Scoring criteria for non-national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on the potential to transfer jurisdiction of the road to a city or county, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2022

Score Route Description High level construction cost estimate for planning purposes Year Planned (FY) Comments
15 MN56 Resurface road from the Goodhue/Dakota County line to MN 50/US 52 $5,180,000 2031 Projected poor pavement conditions. 2020 RSL 4 to 11 years. 
18 MN77 Resurface Hwy 77 (Cedar) from 138th St (CR 23) in Bloomington to the Dakota-Hennepin County line in Apple Valley $35,838,000 2026, Future Poor pavement conditions. 
19 MN47 Resurface road and ADA improvements on Hwy 47 (University Ave) from Cree St to Anoka/Isanti County line in St Francis $2,662,000 2025 Safety. Poor pavement conditions. 
20 MN244 Rebuild road from County Rd. 12 to MN 96 $4,000,000 2031  
21 MN20 Resurface road from MN 19 to MN 50 $5,000,000 2032 Poor pavement conditions. 2020 RSL 2 to 10 years.
24 MN5 Resurface road from County Rd 11 to MN 41 $5,000,000 2032 Projected poor pavement conditions.
25 MN51 Resurface road from W 7th to Dayton Ave $6,100,000 2030 Poor pavement conditions.
27 MN13 Medium mill and overlay from Connelly Pkwy to old MN101 $2,000,000 Not selected Program limited by available funding.
27 MN13 Medium mill and overlay from MN13 to MN149 $200,000 Not selected Program limited by available funding.
29 MN65 Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 $3,100,000 Not Selected  Program limited by available funding.
30 MN47 Medium mill and overlay from US10 to .4 miles NW of US10 $300,000 Not selected Program limited by available funding.
31 MN7 Repair road from W end of 494 bridge. to I-494 $500,000 2030 Poor pavement conditions.
32 MN47 Resurface road from 40th Ave to US 10 $10,500,000 2030 Poor pavement conditions.
33 MN47 Resurface MN 47 from 142nd Ave to 153rd Ave (Alpine Dr) $1,600,000 2028 Projected poor pavement conditions. Project has previously been deferred. 2020 RSL 5 years.
33 MN47 Resurface road from 153rd Ave (Alpine Dr) to Cree St NW/St. Francis $15,000,000 2029 Projected poor pavement conditions.
35 MN97 Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake $10,849,000 2025 Geometrics. Poor pavement conditions. Ped/bike trail needs. 
39 MN21 Resurface road from Mill St to US169 $1,500,000 2031 Poor pavement conditions.
39 MN97 Minor rehabilitation within roundabout at US61 $100,000 Not selected Newer concrete roundabouts.
40 MN13 Medium mill and overlay from Washburn Ave to I-35 $1,400,000 Not Selected  Program limited by available funding.
43 MN13 Reconstruct road from Eagle Creek Ave to County Rd 42 $3,500,000 2030 Projected poor pavement conditions.
43 MN5 Medium mill and overlay from I-494 to Hennepin/Ramsey County line $3,900,000 Not Selected  Program limited by available funding.
43 MN65 Repair road from 217th Ave to Anoka-Isanti County line $18,000,000 2029 Repair early distresses.
44 MN95 Medium mill and overlay from I-94 to .5 miles S of I-94 $500,000 Not selected Program limited by available funding.
46 MN101 Repair and resurface road from I-94 to County Rd 38 $8,800,000 2026 Poor pavement conditions. 
47 MN19 Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project $2,700,000 2036  
47 MN95 Thin mill and overlay from I-94 to Mulberry St $18,000,000 Not selected Projected poor pavement conditions. 2020 RSL is 4 to 6 years.
55 MN121 Medium mill and overlay from I35W to Pedestrian bridge $300,000 Not Selected  Program limited by available funding.
55 MN5 Medium mill and overlay from Carver County Road 10 to Oak Ave $200,000 Not selected Program limited by available funding.
57 MN149 Medium mill and overlay from I-494 to Mendota Heights Rd $600,000 Not selected Program limited by available funding.
