Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2023

Score Route Description High Level Cost Estimate for Planning Purposes Year Planned (FY) Comments
96 MN100 Resurface road, repair 12 bridges, curb and gutter repair, access removal, ramp realignment and removal of bridge 27042 on Hwy 100 from under pedestrian bridge/exit Cedar Lake Rd in St Louis Park to I-694 in Brooklyn Center    $49,440,000   2027, Future   Poor pavement conditions; preventive maintenance. 
91 US169 Medium mill and overlay from MN55 to 77th Ave 7800000 Not Selected  Program limited by available funding.
91 US52 Medium mill and overlay from I-494 to Lafayette bridge 5100000 Not Selected  Program limited by available funding.
89 US212 Reconstruct road from I-494 to Hwy 62    $21,615,000   2033 Poor pavement conditions.
89 US212 Hwy 212 from County Road 4 to I-494 resurfacing project.   $24,267,842   2033  
85 US169 Resurface Hwy 169 from CSAH 15 to Ferry Bridges   $27,588,542   2028 Poor pavement conditions. 
84 US10 Resurface Hwy 10 from US169/MN47 to Creek Medows Bridge    $15,000,000   2032 Projected poor pavement conditions.
83 US169 Medium mill and overlay from MN 62 to MN55 $6,300,000 Not Selected  Program limited by available funding.
82 MN55 Repair pavement and bridge culverts 6732 and 6745, traffic management system and add turn lane on Hwy 55 (Olson Memorial Hwy) from Old Rockford Rd in Plymouth to just east General Mills Blvd in Golden Valley    $19,080,000   2024   Poor pavement conditions. 
82 MN55 Thick mill and overlay from Fernbrook to General Mills Blvd $10,200,000 Not Selected  Poor pavement conditions.
81 US169 Resurface road from 77th Ave N to 101st Ave N 4400000 Not Selected  Poor pavement conditions.
80 MN62 Resurface road from Penn Ave to Portland Ave $11,000,000 Not Selected  Repair early distresses.
80 US12 Resurface US 12 from the Wright/Hennepin County line to County Road 29    $9,602,500   2028.0000 Poor pavement conditions.
80 US52 Medium mill and overlay from MN65 to University Ave 1600000 Not selected Program limited by available funding.
80 US52 Resurface US 52 from Clayton to south of Inver Grove Trail; replace 2 and resurface 2 US 52 bridges over the UP Railroad, and replace the Hwy 55 bridge over US 52.   $36,210,000   2032 Poor pavement conditions.
79 US10 Thin mill and overlay from MN65 to I35W 9600000 Not Selected Poor pavement conditions; bad longitudinal joints.
78 US10 Medium mill and overlay from US61 to .1 miles east of US61 $100,000 Not selected Program limited by available funding. Short piece of 4 lane east of USTH 61. Recently received a UTBWC surface treatment.
78 US169 Medium mill and overlay and CPR from MN 21 to 173rd St W 12600000 Not Selected Poor pavement conditions.
78 US169 Repair pavement on Hwy 169 (Johnson Memorial Hwy) from Hwy 21 (Broadway St N) to 0.54 mile west of CR 15 (Marystown Rd) in Shakopee and modify access on Hwy 169 (Johnson Memorial Hwy) from Hwy 21 (Broadway St N) to Bluff Dr in Shakopee    $9,921,775   2024   Poor pavement conditions. 
77 US8 Resurface road from W Wyoming Ave to Tern Ave    $24,490,000   2032 Poor pavement conditions.
76 MN100 Medium mill and overlay from I-494 to Cedar Lake Bridge 10900000 Not Selected  RQI does not reflect on the ground conditions
76 MN610 Medium mill and overlay from MN252 to Mississippi River Bridge  1000000 Not Selected  Program limited by available funding.
76 US10 Medium mill and overlay from Foley Blvd to MN56 $4,100,000 Not Selected  RQI does not reflect on the ground conditions
76 US169 Medium mill and overlay from 77th Ave to 93rd Ave in Osseo $5,600,000 Not Selected Poor pavement conditions.
76 US212 Repair and resurface road from Mcleod/Carver County line to MN 5   $4,100,000   2032  
76 US52 Medium mill and overlay from Lafayette bridge to I-94 200000 Not Selected  Program limited by available funding.
74 MN25 Medium mill and overlay from MN5 to MN7 3900000 Not Selected  Program limited by available funding.
74 MN62 Medium mill and overlay from Tracy ave bridge to Penn Ave Bridge $3,200,000 Not Selected  Program limited by available funding.
74 US10 Resurface road, drainage on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka and intersection improvements on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka    $10,422,000   2027   Poor pavement conditions.
73 MN62 Medium mill and overlay from 43rd Ave to Mendota Bridge $1,600,000 Not Selected  Program limited by available funding.
73 US10 Medium mill and overlay from Cleveland RT/Jarvis LT to Fairoak Ave $14,800,000 Not Selected  Poor pavement conditions.
73 US10 Medium mill and overlay from I-35W to I694 $3,000,000 Not selected RQI does not match on the ground conditions
73 US52 Medium mill and overlay from Dakota County Road 42 to Clayton Ave 800000 Not Selected  Program limited by available funding.
72 MN280 Repair pavement, guardrail, rehab 13 bridges on Hwy 280 from junction with I-94 in St Paul to junction with I-35W in Roseville and close median on Hwy 280 at Broadway in Lauderdale and install signals at Kosata Ave and ramps with Energy Park Dr in St Paul    $32,476,000   2026, 2027   Poor pavement conditions; coordinate with bridge work. 
72 US169 Medium mill and overlay from Anderson Lakes Pkwy to Valley View Rd $1,500,000 Not Selected  Program limited by available funding.
72 US169 Medium mill and overlay from Catrerbury rd to Valley View Rd $8,600,000 Not Selected  Program limited by available funding.
71 MN25 Medium mill and overlay from Scott County line to MN5 $7,100,000 Not selected RQI does not match on the ground conditions
71 US10 Medium mill and overlay from east of 114th Ave NW to east Foley Blvd $2,200,000 Not Selected  RQI does not reflect on the ground conditions
70 MN101 Resurface road from Hwy 5 (W 78th St) to CSAH 62/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie    $1,887,000   2024   Poor pavement conditions. 
70 US12 Medium mill and overlay from County Road 90 to eastern Independence City limits $400,000 Not Selected  Program limited by available funding.
70 US52 US 52 from Inver Grove Trail to Hwy 55 resurfacing and Hwy 55 bridge over US 52 resurfacing.   $5,010,000   2032  
69 MN252 Medium mill and overlay from 85th to MN610 $1,100,000 Not Selected  Program limited by available funding.
69 MN316 Medium mill and overlay from Southern to northern limits $7,600,000 Not selected Poor pavement conditions.
69 MN316 Resurface pavement on Hwy 316 (Red Wing Blvd) from south jct Hwy 61 to Tuttle in Hastings and construct turn lanes at various locations on Hwy 316 (Red Wing Blvd) in Ravenna Township   $6,907,000   2024   Poor pavement conditions. 
69 MN62 Medium mill and overlay from I-35E to US52 3500000 Not selected Program limited by available funding.
69 US212 Medium mill and overlay from MN5 to Tacoma Ave 3500000 Not Selected  Program limited by available funding.
69 US52 Medium mill and overlay from Goodhue/Dakota County Line to County Road 86 2300000 Not Selected  Program limited by available funding.
68 MN101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
68 MN252 Hwy 252 from I-94 to 85th Street, resurfacing project.   $8,500,000   2033 Poor pavement conditions. Coordination with 252 CoC project.
68 US169 Medium mill and overlay from Elm creek Blvd to Mississippi River Bridge $500,000 Not Selected  Program limited by available funding.
68 US212 Medium mill and overlay from 2.2 miles east of MN284 to 4 lane section 2200000 Not Selected  Program limited by available funding.
67 MN41 Medium mill and overlay from US169 to Pioneer Trail 1200000 Not Selected  Program limited by available funding.
67 US212 Repair road from Highway 41 to County Rd. 4    $18,104,167   2032 Preventive maintenance.
66 MN36 Resurface pavement on Hwy 36 from Jct I-35W in Roseville to just east Edgerton in Maplewood/Little Canada and extend auxiliary lane, guardrail replacement, ADA improvements and reconstruct ramp at I-35W SB/Cleveland Ave to Hwy 36 EB    $13,814,000   2024   Poor pavement conditions; maintenance liability. 
66 MN610 Repair road from US 169 to Mississippi River $20,000,000 Not Selected  Projected poor pavement conditions.
66 US212 Meduim mill and overlay from MN5 to .4 miles east of MN5 400000 Not Selected  Program limited by available funding.
65 MN55 Resurface roadway, sidewalk ADA and signal replacement on MN 55 west of BNSF bridge to I-94. Resurface MN 55 bridges over I-94 and Replace MN 55 over Bassett Creek.   $11,045,888   2028 Poor pavement conditions. Frontage road and ADA needs.
65 MN62 Medium mill and overlay from I-494 to Clearwater Dr 300000 Not Selected  Program limited by available funding.
65 US10 Resurface road from US61 to the West end of the St Croix bridge    $5,817,647   2033 Projected poor pavement conditions. 2020 RSL 10 years.
65 US169 Medium mill and overlay from MN282 to MN21 $1,400,000 Not Selected  Program limited by available funding.
65 US8 Medium mill and overlay from Tern Ave roundabout to Minnesota/Wisconsin State line 1900000 Not Selected  Program limited by available funding.
64 MN55 Resurface Road from Highway 52 to US 61 19500000 Not Selected  Poor pavement conditions.
64 MN610 Repair and resurface MN 610 from Mississippi River to Coon Rapids Blvd   $15,000,000   2033  
64 US12 Medium mill and overlay from Hennepin County Road 29 to Wayzata Blvd exit 3000000 Not Selected  Program limited by available funding.
63 MN55 Hwy 55 from County Road 63 to US 52 resurfacing project.   $7,000,000   2032.0000 Poor pavement conditions.
63 MN62 Medium mill and overlay from Portland Ave to 28th ave $1,800,000 Not Selected  Program limited by available funding.
63 US212 Medium mill and overlay from Tacoma Ave to Carver County Road 36 2700000 Not Selected  Program limited by available funding.
62 MN41 Medium mill and overlay from MN5 to MN7 $1,100,000 Not selected Program limited by available funding.
62 MN55 Medium mill and overlay and ADA work from MN100 to Railroad overpass 3400000 Not Selected  Poor pavement conditions.
62 MN55 Medium mill and overlay from Pine Bend Trail to Hastings CL 3500000 Not Selected  Program limited by available funding.
62 MN55 Resurface pavement, overlay bridge 27237, construct trail, ADA and turn lane reconstruction at Dahlberg Drive on Hwy 55 (Olson Memorial Pkwy) from 0.2 miles west of Hwy 100 in Golden Valley to west end of bridge over BNSF tracks in Mpls    $6,407,000   2025 Poor pavement conditions. 
62 MN62 Medium mill and overlay from Clearwater to Tracy Ave $3,300,000 Not Selected  Program limited by available funding.
61 MN62 Medium mill and overlay from Portland Ave bridge to .154 miles east of Portland bridge $200,000 Not Selected  Program limited by available funding.
61 US12 Medium mill and overlay from Railroad bridge to 7th St $300,000 Not Selected  Program limited by available funding.
60 US212 Medium mill and overlay from Chaska Creek to MN41 1700000 Not Selected  Program limited by available funding.
59 MN25 Resurface road from US 212 to MN 5   $2,750,000   2032 Projected poor pavement conditions. 2020 RSL 11 years.
59 MN252 Medium mill and overlay from I-94 WB in Brooklyn Center to .4 miles north of I-94 500000 Not Selected  Program limited by available funding.
59 MN36 Medium mill and overlay from Washington Ave to MN95  $1,800,000 Not Selected  Program limited by available funding.
59 US10 Medium mill and overlay from Fairoak Ave to US169/MN47 $900,000 Not Selected  Program limited by available funding.
59 US169 Medium mill and overlay from .1 miles north of Ash St to 1.2 miles north of Ash St $1,300,000 Not Selected  Program limited by available funding.
58 US169 Medium mill and overlay from 4.5 miles north of MN19 to 5.7 miles north of MN19 $1,100,000 Not Selected  Program limited by available funding.
58 US169 Medium mill and overlay from Elm Creek Blvd to US10 $1,400,000 Not Selected  Program limited by available funding.
