National Highway System pavement projects
MnDOT Metro District
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- Metro District project selection
- Metro District Non-National Highway System pavement projects
- Metro District Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated October 2023
Score | Route | Description | High Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
96 | MN100 | Resurface road, repair 12 bridges, curb and gutter repair, access removal, ramp realignment and removal of bridge 27042 on Hwy 100 from under pedestrian bridge/exit Cedar Lake Rd in St Louis Park to I-694 in Brooklyn Center | $49,440,000 | 2027, Future | Poor pavement conditions; preventive maintenance. |
91 | US169 | Medium mill and overlay from MN55 to 77th Ave | 7800000 | Not Selected | Program limited by available funding. |
91 | US52 | Medium mill and overlay from I-494 to Lafayette bridge | 5100000 | Not Selected | Program limited by available funding. |
89 | US212 | Reconstruct road from I-494 to Hwy 62 | $21,615,000 | 2033 | Poor pavement conditions. |
89 | US212 | Hwy 212 from County Road 4 to I-494 resurfacing project. | $24,267,842 | 2033 | |
85 | US169 | Resurface Hwy 169 from CSAH 15 to Ferry Bridges | $27,588,542 | 2028 | Poor pavement conditions. |
84 | US10 | Resurface Hwy 10 from US169/MN47 to Creek Medows Bridge | $15,000,000 | 2032 | Projected poor pavement conditions. |
83 | US169 | Medium mill and overlay from MN 62 to MN55 | $6,300,000 | Not Selected | Program limited by available funding. |
82 | MN55 | Repair pavement and bridge culverts 6732 and 6745, traffic management system and add turn lane on Hwy 55 (Olson Memorial Hwy) from Old Rockford Rd in Plymouth to just east General Mills Blvd in Golden Valley | $19,080,000 | 2024 | Poor pavement conditions. |
82 | MN55 | Thick mill and overlay from Fernbrook to General Mills Blvd | $10,200,000 | Not Selected | Poor pavement conditions. |
81 | US169 | Resurface road from 77th Ave N to 101st Ave N | 4400000 | Not Selected | Poor pavement conditions. |
80 | MN62 | Resurface road from Penn Ave to Portland Ave | $11,000,000 | Not Selected | Repair early distresses. |
80 | US12 | Resurface US 12 from the Wright/Hennepin County line to County Road 29 | $9,602,500 | 2028.0000 | Poor pavement conditions. |
80 | US52 | Medium mill and overlay from MN65 to University Ave | 1600000 | Not selected | Program limited by available funding. |
80 | US52 | Resurface US 52 from Clayton to south of Inver Grove Trail; replace 2 and resurface 2 US 52 bridges over the UP Railroad, and replace the Hwy 55 bridge over US 52. | $36,210,000 | 2032 | Poor pavement conditions. |
79 | US10 | Thin mill and overlay from MN65 to I35W | 9600000 | Not Selected | Poor pavement conditions; bad longitudinal joints. |
78 | US10 | Medium mill and overlay from US61 to .1 miles east of US61 | $100,000 | Not selected | Program limited by available funding. Short piece of 4 lane east of USTH 61. Recently received a UTBWC surface treatment. |
78 | US169 | Medium mill and overlay and CPR from MN 21 to 173rd St W | 12600000 | Not Selected | Poor pavement conditions. |
78 | US169 | Repair pavement on Hwy 169 (Johnson Memorial Hwy) from Hwy 21 (Broadway St N) to 0.54 mile west of CR 15 (Marystown Rd) in Shakopee and modify access on Hwy 169 (Johnson Memorial Hwy) from Hwy 21 (Broadway St N) to Bluff Dr in Shakopee | $9,921,775 | 2024 | Poor pavement conditions. |
77 | US8 | Resurface road from W Wyoming Ave to Tern Ave | $24,490,000 | 2032 | Poor pavement conditions. |
76 | MN100 | Medium mill and overlay from I-494 to Cedar Lake Bridge | 10900000 | Not Selected | RQI does not reflect on the ground conditions |
76 | MN610 | Medium mill and overlay from MN252 to Mississippi River Bridge | 1000000 | Not Selected | Program limited by available funding. |
76 | US10 | Medium mill and overlay from Foley Blvd to MN56 | $4,100,000 | Not Selected | RQI does not reflect on the ground conditions |
76 | US169 | Medium mill and overlay from 77th Ave to 93rd Ave in Osseo | $5,600,000 | Not Selected | Poor pavement conditions. |
76 | US212 | Repair and resurface road from Mcleod/Carver County line to MN 5 | $4,100,000 | 2032 | |
76 | US52 | Medium mill and overlay from Lafayette bridge to I-94 | 200000 | Not Selected | Program limited by available funding. |
74 | MN25 | Medium mill and overlay from MN5 to MN7 | 3900000 | Not Selected | Program limited by available funding. |
74 | MN62 | Medium mill and overlay from Tracy ave bridge to Penn Ave Bridge | $3,200,000 | Not Selected | Program limited by available funding. |
74 | US10 | Resurface road, drainage on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka and intersection improvements on Hwy 10 from Cleveland/Jarvis St in Elk River to 0.5 miles W to Ramsey Blvd in Anoka | $10,422,000 | 2027 | Poor pavement conditions. |
73 | MN62 | Medium mill and overlay from 43rd Ave to Mendota Bridge | $1,600,000 | Not Selected | Program limited by available funding. |
73 | US10 | Medium mill and overlay from Cleveland RT/Jarvis LT to Fairoak Ave | $14,800,000 | Not Selected | Poor pavement conditions. |
73 | US10 | Medium mill and overlay from I-35W to I694 | $3,000,000 | Not selected | RQI does not match on the ground conditions |
73 | US52 | Medium mill and overlay from Dakota County Road 42 to Clayton Ave | 800000 | Not Selected | Program limited by available funding. |
72 | MN280 | Repair pavement, guardrail, rehab 13 bridges on Hwy 280 from junction with I-94 in St Paul to junction with I-35W in Roseville and close median on Hwy 280 at Broadway in Lauderdale and install signals at Kosata Ave and ramps with Energy Park Dr in St Paul | $32,476,000 | 2026, 2027 | Poor pavement conditions; coordinate with bridge work. |
72 | US169 | Medium mill and overlay from Anderson Lakes Pkwy to Valley View Rd | $1,500,000 | Not Selected | Program limited by available funding. |
72 | US169 | Medium mill and overlay from Catrerbury rd to Valley View Rd | $8,600,000 | Not Selected | Program limited by available funding. |
71 | MN25 | Medium mill and overlay from Scott County line to MN5 | $7,100,000 | Not selected | RQI does not match on the ground conditions |
71 | US10 | Medium mill and overlay from east of 114th Ave NW to east Foley Blvd | $2,200,000 | Not Selected | RQI does not reflect on the ground conditions |
70 | MN101 | Resurface road from Hwy 5 (W 78th St) to CSAH 62/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie | $1,887,000 | 2024 | Poor pavement conditions. |
70 | US12 | Medium mill and overlay from County Road 90 to eastern Independence City limits | $400,000 | Not Selected | Program limited by available funding. |
70 | US52 | US 52 from Inver Grove Trail to Hwy 55 resurfacing and Hwy 55 bridge over US 52 resurfacing. | $5,010,000 | 2032 | |
69 | MN252 | Medium mill and overlay from 85th to MN610 | $1,100,000 | Not Selected | Program limited by available funding. |
69 | MN316 | Medium mill and overlay from Southern to northern limits | $7,600,000 | Not selected | Poor pavement conditions. |
69 | MN316 | Resurface pavement on Hwy 316 (Red Wing Blvd) from south jct Hwy 61 to Tuttle in Hastings and construct turn lanes at various locations on Hwy 316 (Red Wing Blvd) in Ravenna Township | $6,907,000 | 2024 | Poor pavement conditions. |
69 | MN62 | Medium mill and overlay from I-35E to US52 | 3500000 | Not selected | Program limited by available funding. |
69 | US212 | Medium mill and overlay from MN5 to Tacoma Ave | 3500000 | Not Selected | Program limited by available funding. |
69 | US52 | Medium mill and overlay from Goodhue/Dakota County Line to County Road 86 | 2300000 | Not Selected | Program limited by available funding. |
68 | MN101 | Medium mill and overlay from NB split with US169 to SB merge with US169 | $3,400,000 | Not Selected | Program limited by available funding. |
68 | MN252 | Hwy 252 from I-94 to 85th Street, resurfacing project. | $8,500,000 | 2033 | Poor pavement conditions. Coordination with 252 CoC project. |
68 | US169 | Medium mill and overlay from Elm creek Blvd to Mississippi River Bridge | $500,000 | Not Selected | Program limited by available funding. |
68 | US212 | Medium mill and overlay from 2.2 miles east of MN284 to 4 lane section | 2200000 | Not Selected | Program limited by available funding. |
67 | MN41 | Medium mill and overlay from US169 to Pioneer Trail | 1200000 | Not Selected | Program limited by available funding. |
67 | US212 | Repair road from Highway 41 to County Rd. 4 | $18,104,167 | 2032 | Preventive maintenance. |
66 | MN36 | Resurface pavement on Hwy 36 from Jct I-35W in Roseville to just east Edgerton in Maplewood/Little Canada and extend auxiliary lane, guardrail replacement, ADA improvements and reconstruct ramp at I-35W SB/Cleveland Ave to Hwy 36 EB | $13,814,000 | 2024 | Poor pavement conditions; maintenance liability. |
66 | MN610 | Repair road from US 169 to Mississippi River | $20,000,000 | Not Selected | Projected poor pavement conditions. |
66 | US212 | Meduim mill and overlay from MN5 to .4 miles east of MN5 | 400000 | Not Selected | Program limited by available funding. |
65 | MN55 | Resurface roadway, sidewalk ADA and signal replacement on MN 55 west of BNSF bridge to I-94. Resurface MN 55 bridges over I-94 and Replace MN 55 over Bassett Creek. | $11,045,888 | 2028 | Poor pavement conditions. Frontage road and ADA needs. |
65 | MN62 | Medium mill and overlay from I-494 to Clearwater Dr | 300000 | Not Selected | Program limited by available funding. |
65 | US10 | Resurface road from US61 to the West end of the St Croix bridge | $5,817,647 | 2033 | Projected poor pavement conditions. 2020 RSL 10 years. |
65 | US169 | Medium mill and overlay from MN282 to MN21 | $1,400,000 | Not Selected | Program limited by available funding. |
65 | US8 | Medium mill and overlay from Tern Ave roundabout to Minnesota/Wisconsin State line | 1900000 | Not Selected | Program limited by available funding. |
64 | MN55 | Resurface Road from Highway 52 to US 61 | 19500000 | Not Selected | Poor pavement conditions. |
64 | MN610 | Repair and resurface MN 610 from Mississippi River to Coon Rapids Blvd | $15,000,000 | 2033 | |
64 | US12 | Medium mill and overlay from Hennepin County Road 29 to Wayzata Blvd exit | 3000000 | Not Selected | Program limited by available funding. |
63 | MN55 | Hwy 55 from County Road 63 to US 52 resurfacing project. | $7,000,000 | 2032.0000 | Poor pavement conditions. |
63 | MN62 | Medium mill and overlay from Portland Ave to 28th ave | $1,800,000 | Not Selected | Program limited by available funding. |
63 | US212 | Medium mill and overlay from Tacoma Ave to Carver County Road 36 | 2700000 | Not Selected | Program limited by available funding. |
62 | MN41 | Medium mill and overlay from MN5 to MN7 | $1,100,000 | Not selected | Program limited by available funding. |
62 | MN55 | Medium mill and overlay and ADA work from MN100 to Railroad overpass | 3400000 | Not Selected | Poor pavement conditions. |
62 | MN55 | Medium mill and overlay from Pine Bend Trail to Hastings CL | 3500000 | Not Selected | Program limited by available funding. |
62 | MN55 | Resurface pavement, overlay bridge 27237, construct trail, ADA and turn lane reconstruction at Dahlberg Drive on Hwy 55 (Olson Memorial Pkwy) from 0.2 miles west of Hwy 100 in Golden Valley to west end of bridge over BNSF tracks in Mpls | $6,407,000 | 2025 | Poor pavement conditions. |
62 | MN62 | Medium mill and overlay from Clearwater to Tracy Ave | $3,300,000 | Not Selected | Program limited by available funding. |
61 | MN62 | Medium mill and overlay from Portland Ave bridge to .154 miles east of Portland bridge | $200,000 | Not Selected | Program limited by available funding. |
61 | US12 | Medium mill and overlay from Railroad bridge to 7th St | $300,000 | Not Selected | Program limited by available funding. |
60 | US212 | Medium mill and overlay from Chaska Creek to MN41 | 1700000 | Not Selected | Program limited by available funding. |
59 | MN25 | Resurface road from US 212 to MN 5 | $2,750,000 | 2032 | Projected poor pavement conditions. 2020 RSL 11 years. |
59 | MN252 | Medium mill and overlay from I-94 WB in Brooklyn Center to .4 miles north of I-94 | 500000 | Not Selected | Program limited by available funding. |
59 | MN36 | Medium mill and overlay from Washington Ave to MN95 | $1,800,000 | Not Selected | Program limited by available funding. |
59 | US10 | Medium mill and overlay from Fairoak Ave to US169/MN47 | $900,000 | Not Selected | Program limited by available funding. |
59 | US169 | Medium mill and overlay from .1 miles north of Ash St to 1.2 miles north of Ash St | $1,300,000 | Not Selected | Program limited by available funding. |
58 | US169 | Medium mill and overlay from 4.5 miles north of MN19 to 5.7 miles north of MN19 | $1,100,000 | Not Selected | Program limited by available funding. |
58 | US169 | Medium mill and overlay from Elm Creek Blvd to US10 | $1,400,000 | Not Selected | Program limited by available funding. |
58 | US212 | Medium mill and overlay from 4 lane section to Chaska Creek | 2700000 | Not Selected | Program limited by available funding. |
57 | MN62 | Resurface Hwy 62 from Lexington Ave to Northbound 35E Ramp. | $3,044,445 | 2028 | Poor pavement conditions. |
57 | MN62 | Repair pavement on Hwy 62 between Hwy 13 and Lexington Ave in Mendota Heights | $2,650,826 | 2024 | Poor pavement conditions. |
57 | US169 | Medium mill and overlay from LeSueur/Scott County line to MN19 | $400,000 | Not Selected | Program limited by available funding. |
56 | MN610 | Medium mill and overlay from I-94 to Elm Creek Blvd | $2,400,000 | Not Selected | Program limited by available funding. |
55 | MN121 | Medium mill and overlay from I35W to Pedestrian bridge | 300000 | Not Selected | Program limited by available funding. |
55 | MN62 | Medium mill and overlay from Clearwater Dr to .32 miles east of Clearwater | $400,000 | Not Selected | Program limited by available funding. |
54 | US10 | Resurface road from MN 65 to the north junction I-35W - Future Project | $7,500,000 | Not selected | Poor pavement conditions; bad longitudinal joints. |
54 | US212 | Medium mill and overlay from .1 miles south of MN62 to MN62 | 1000000 | Not Selected | Program limited by available funding. |
53 | MN62 | Reconstruct road, curb and gutter, guardrail, drainage, sidewalk, railing replacement and repair bridge #27521 on Hwy 62 from 28th Ave to Hwy 55 in Mpls | $22,904,000 | 2027, Future | Poor pavement conditions. |
46 | MN101 | Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego | $12,674,000 | 2027 | Poor pavement conditions. |
46 | MN55 | Resurface road from the Wright-Hennepin county line to Fernbrook | $21,948,000 | 2029 | Poor pavement conditions. |
45 | US169 | Resurface road from the north end of Bloomington Ferry bridge to Anderson Lakes bridge | $8,470,000 | 2033 | Poor pavement conditions. |
40 | US8 | Expand from two-lane undivided to four-lane divided roadway, signals, trail on Hwy 8 from Chisago County line in Wyoming to Karmel Ave/Wyoming Ave in Chisago City and reconstruct Hwy 8 from I-35 to Chisago County line in Forest Lake | $80,000,000 | 2024 | |
40 | US8 | Resurface, drainage repair, construct pond from jct I-35 in Forest Lake to 0.1 miles west of Wyoming Ave in Chisago City, and construct left turn lane on Hwy 8 (Lake Blvd) at Hazel Ave and close 250th St at MN 8 in Wyoming Township | $14,275,000 | 2025 | Coordination with County safety improvements. Poor pavement conditions. |
36 | US12 | Resurface road, lighting, drainage improvements, ADA, pier protection on bridges 27129 and 27130 on Hwy 12 (Wayzata Blvd) from 0.5 miles west Shoreline Dr in Orono to 0.5 miles east I-494 in Minnetonka | $50,081,000 | 2026, 2027 | Poor pavement conditions. |
36 | US169 | Medium mill and overlay from Valley View Rd to US 212/MN62 | 1900000 | Not Selected | Program limited by available funding. |
35 | MN55 | Medium mill and overlay from General Mills Blvd to Schaper Rd | $2,100,000 | Not Selected | Program limited by available funding. |
33 | MN25 | Resurface road from US 169 to Minnesota River bridge | $2,375,000 | 2032 | Poor pavement conditions. |
31 | MN41 | Repair road from Count Hwy 61 to Hundertmark Rd | $12,980,000 | 2030 | Poor pavement conditions. |
29 | MN610 | Medium mill and overlay from Elm Creek Blvd to US 169 | 2700000 | Not Selected | Program limited by available funding. |
29 | US10 | Medium mill and overlay from MN101 to Cleveland Ave | $3,400,000 | Not Selected | Program limited by available funding. |
21 | US169 | Medium mill and overlay from MN19 to MN25 | 4500000 | Not Selected | Program limited by available funding. |
18 | US169 | Major rehabilitation from Scott County Road 16 to Canterbury Rd | 13100000 | Not Selected | Poor pavement conditions. |
18 | US169 | Medium mill and overlay from 1.2 miles north of MN282 to .27 miles north of MN282 | $5,900,000 | Not Selected | Program limited by available funding. |
18 | US169 | Medium mill and overlay from 93rd Ave to Elm Creek Blvd | 4000000 | Not Selected | Program limited by available funding. |
15 | US169 | Medium mill and overlay from MN25 to Ash St | $1,800,000 | Not Selected | Program limited by available funding. |