57 MN50 Medium mill and overlay from MN3 to US52 $4,300,000 Not selected Program limited by available funding.
58 MN149 Medium mill and overlay from Mendota Heights Rd to MN5/7th St $2,500,000 Not selected Program limited by available funding.
59 MN5 Medium mill and overlay from MN25 to Carver  County Road 10 $1,900,000 Not selected Program limited by available funding.
60 MN5 Repair road from MN 41 to Eden Prairie Rd $18,300,000 2032 Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues.
60 MN77 Medium mill and overlay from Minnesota River bridge to I-494 $3,100,000 Not Selected  Program limited by available funding.
61 MN101 Minor concrete pavement repair, from CR 38 to US 10 $3,500,000 2027 Poor pavement conditions. 
61 MN47 Medium mill and overlay from US 10 to Industry Ave  $700,000 Not selected Program limited by available funding.
61 MN95 Medium mill and overlay from Valley Creek to Bailey Rd $1,200,000 Not selected Program limited by available funding.
62 MN243 Medium mill and overlay from MN95 to St Croix River $700,000 Not selected Program limited by available funding.
62 MN95 Medium mill and overlay from I-94 to Valley Creek $700,000 Not selected Program limited by available funding.
64 MN149 Medium mill and overlay from Albano Tr to MN55 $2,600,000 Not selected Program limited by available funding.
64 MN95 Medium mill and overlay from Bailey Rd to US61 $4,100,000 Not selected Program limited by available funding.
64 MN95 Medium mill and overlay from Sunrise River to Taylors Falls $6,600,000 Not selected Program limited by available funding.
65 MN13 Medium mill and overlay from Dakota County Line to Washburn Ave $700,000 Not Selected  Program limited by available funding.
65 MN5 Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 $200,000 Not selected Program limited by available funding.
66 MN13 Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave $700,000 Not Selected  Program limited by available funding.
66 MN7 Medium mill and overlay from I-494 to Shady Oak Road $1,000,000 Not Selected  Program limited by available funding.
66 MN95 Medium mill and overlay from St Croxi Trail to Point Rd $1,000,000 Not selected Program limited by available funding.
67 MN5 Resurface road from St. Clair Ave to bridge over I94 $14,439,000 2028 Poor pavement conditions.
67 MN7 Medium mill and overlay from Railroad bridge to MN100 $900,000 Not Selected  Program limited by available funding.
68 MN101 Medium mill and overlay from NB split with US169 to SB merge with US169  $3,400,000 Not Selected  Program limited by available funding.
68 MN13 Medium mill and overlay from MN282 to Scott County Road 21 roundabout $2,000,000 Not selected Program limited by available funding.
68 MN65 Medium mill and overlay from 26th St to 10th ST $1,300,000 Not Selected  Program limited by available funding.
68 MN95 Medium mill and overlay from Mulberry to St Saint Croix Trail $500,000 Not selected Program limited by available funding.
69 MN149 Medium mill and overlay from MN3 to Albano Tr $200,000 Not selected Program limited by available funding.
69 MN3 Resurface road from 145th St to MN 149 $4,500,000 2031  
69 MN5 Medium mill and overlay from Birch St to Scandia Rd $1,100,000 Not selected Program limited by available funding.
70 MN101 Resurface road from Hwy 5 (W 78th St) to Hwy 10/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie $1,799,000 2024 Poor pavement conditions. 
70 MN13 Repair concrete from I-494 to MN 55 $5,000,000 2031  
70 MN51 Resurface road and ADA improvements on Hwy 51 (Snelling Ave) from Grand Ave to St Clair Ave in St Paul $1,760,000 2024  
70 MN65 Resurface road from 37th Ave NE Ave to 53rd NE $5,200,000 2032 Projected poor pavement conditions.
71 MN13 Medium mill and overlay from Yankee Doodle Rd to I494 $900,000 Not selected RQI does not match on the ground conditions
71 MN3 Medium mill and overlay from MN149 to Bridge 19045 $1,300,000 Not selected Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life.
72 MN121 Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from 0.5 miles west of I-35W pedestrian bridge over Lyndale Ave to W 58th St in Mpls $1,540,000 2025  
72 MN13 Medium mill and overlay from Dakota to Washburn ave $1,600,000 Not Selected  Program limited by available funding.
