Medium mill and overlay from Kiowa Trail to Lyman Blvd | $200,000 | Not Selected | |
25 | US 61 | Medium mill and overlay from 25ft north of Reference point 155 to .1 miles north of 170th St | $100,000 | Not Selected | |
21 | US 61 | Medium mill and overlay from 267th St to I35W | $200,000 | Not Selected | |
20 | US 169 | Thin mill and overlay from Minnesota River to Anderson Lake Rd | $10,700,000 | 2028 | |
16 | MN 100 | Major major rehabilitation from 36th St to Cedar Lake Ramp | $200,000 | Not Selected | |
15 | MN 7 | Major rehabilitation from Hennepin County Road 101 to I-494 | $1,800,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |