National Highway System bridge projects
Statewide bridge needs
MnDOT scores bridge condition needs when selecting projects to include in the 10-year Capital Highway Investment Plan. Bridges that carry roads on the National Highway System (NHS) are scored and selected separately from bridge needs off the system. MnDOT’s approach to managing bridge condition follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
NHS bridges are scored and prioritized statewide with input from district staff. The selection of bridge projects is informed by district staff, experts from MnDOT’s bridge office and the Bridge Replacement and Improvement Management System (BRIM).
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-bridge work may be added to a bridge project or a bridge project may be combined with a nearby pavement project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the bridge need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What’s been selected?
Related links
- National Highway System culvert projects
- Bridges projects over state highways carrying railroads
- Pedestrian bridge rehabilitation/replacement projects
- Non-National Highway System bridge projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed.
Last updated April 2024
District | Total score | Bridge number | Route | Key Intersection or Closest Landmark | Work Type | Year Planned | High level cost estimate for planning purposes | Comments |
---|---|---|---|---|---|---|---|---|
D7 | 99 | 07011 | US Hwy 14 | Minnesota River | Replace | 2032 | $ 29,320,000 | None |
D1 | 95 | 69802C | US Hwy 53 | 20th Ave W | Replace | 2027 | $ 12,700,000 | Bridge was recently load posted, replace with 69801G and 69802 bridges |
D1 | 90 | 9787 | I 35 | Grindstone River | Replace | 2024 | $ 1,600,000 | None |
D4 | 90 | 14809 | I 94 | Otter Tail Valley Railroad | Redeck | N/A | $ 820,000 | 2018 Safe Lane epoxy chip seal, Abutment rotation, Beams locked up, joints tight but sealed with hot rubber so not leaking |
D6 | 90 | 6776 | US Hwy 61 | CP Railroad | Replace | 2027 | $ 5,100,000 | FY2023 Project |
D7 | 90 | 07018 | US Hwy 14 | Blue Earth County Road 57 | Replace | 2032 | $ 3,370,000 | None |
D7 | 90 | 9098 | US Hwy 169 | Minnesota River | Reoverlay deck surface | 2027 | $ 6,060,000 | None |
D3 | 87 | 71012 | Hwy 25 | Mississippi River | Overlay | 2024 | $ 2,500,000 | (2022) Overlay in 2024 , no pier strengthening |
D1 | 82 | 69802 | US Hwy 53 | 21st Ave | Replace | 2027 | $ 16,900,000 | Bridge was recently load posted, replace with 69801G and 69802 bridges |
D2 | 80 | 5814 | Hwy 11 | Roseau River | Overlay | 2024 | $ 190,000 | LS Overlay, appr. Panels, Ped Railing - city requested railing replace |
D3 | 80 | 5060 | Hwy 210 | Mississippi River | Reoverlay deck surface | 2025 | $ 3,840,000 | (2022) Overlay in 2025 |
D3 | 80 | 6896 | I 94 | Sauk River | Reoverlay deck surface | 2026 | $ 550,000 | (2022) Downscope ReOvly (Site visit 2020) |
D3 | 80 | 6897 | I 94 | Sauk River | Reoverlay deck surface | 2026 | $ 600,000 | (2022) Downscope ReOvly (Site visit 2020) |
D1 | 80 | 69818S | I 35 | Hwy 194 | Reoverlay deck surface | 2024 | $ 100,000 | Received FY 2024 COVID relief funding, mill and overlay with 69818N |
D1 | 80 | 9493 | US Hwy 53 | Hwy 37 | Replace | 2025 | $ 1,900,000 | Replace with 9494 |
D1 | 80 | 9494 | US Hwy 53 | Hwy 38 | Replace | 2025 | $ 1,900,000 | Replace with 9493 |
D1 | 80 | 69840 | Hwy 194 | Superior St | Overlay deck surface | 2026 | $ 800,000 | Deck work and steel pier cap redundancy with 69839 |
D4 | 80 | 5854 | US Hwy 10 | Buffalo River | Replace | N/A | $ 2,940,000 | (2021) Moved to 2028 to coincide with the un-bonded overlay Replace Bridge (2018) needs site visit and review for work type - replace/rehab in 2024 |
D4 | 80 | 14810 | I 94 | Otter Tail Valley Railroad | Redeck | N/A | $ 820,000 | 2018 Safe Lane epoxy chip seal, Abutment rotation, Beams locked up, joints tight but sealed with hot rubber so not leaking |
D6 | 80 | 9178 | I 90 | 6th Street NE | Reoverlay | 2025 | $ 750,000 | FY2023 Project |
D6 | 80 | 9179 | I 90 | 6th Street NE | Reoverlay | 2025 | $ 1,030,000 | FY2027 Project, Flex24 |
D6 | 80 | 55029 | US Hwy 63 | North Branch Root River | Reoverlay | N/A | $ 780,000 | Candidate for future replacement project, cost is greater than total available budget. |
D7 | 80 | 07003 | Hwy 60 | Blue Earth County Road 6 | Overlay deck surface | 2025 | $ 410,000 | None |
D7 | 80 | 07015 | US Hwy 14 | UP Railroad | Reoverlay deck surface | 2032 | $ 530,000 | None |
D7 | 80 | 07017 | US Hwy 14 | Blue Earth County Road 57 | Replace | 2032 | $ 3,370,000 | None |
D7 | 80 | 07039 | US Hwy 169 | Blue Earth River | Reoverlay deck surface | N/A | $ 570,000 | None |
D2 | 78 | 9090 | US Hwy 2 | Red River | Replace | N/A | $ 15,660,000 | Rehab currently under construction |
D4 | 75 | 21815 | I 94 | Canadian Pacific Railroad | Redeck | 2024 | $ 100,000 | (2018) steel beam corrosion, joints leaking; Request CHIP Redeck 2019-2024 |
D6 | 75 | 6483 | US Hwy 61 | Hay Creek | Replace | 2023 | $ - | FY2025 Project |
D6 | 75 | 24808 | I 90 | I 35 | Replace | 2031 | $ 3,370,000 | FY2025 Project |
D3 | 70 | 5428 | US Hwy 71 | Sauk River | Reoverlay deck surface | 2027 | $ 1,080,000 | (2022) Downscope to overlay (2020 site visit) |
D3 | 70 | 6574 | US Hwy 10 | Platte River | Reoverlay deck surface | N/A | $ 750,000 | (2022) Overlay in 2027 |
D3 | 70 | 48010 | US Hwy 169 | Mille Lacs County Rd 31 | Reoverlay deck surface | 2025 | $ 700,000 | (2022) Overlay in 2025 |
D3 | 70 | 48011 | US Hwy 169 | West Branch Rum River | Overlay | 2025 | $ 700,000 | (2022) Overlay in 2025 |
D3 | 70 | 48016 | US Hwy 169 | Mille Lacs County Rd 29 | Reoverlay deck surface | 2025 | $ 700,000 | (2022) Overlay in 2025 |
D3 | 70 | 49009 | US Hwy 10 | Morrison County Rd 76; BNSF Railway | Overlay | N/A | $ 1,100,000 | (2022) ReOverlay in 2032 |
D3 | 70 | 71007 | US Hwy 169 | Sherburne County Rd 29 | Reoverlay deck surface | 2025 | $ 700,000 | (2022) Overlay in 2025 |
D3 | 70 | 71008 | US Hwy 169 | Sherburne County Rd 29 | Reoverlay deck surface | 2025 | $ 700,000 | (2022) Overlay in 2025 |
D3 | 70 | 73820 | I 94 | Stearns County Rd 184 | Reoverlay deck surface | N/A | $ 790,000 | (2022) Overlay in 2030 |
D3 | 70 | 73849 | I 94 | Hwy 238 | Reoverlay deck surface | N/A | $ 570,000 | (2022) Downscope to Overlay in 2027 |
D3 | 70 | 73850 | I 94 | Hwy 238 | Reoverlay deck surface | N/A | $ 600,000 | (2022) downscope to Overlay in 2027 |
D3 | 70 | 73877 | I 94 | Jade Road | Reoverlay deck surface | N/A | $ 650,000 | (2022) Overlay in 2027 |
D3 | 70 | 73878 | I 94 | Jade Road | Reoverlay deck surface | N/A | $ 650,000 | (2022) Overlay in 2027 |
D4 | 70 | 5025 | US Hwy 59 | Pelican River | Reoverlay deck surface | 2024 | $ 80,000 | 2020 Overlay with SP 5618-117 redecked in 1990, epoxy rebars, some deck delam, reoverlay 2nd time period |
D6 | 70 | 23009 | US Hwy 52 | South Branch Root River | Overlay | N/A | $ 410,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 70 | 25014 | US Hwy 61 | Spring Creek | Reoverlay | N/A | $ 370,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 70 | 85844 | I 90 | Winona County Road 7 | Reoverlay | N/A | $ 320,000 | Removed from CHIP |
D7 | 70 | 07019 | US Hwy 14 | Blue Earth County Road 3 | Overlay deck surface | 2032 | $ 440,000 | None |
D7 | 70 | 07023 | US Hwy 14 | US Hwy 169 | Replace | 2032 | $ 11,060,000 | None |
D7 | 70 | 07029 | US Hwy 169 | South Riverfront Drive | Reoverlay deck surface | 2027 | $ 860,000 | None |
D7 | 70 | 07030 | US Hwy 169 | Sibley Street | Reoverlay deck surface | N/A | $ 670,000 | None |
D7 | 70 | 07040 | US Hwy 169 | Blue Earth River | Reoverlay deck surface | N/A | $ 530,000 | None |
D7 | 70 | 07041 | US Hwy 169 | Off Ramp from US Hwy 169 | Reoverlay deck surface | N/A | $ 490,000 | None |
D7 | 70 | 17006 | Hwy 60 | UP Railroad | Overlay deck surface | 2028 | $ 450,000 | None |
D7 | 70 | 17007 | Hwy 60 | UP Railroad | Overlay deck surface | 2028 | $ 440,000 | None |
D7 | 70 | 83037 | Hwy 60 | UP Railroad | Overlay deck surface | 2027 | $ 360,000 | None |
D2 | 65 | 60001 | US Hwy 2 | 4th St NW | Replace | N/A | $ 5,590,000 | (2019) steel girder corrosion at contraction joint abutment along longitudinal CL joint, cracks drilled by cover plates; Replace or superstructure - pile bents in OK condition, can stage 1/2 at a time - 4 lane |
D3 | 65 | 73805 | I 94 | Sauk River | Redeck | 2026 | $ 1,370,000 | (2022) Downscope ReDeck (Site Visit 2020 |
D3 | 65 | 86807 | Hwy 24 | I 94 | Replace | N/A | $ 5,000,000 | (2022) Replace in 2027 |
D1 | 65 | 9788 | I 35 | Grindstone River | Replace | 2024 | $ 1,600,000 | Replacing with 9787, 9789, 9790 |
D1 | 65 | 9789 | I 35 | BNSF Railroad | Replace | 2024 | $ 1,000,000 | Replacing with 9787, 9788, 9790 |
D1 | 65 | 9790 | I 35 | BNSF Railroad | Replace | 2024 | $ 2,800,000 | Replacing with 9787, 9788, 9789 |
D1 | 65 | 9030 | I 535 | St Louis River | Replace | 2028 | $ 200,000,000 | Selected prior to policy (in 2019-2022 STIP); Replacement planned for 2028 |
D4 | 65 | 4199 | US Hwy 59 | Pelican River | Replace | N/A | $ 1,330,000 | 2024; SR=78.6; narrow; patching; single rail |
D4 | 65 | 21816 | I 94 | Canadian Pacific Railroad | Redeck | 2024 | $ 100,000 | (2018) steel beam corrosion, joints leaking; Request CHIP Redeck 2019-2024 |
D6 | 65 | 6868 | I 90 | Cedar River | Replace | 2025 | $ - | Removed from CHIP |
D6 | 65 | 6869 | I 90 | Cedar River | Replace | 2025 | $ - | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9046 | US Hwy 61 | Burns Creek | Replace | N/A | $ 2,320,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9062 | US Hwy 61 | Cedar Creek | Replace | N/A | $ 2,230,000 | FY2025 Project |
D6 | 65 | 9063 | US Hwy 61 | Cedar Creek | Replace | N/A | $ 2,260,000 | FY2025 Project |
D6 | 65 | 9093 | US Hwy 61 | Pleasant Valley Creek | Replace | N/A | $ 2,450,000 | FY2021 Project |
D6 | 65 | 9728 | I 90 | Freeborn County Road 46 | Replace | N/A | $ 3,390,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 24807 | I 90 | I 35 | Replace | 2031 | $ 3,490,000 | FY2021 Project |
D6 | 65 | 24821 | I 90 | UP Railroad | Replace | N/A | $ 2,140,000 | Candidate for future maintenance project, cost is greater than total available budget. |
D6 | 65 | 24837 | I 90 | IM Railroad | Replace | 2026 | $ - | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 55026 | US Hwy 52 | 36th Avenue SE | Redeck | N/A | $ 910,000 | FY2024 Project |
D6 | 65 | 74010 | US Hwy 14 | Steele County Road 48 | Redeck | N/A | $ 2,280,000 | FY2024 Project |
D7 | 65 | 07009 | US Hwy 14 | Blue Earth County Road 5 | Replace | 2032 | $ 2,740,000 | None |
D7 | 65 | 07010 | US Hwy 14 | Blue Earth County Road 5 | Replace | 2032 | $ 2,740,000 | None |
D7 | 65 | 17001 | Hwy 60 | Des Moines River | Replace | 2031 | $ 6,080,000 | None |
D7 | 65 | 53819 | I 90 | Hwy 60 | Replace | N/A | $ 8,460,000 | None |
D7 | 65 | 53820 | I 90 | Hwy 60 | Replace | N/A | $ 8,660,000 | None |
D8 | 65 | 6751 | US Hwy 59 | Spring Creek | Replace | 2030 | $ 970,000 | None |
D8 | 65 | 6782 | Hwy 30 | Des Moines River | Replace | 2028 | $ 1,050,000 | None |
D8 | 65 | 6801 | Hwy 4 | South Fork Crow River | Replace | 2030 | $ 1,190,000 | None |
D8 | 65 | 6853 | Hwy 4 | Middle Fork Crow River | Replace | 2030 | $ 750,000 | None |
D8 | 65 | 6854 | Hwy 4 | North Fork Crow River | Replace | 2030 | $ 1,920,000 | None |