72 MN3 Reconstruct the road from Amana Trail to MN 62 $8,800,000 2031  
72 MN47 Resurface, drainage, sidewalks and ADA work on Hwy 47 from Hwy 65 to just south of 27th northeast  Ave in Mpls $3,400,000 2027  
72 MN7 Resurface road from TH 25 to Carver County Line $6,500,000 2030 Projected poor pavement conditions.
72 MN95 Medium mill and overlay from Point Rd to I-94 $2,800,000 Not selected RQI does not match on the ground conditions
73 MN13 Medium mill and overlay legs to and from Scott County Road 21 roundabout $300,000 Not selected Very new pavement either side of new roundabout.
73 MN21 Medium mill and overlay from 7th St to Sawmill Rd $4,300,000 Not selected RQI does not match on the ground conditions
73 MN3 Medium mill and overlay from Bridge 19045 to Mendota Rd $500,000 Not selected RQI does not match on the ground conditions
73 MN7 Medium mill and overlay from Texas Ave to Railroad Bridge  $700,000 Not Selected  RQI does not reflect on the ground conditions
74 MN13 Medium mill and overlay from MN13 to Dakota Ave $700,000 Not Selected  Program limited by available funding.
74 MN284 Reconstruct road from US 212 to 122nd St $11,000,000 2031  
74 MN51 Medium mill and overlay from Grey Fox Rd to I694 $300,000 Not selected Recently repaired in 2021
76 MN21 Medium mill and overlay from Sawmill Rd to Mill St $300,000 Not selected RQI does not match on the ground conditions
76 MN50 Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 in Douglas Township $6,568,000 2026 Poor pavement conditions. 
77 MN120 Resurface road from Ridge Dr to 4th St. $1,200,000 2031 Projected poor pavement conditions.
77 MN21 Medium mill and overlay from MN19 to Scott County Road 37 $300,000 Not selected Program limited by available funding. Short urban section.
77 MN3 Resurface road from Rice County line to MN 50 $6,500,000 2028 Poor pavement conditions. 
78 MN13 Medium mill and overlay from  Scott County Road 42 to Connelly Pkwy $700,000 Not selected RQI does not match on the ground conditions
78 MN3 Medium mill and overlay from MN50 to Dakota County Road 58 $3,300,000 Not selected Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years.
78 MN65 Repair pavement and replace bridges 6817 ( new bridge # 02X06) and 9417 (02X07) over Coon Creek and ADA, signal replacement on Hwy 65 (Central Ave) from CR 10 (Mounds View Blvd) in Spring Lake Park to 217th Ave in East Bethel, cable median barrier from Bunker Lake Blvd to 237th $39,898,000 2024 Poor pavement conditions. 
78 MN65 Resurface road form 53rd Ave NE to South Moore Lake Dr $3,000,000 2027 Poor pavement conditions.
78 MN7 Medium mill and overlay from Shady Oak Rd to Texas Ave $3,000,000 Not Selected  RQI does not reflect on the ground conditions
79 MN51 Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over MN 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills $6,477,000 2026 Poor pavement conditions. ADA, bike/ped, and drainage needs. 
79 MN96 Resurface road from US 61 to MN 95 $10,280,000 2030 Projected poor pavement conditions.
81 MN5 Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave $600,000 Not selected Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down.
81 MN7 Resurface road from the Hennepin/Carver County line to Division St $23,100,000 2031 Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride.
81 MN97 Resurface road from US61 to MN95 $8,500,000 2028 Poor pavement conditions. Project has been deferred several times. 
87 MN120 Reconstruct road from 4th St in Maplewood to Hwy 244 in White Bear Lake $15,559,000 2027  
87 MN95 Resurface MN 95 from the Isanti county line to the bridge over Sunrise river $14,800,000 2028 Poor pavement conditions. 2020 RSL 0 to 5 years.
90 MN13 Medium mill and overlay from I-35W to Yankee Doodle Rd $6,900,000 Not selected RQI does not match on the ground conditions
90 MN95 Resurface road from US 8 to MN 36 $28,000,000 2029 Projected poor pavement conditions.