58 US212 Medium mill and overlay from 4 lane section to Chaska Creek 2700000 Not Selected  Program limited by available funding.
57 MN62 Resurface Hwy 62 from Lexington Ave to Northbound 35E Ramp.   $3,044,445   2028 Poor pavement conditions.
57 MN62 Repair pavement on Hwy 62 between Hwy 13 and Lexington Ave in Mendota Heights   $2,650,826   2024   Poor pavement conditions. 
57 US169 Medium mill and overlay from LeSueur/Scott County line to MN19 $400,000 Not Selected  Program limited by available funding.
56 MN610 Medium mill and overlay from I-94 to Elm Creek Blvd $2,400,000 Not Selected  Program limited by available funding.
55 MN121 Medium mill and overlay from I35W to Pedestrian bridge 300000 Not Selected  Program limited by available funding.
55 MN62 Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater $400,000 Not Selected  Program limited by available funding.
54 US10 Resurface road from MN 65 to the north junction I-35W - Future Project $7,500,000 Not selected Poor pavement conditions; bad longitudinal joints.
54 US212 Medium mill and overlay from .1 miles south of MN62 to MN62 1000000 Not Selected  Program limited by available funding.
53 MN62 Reconstruct road, curb and gutter, guardrail, drainage, sidewalk, railing replacement and repair bridge #27521 on Hwy 62 from 28th Ave to Hwy 55 in Mpls    $22,904,000   2027, Future   Poor pavement conditions. 
46 MN101 Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego    $12,674,000   2027 Poor pavement conditions. 
46 MN55 Resurface road from the Wright-Hennepin county line to Fernbrook   $21,948,000   2029 Poor pavement conditions.
45 US169 Resurface road from the north end of Bloomington Ferry bridge to Anderson Lakes bridge    $8,470,000   2033 Poor pavement conditions. 
40 US8 Expand from two-lane undivided to four-lane divided roadway, signals, trail on Hwy 8 from Chisago County line in Wyoming to Karmel Ave/Wyoming Ave in Chisago City and reconstruct Hwy 8 from I-35 to Chisago County line in Forest Lake    $80,000,000   2024    
40 US8 Resurface, drainage repair, construct pond from jct I-35 in Forest Lake to 0.1 miles west of Wyoming Ave in Chisago City, and construct left turn lane on Hwy 8 (Lake Blvd) at Hazel Ave and close 250th St at MN 8 in Wyoming Township    $14,275,000   2025   Coordination with County safety improvements. Poor pavement conditions. 
36 US12 Resurface road, lighting, drainage improvements, ADA, pier protection on bridges 27129 and 27130 on Hwy 12 (Wayzata Blvd) from 0.5 miles west Shoreline Dr in Orono to 0.5 miles east I-494 in Minnetonka    $50,081,000   2026, 2027   Poor pavement conditions.
36 US169 Medium mill and overlay from Valley View Rd to US 212/MN62 1900000 Not Selected  Program limited by available funding.
35 MN55 Medium mill and overlay from General Mills Blvd to Schaper Rd $2,100,000 Not Selected  Program limited by available funding.
33 MN25 Resurface road from US 169 to Minnesota River bridge    $2,375,000   2032 Poor pavement conditions. 
31 MN41 Repair road from Count Hwy 61 to Hundertmark Rd    $12,980,000   2030 Poor pavement conditions.
29 MN610 Medium mill and overlay from Elm Creek Blvd to US 169 2700000 Not Selected  Program limited by available funding.
29 US10 Medium mill and overlay from MN101 to Cleveland Ave $3,400,000 Not Selected  Program limited by available funding.
21 US169 Medium mill and overlay from MN19 to MN25 4500000 Not Selected  Program limited by available funding.
18 US169 Major rehabilitation from Scott County Road 16 to Canterbury Rd 13100000 Not Selected Poor pavement conditions.
18 US169 Medium mill and overlay from 1.2 miles north of MN282 to .27 miles north of MN282 $5,900,000 Not Selected  Program limited by available funding.
18 US169 Medium mill and overlay from 93rd Ave to Elm Creek Blvd 4000000 Not Selected  Program limited by available funding.
15 US169 Medium mill and overlay from MN25 to Ash St $1,800,000 Not Selected  Program limited by available funding.