D8 | 65 | 9112 | 1st ST (MSAS 103) | Hwy 29 | Replace | N/A | $ 2,900,000 | This is a bridge over the Highway and therefore is a lower priority with limited funding |
D4 | 60 | 21817 | I 94 | Douglas CSAH 23 | Redeck | 2024 | $ 70,000 | Consider tieing to 21815 & 21816 |
D4 | 60 | 21818 | I 94 | Douglas CSAH 23 | Redeck | 2024 | $ 70,000 | Consider tieing to 21815 & 21816 |
D6 | 60 | 28017 | US Hwy 61 | Mississippi River | Overlay | N/A | $ 290,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 60 | 85017 | Hwy 43 | West Burns Valley Creek | Overlay | N/A | $ 160,000 | FY2031 Project |
D7 | 60 | 07036 | Hwy 22 | DME Railroad | Overlay deck surface | 2024 | $ - | None |
D3 | 55 | 5444 | US Hwy 10 | BNSF Railway | Redeck | N/A | $ 2,230,000 | (2022) Downscope to redeck |
D3 | 55 | 86817 | I 94 | Wright County Rd 19 | Replace | 2024 | $ 5,490,000 | (2022) Replace in 2024 3 lane BR 86825 |
D8 | 55 | 9017 | US Hwy 75 | Stream south of Jct MN7 near Odessa | Replace | 2028 | $ 2,490,000 | None |
D4 | 45 | 84002 | Hwy 210 | Red River of the North | Redeck | N/A | $ 2,180,000 | North Dakota Lead;weathering steel; do not need to paint 2020 jacked approach panels, spall repair and new mseal. |
D6 | 45 | 6865 | Hwy 3 | Cannon River | Replace | N/A | $ 7,260,000 | FY2026 Project |
D6 | 45 | 9045 | US Hwy 61 | Burns Creek | Replace | N/A | $ 2,320,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 45 | 24815 | I 90 | West of Freeborn County Road 13 | Replace | 2026 | $ - | Candidate for future repair project, cost is greater than total available budget. |
D7 | 45 | 07037 | US Hwy 169 | Blue Earth River | Replace | N/A | $ 3,580,000 | None |
D7 | 45 | 53817 | I 90 | US Hwy 59 | Replace | 2025 | $ - | None |
D7 | 45 | 53818 | I 90 | US Hwy 59 | Replace | 2025 | $ - | None |
D8 | 45 | 6403 | US Hwy 75 | Canby Creek | Replace | 2026 | $ - | Replacing guardrail only to bring up to MASH standards |
D8 | 45 | 42003 | US Hwy 59 | Diversion channel north of Fairview St in Willmar | Replace | 2031 | $ 2,010,000 | None |
D6 | 35 | 24839 | I 90 | Freeborn County Road 10 | Replace | 2026 | $ - | FY2026 Project |
D3 | 30 | 05003 | Hwy 15 | US Hwy 10 | Replace | N/A | $ 3,350,000 | (2022) Replace in 2027 |
D3 | 30 | 73809 | I 94 | Sauk River | Redeck | 2026 | $ 1,370,000 | (2022) Downscope Redeck (2020 Site Visit) |
D3 | 30 | 73811 | I 94 | Sauk River | Redeck | N/A | $ 1,090,000 | (2022) downscope Redeck in 2027 Site visit 2021 |
D1 | 30 | 69818N | I 35 | Hwy 194 | Reoverlay deck surface | 2024 | $ 100,000 | Received FY 2024 covid relief funding, mill and overlay with 69818S |
D6 | 30 | 9092 | US Hwy 61 | Mississippi River | Replace | N/A | $ 2,450,000 | FY2026 Project |
D6 | 30 | 9414 | US Hwy 52 | Replace | N/A | $ 2,740,000 | FY2023 Project | |
D6 | 25 | 24827 | I 35 | Albert Lea Lake | Reoverlay | N/A | $ 2,350,000 | Candidate for future bridge repair and overlay project, cost is greater than total available budget |
D6 | 25 | 24828 | I 35 | Albert Lea Lake | Reoverlay | N/A | $ 2,210,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 20 | 9659 | US Hwy 52 | N/A | Replace | N/A | $ 2,610,000 | FY2023 Project |
D6 | 20 | 55025 | US Hwy 52 | 36th Avenue SE | Redeck | N/A | $ 910,000 | Candidate for future re-deck project, cost is greater than available budget. |
D6 | 20 | 55809 | I 90 | US Hwy 52 | Replace | 2024 | $ - | Candidate for future re-deck project, cost is greater than available budget. |
D6 | 20 | 55810 | I 90 | US Hwy 52 | Replace | 2024 | $ - | Candidate for future bridge repair and overlay project, cost is greater than total available budget |
D6 | 20 | 85815 | I 90 | Olmstead County Road 10 | Replace | 2025 | $ - | FY2024 Project |
D7 | 20 | 53815 | I 90 | Rowe Avenue | Replace | 2025 | $ - | None |
D8 | 20 | 6706 | Hwy 40 | Ditch north of 220th St near Madison | Replace | 2028 | $ 910,000 | None |
D1 | 15 | 69808 | I 535 | BNSF Railroad | Redeck | 2028 | $ 7,300,000 | Removed from TPI project, Planned with Blatnik bridge replacement |
D3 | 10 | 6870 | I 94 | Sauk River | Reoverlay deck surface | N/A | $ 800,000 | (2022) Downscope to overlay in 2027 |
D1 | 10 | 69801G | I 535 | Superior St | Replace | 2027 | $ 5,900,000 | Temporary connection to Twin Ports Interchange, replace with 69802 bridges |
D1 | 10 | 69870B | I 35 | North of Harbor Dr | Reoverlay deck surface | 2031 | $ 500,000 | To coordinate with the timing of another MnDOT project, 69870 redeck |
D4 | 10 | 9026 | US Hwy 10 | Buffalo River | Replace | N/A | $ 1,260,000 | 2020 Highway project in 2028 |
D4 | 10 | 9031 | US Hwy 10 | Buffalo River | Replace | N/A | $ 1,150,000 | 2020 Highway project in 2028 |
D4 | 10 | 56001 | Hwy 210 | I 94 | Replace | N/A | $ 3,020,000 | Replace railing/ monitor deck include with Br 9697 |
D6 | 10 | 9727 | I 90 | Freeborn County Road 46 | Preventative Maintenance | N/A | $ 160,000 | FY2024 Project |
D6 | 10 | 85843 | I 90 | Winona County Road 7 | Replace | N/A | $ 1,920,000 | FY2023 Project |
D7 | 10 | 07020 | US Hwy 14 | Blue Earth County Road 3 | Overlay deck surface | 2032 | $ 450,000 | None |
D7 | 10 | 32003 | Hwy 60 | Jack Creek | Overlay deck surface | 2029 | $ 300,000 | None |
D7 | 10 | 52012 | US Hwy 169 | US Hwy 169 Ramp | Reoverlay deck surface | 2027 | $ 550,000 | None |
D8 | 10 | 42012 | Hwy 68 | Three Mile Creek | Overlay | 2029 | $ 280,000 | None |
D2 | 0 | 15001 | US Hwy 2 | Clearwater River | Redeck | 2024 | $ 50,000 | None |
D1 | 0 | 69810 | I 535 | BNSF Railroad | Redeck | 2028 | $ 2,000,000 | Removed from TPI project, Planned with Blatnik bridge replacement |
D4 | 0 | 61001 | Hwy 28 | Chippewa River | Preventative Maintenance | 2025 | $ - | None |
D4 | 0 | 75002 | Hwy 28 | Pomme De Terre River | Preventative Maintenance | 2025 | $ - | None |
D6 | 0 | 9449 | US Hwy 61 | East 5th St | Replace | N/A | $ 4,020,000 | None |
D6 | 0 | 20001 | US Hwy 14 | Hwy 57 | Redeck | 2024 | $ - | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 0 | 20002 | US Hwy 14 | Hwy 57 | Replace | 2024 | $ - | FY 2025 Project |
D6 | 0 | 55815 | I 90 | Olmstead County Road 10 | Replace | N/A | $ 2,550,000 | FY 2025 Project |
D6 | 0 | 55816 | I 90 | Olmstead County Road 10 | Replace | N/A | $ 2,550,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 0 | 85803 | I 90 | US Hwy 61 | Replace | 2025 | $ - | Candidate for future bridge repair and overlay project, cost is greater than total available budget |
D7 | 0 | 07016 | US Hwy 14 | UP Railroad | Reoverlay deck surface | 2032 | $ 560,000 | None |
D7 | 0 | 07021 | US Hwy 14 | DME Railroad | Overlay deck surface | 2027 | $ 490,000 | None |
D7 | 0 | 07022 | US Hwy 14 | DME Railroad | Overlay deck surface | 2027 | $ 490,000 | None |
D7 | 0 | 07025 | US Hwy 14 | Hwy 22 | Overlay deck surface | 2027 | $ 360,000 | None |
D7 | 0 | 07026 | US Hwy 14 | Hwy 22 | Overlay deck surface | 2027 | $ 360,000 | None |
D7 | 0 | 32004 | Hwy 60 | JUD Ditch #76 | Overlay deck surface | 2029 | $ 250,000 | None |
D7 | 0 | 32005 | Hwy 60 | JUD Ditch #76 | Overlay deck surface | 2029 | $ 240,000 | None |
D7 | 0 | 32006 | Hwy 60 | Jack Creek | Overlay deck surface | 2029 | $ 140,000 | None |
D7 | 0 | 53005 | Hwy 60 | Elk Creek | Overlay deck surface | 2029 | $ 260,000 | None |
D7 | 0 | 53006 | Hwy 60 | Elk Creek | Overlay deck surface | 2029 | $ 250,000 | None |
D7 | 0 | 53816 | I 90 | Rowe Avenue | Replace | 2025 | $ - | None |
View more detailed scores (Excel)
District | Tortal score | Bridge number | Route | Key Intersection or Closest Landmark | Work Type | Year Planned | High level cost estimate for planning purposes | Comments |
---|---|---|---|---|---|---|---|---|
DM | 100 | 9217E | I 494 | Minnesota River | Reoverlay deck surface | 2023 | $7,500,000 | N/A |
DM | 100 | 9217W | I 494 | Minnesota River | Reoverlay deck surface | 2023 | $7,100,000 | N/A |
DM | 100 | 9600N | Hwy 77 | Minnesota River | Reoverlay deck surface | Not Selected | $8,600,000 | Painting and maintenance performed in 2015 |
DM | 100 | 9600S | Hwy 77 | Minnesota River | Reoverlay deck surface | Not Selected | $8,600,000 | Painting and maintenance performed in 2015 |
DM | 97 | 27855 | I 94 | Hwy 55 | Overlay deck surface | 2024 | $5,200,000 | N/A |
D1 | 95 | 69802C | US Hwy 53 | 19th | Replace | 2027 | $12,700,000 | Bridge was recently load posted, replace with 69801G and 69802 bridges |
D1 | 90 | 9787 | I 35 SB | Grindstone River | Replace | 2024 | $1,600,000 | N/A |
D6 | 90 | 6776 | US Hwy 61 | CP Railroad | Replace | 2026 | $4,580,000 | N/A |
D7 | 90 | 9098 | US Hwy 169 | Minnesota River | Reoverlay deck surface | 2027 | $4,700,000 | N/A |
DM | 90 | 9700 | US Hwy 10 | Rum River | Replace | 2022 | $6,200,000 | N/A |
DM | 90 | 27177 | Hwy 55 | Franklin Ave | Redeck | 2022 | $400,000 | N/A |
DM | 90 | 27586 | US Hwy 169 | Excelsior Blvd | Reoverlay deck surface | Not Selected | $2,800,000 | Drainage system repair planned |
DM | 90 | 27831 | I 394 | Dunwoody Blvd | Overlay deck surface | 2026 | $20,200,000 | N/A |
DM | 88 | 27792 | I 394 | I 94 | Reoverlay deck surface | 2026 | $3,300,000 | N/A |
D3 | 87 | 71012 | Hwy 25 | Mississippi River | Overlay deck surface | 2024 | $2,400,000 | N/A |
DM | 86 | 19825 | I 494 | Hwy 13 | Reoverlay deck surface | 2023 | $2,800,000 | N/A |
D7 | 84 | 07011 | US Hwy 14 | Minnesota River | Replace | Not Selected | $24,300,000 | Working to coordinate with Roadway Pavement project |
D1 | 82 | 69802 | US Hwy 53 | 21St Ave | Replace | 2027 | $16,900,000 | Bridge was recently load posted, replace with 69801G and 69802 bridges |
D1 | 80 | 09823 | I 35 SB | Carlton County Road 61 | Redeck | 2023 | $400,000 | N/A |
D1 | 80 | 69818S | I 35 SB | Hwy 194 | Reoverlay deck surface | 2024 | $100,000 | Received FY 2024 COVID relief funding, mill and overlay with 69818N |
D1 | 80 | 9493 | US Hwy 53 SB | Hwy 37 | Replace | 2025 | $1,900,000 | Replace with 9494 |
D1 | 80 | 9494 | US Hwy 53 NB | Hwy 38 | Replace | 2025 | $1,900,000 | Replace with 9493 |
D1 | 80 | 69840 | Hwy 194 NB | Superior St | Overlay deck surface | 2026 | $800,000 | Deck work and steel pier cap redundancy with 69839 |
D1 | 80 | 09815 | I 35 SB | Moose Horn River | Replace | Not Selected | $1,800,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 80 | 09816 | I 35 NB | Moose Horn River | Replace | Not Selected | $1,800,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 80 | 09817 | I 35 SB | Moose Horn River | Replace | Not Selected | $1,700,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 80 | 69121 | US Hwy 2 | St Louis River | Overlay deck surface | Not Selected | $1,000,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 80 | 38010 | Hwy 61 | Gooseberry River | Overlay deck surface | Not Selected | $1,400,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 80 | 36013 | US Hwy 71 | Little Fork River | Overlay deck surface | Not Selected | $600,000 | Not a district priority. Will continue to monitor bridge performance |
D2 | 80 | 5814 | Hwy 11 | Roseau River | Overlay deck surface | 2024 | $200,000 | Selected with a higher scoring pavement project |
D3 | 80 | 5060 | Hwy 210 | Mississippi River | Reoverlay deck surface | 2025 | $3,840,000 | N/A |
D3 | 80 | 73850 | I 94 EB | MN238 | Overlay deck surface | 2027 | $750,000 | Downscope to Overlay in 2027 tie to 73849 with score of 80 |
D3 | 80 | 6897 | I 94 EB | Sauk River | Overlay deck surface | 2026 | $600,000 | Downscope Reoverlay tie to 73809 with score of 80 |
D3 | 80 | 73849 | I 94 WB | MN238 | Overlay deck surface | 2027 | $750,000 | Downscope to Overlay in 2027 tie to 73850 with score of 80 |
D3 | 80 | 73875 | I 94 WB | BNSF Railroad | Reoverlay deck surface | 2022 | $900,000 | Downscope to reoverlay and abutments tie tie to 73876 with score of 80 |
D3 | 80 | 73876 | I 94 EB | BNSF Railroad | Reoverlay deck surface | 2022 | $900,000 | Downscope to reoverlay and abutments tie to 73875 with a score of 80 |
D3 | 80 | 6896 | I 94 EB | Sauk River | Overlay deck surface | 2026 | $610,000 | Downscope to reoverlay tie to 73805 with a score of 80 |
D4 | 80 | 9697 | Hwy 210 | I 94 | Replace | 2028 | $2,500,000 | Coordinated with pavement project |
D6 | 80 | 55029 | US Hwy 63 | Root River | Reoverlay deck surface | Not Selected | $400,000 | Candidate for future bridge repair and overlay project, cost is greater than total available budget |
D6 | 80 | 9178 | I 90 WB | 6Th St NE | Reoverlay deck surface | 2025 | $630,000 | N/A |
D6 | 80 | 9179 | I 90 EB | 6Th St NE | Reoverlay deck surface | 2025 | $860,000 | N/A |
D7 | 80 | 52001 | US Hwy 169 SB | Robarts Creek | Replace | 2022 | $2,000,000 | N/A |
D7 | 80 | 83016 | Hwy 15 NB | Wantonwan County Road 9 | Overlay deck surface | 2023 | $400,000 | N/A |
D7 | 80 | 07003 | Hwy 60 | Blue Earth County Rd 6 | Overlay deck surface | 2024 | $400,000 | N/A |
DM | 80 | 02024 | Hwy 610 | East River Road | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 80 | 02815 | I 694 | Hwy 65 | Reoverlay deck surface | Not Selected | $900,000 | On the ground conditions do not match predicted conditions. |
DM | 80 | 6805 | Hwy 280 | U of M Transitway | Overlay deck surface | 2026 | $2,600,000 | N/A |
DM | 80 | 19033 | US Hwy 52 | Vermillion River | Reoverlay deck surface | 2023 | $300,000 | N/A |
DM | 80 | 19067 | Dakota County Road 32 | Hwy 77 | Reoverlay deck surface | Not Selected | $1,200,000 | N/A |
DM | 80 | 19075 | US Hwy 61 | Vermillion River | Reoverlay deck surface | Not Selected | $500,000 | N/A |
DM | 80 | 19812 | I 35E NB | Dakota County Road 42 | Reoverlay deck surface | Not Selected | $800,000 | N/A |
DM | 80 | 19816 | Cliff Road | I 35E | Reoverlay deck surface | Not Selected | $2,100,000 | N/A |
DM | 80 | 19855 | US Hwy 52 | I 494 | Reoverlay deck surface | Not Selected | $1,600,000 | Repair with pavement project |
DM | 80 | 19856 | US Hwy 52 | I 494 | Reoverlay deck surface | Not Selected | $1,600,000 | Repair with pavement project |
DM | 80 | 19865 | I 494 | Hwy 156 (Concord St) | Reoverlay deck surface | Not Selected | $1,600,000 | N/A |
DM | 80 | 27053 | Hwy 77 | I494 | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 80 | 27237 | Hwy 55 | BNSF/CP Railroad | Reoverlay deck surface | Not Selected | $900,000 | Repair with Blue Line |
DM | 80 | 27742 | US Hwy 169 | I 394 | Reoverlay deck surface | Not Selected | $2,000,000 | N/A |
DM | 80 | 27767 | I 494 | MN5 | Reoverlay deck surface | 2023 | $2,000,000 | N/A |
DM | 80 | 27859 | I 94 | CP railroad | Overlay deck surface | 2024 | $1,900,000 | N/A |
DM | 80 | 27909 | I 94 EB | Shingle Creek | Reoverlay deck surface | Not Selected | $200,000 | (2021) mixed bar slab span; SP 2781-432, 2017 remove and patch slab - quantity 10SF |
DM | 80 | 82003 | US Hwy 61 | Jamaica Avenue | Reoverlay deck surface | Not Selected | $300,000 | Future overlay candidate |
DM | 80 | 82800 | I 94 | St Croix River | Reoverlay deck surface | Not Selected | $12,100,000 | WisDOT lead…. |
DM | 80 | 82849 | I 94 | Hwy 95 | Reoverlay deck surface | Not Selected | $900,000 | N/A |
DM | 80 | 82850 | I 94 | Hwy 95 | Reoverlay deck surface | Not Selected | $1,000,000 | N/A |
DM | 80 | 82856 | I 494 | Mississippi River | Reoverlay deck surface | 2024 | $3,900,000 | N/A |
DM | 80 | 27770A | I 394 | Over railroad yard | Reoverlay deck surface | 2026 | $800,000 | N/A |
DM | 80 | 27770B | I 394 | BNSF/UP Railroad | Reoverlay deck surface | 2026 | $1,200,000 | N/A |
DM | 79 | 27239 | Hwy 610 WB | Mississippi River | Reoverlay deck surface | Not Selected | $2,400,000 | N/A |
D3 | 75 | 9022 | Hwy 23 NB | US Hwy 10 | Replace | 2023 | $1,398,000 | N/A |
D3 | 75 | 9021 | Hwy 23 SB | US Hwy 10 | Replace | 2023 | $1,328,000 | N/A |
D6 | 75 | 24808 | I 90 EB | I 35 | Replace | Not Selected | $2,890,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 75 | 6483 | US Hwy 61 | Hay Creek | Replace | 2024 | $10,000,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 6482. |
D8 | 75 | 34524 | Kandiyohi County Road 153 | US Hwy 12 | Reoverlay deck surface | Not selected | $1,090,000 | City of Willmar owner/responsibility. |
DM | 75 | 9717 | US Hwy 10 | BNSF Railroad | Replace | 2022 | $7,400,000 | 2013 novachip, Scope with Rum River 2024 |
DM | 75 | 19843 | I 35 | 205th St | Replace | Not Selected | $2,600,000 | Resurfaced in 2013 |
DM | 75 | 19844 | I 35 | 205th St | Replace | Not Selected | $2,600,000 | Resurfaced in 2013 |
DM | 75 | 27201 | Hwy 55 | Lake St | Reoverlay deck surface | Not Selected | $3,700,000 | N/A |
DM | 75 | 27879 | I 35W | 3rd street | Redeck | Not Selected | $3,700,000 | N/A |
DM | 75 | 27925 | I 94 WB | Shingle Creek | Replace | Not Selected | $2,200,000 | (2021) slab span mixed bar underside spalling |
D1 | 70 | 58807 | I 35 SB | Kettle River | Reoverlay deck surface | Not Selected | $700,000 | Not a district priority. Will continue to monitor bridge performance |
D3 | 70 | 48011 | US Hwy 169 SB | Rum River | Overlay deck surface | 2025 | $700,000 | Tie to 4812 |
D3 | 70 | 71007 | US Hwy 169 SB | Sherburne County Road 29 | Reoverlay deck surface | 2025 | $700,000 | Tie to 71008 |
D3 | 70 | 73855 | I 94 WB | MN15 | Reoverlay deck surface | 2025 | $900,000 | Received new wearing surface in 2016, Review NBI and RSL |
D3 | 70 | 73856 | I 94 EB | MN16 | Reoverlay deck surface | 2025 | $600,000 | Received new wearing surface in 2016, Review NBI and RSL |
D3 | 70 | 48016 | US Hwy 169 NB | Mille Lacs County Road 29 | Reoverlay deck surface | 2025 | $700,000 | Tie to 48015 |
D3 | 70 | 48010 | US Hwy 169 NB | Mille Lacs County Road 31 | Reoverlay deck surface | 2025 | $700,000 | tie to 48009 |
D3 | 70 | 71008 | US Hwy 169 NB | Sherburne County Road 29 | Reoverlay deck surface | 2025 | $700,000 | Tie to 71007 |
D3 | 70 | 73877 | I 94 WB | Jade Road | Overlay deck surface | 2027 | $750,000 | Tie to 73878 with score of 70 |
D3 | 70 | 73878 | I 94 EB | Jade Road | Overlay deck surface | 2027 | $750,000 | Tie to 73877 with a score of 70 |
D3 | 70 | 73820 | I 94 EB | Stearns County Road184 | Overlay deck surface | 2030 | $700,000 | N/A |
D3 | 70 | 6574 | US Hwy 10 EB | Platte River | Overlay deck surface | 2027 | $750,000 | N/A |
D3 | 70 | 5428 | US Hwy 71 | Sauk River | Overlay deck surface | 2026 | $1,000,000 | Downscope to overlay |
D6 | 70 | 23009 | US Hwy 52 | Root River | Overlay deck surface | Not Selected | $310,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 70 | 25014 | US Hwy 61 NB | Spring Creek | Reoverlay deck surface | Not Selected | $270,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 70 | 85844 | I 90 EB | Winona County Road 7 | Reoverlay deck surface | Not Selected | $260,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D7 | 70 | 83022 | Hwy 15 | UP Railroad | Reoverlay deck surface | 2022 | $500,000 | N/A |
D7 | 70 | 17006 | Hwy 60 EB | UP Railroad | Overlay deck surface | 2025 | $400,000 | N/A |
D7 | 70 | 17007 | Hwy 60 WB | UP Railroad | Overlay deck surface | 2025 | $400,000 | N/A |
D7 | 70 | 53817 | I 90 WB | Hwy 59 | Overlay deck surface | 2026 | $300,000 | N/A |
D7 | 70 | 53815 | I 90 WB | Rowe Ave | Overlay deck surface | 2026 | $400,000 | N/A |
D7 | 70 | 07029 | US Hwy 169 | S Riverfront Dr | Reoverlay deck surface | 2027 | $700,000 | N/A |
D7 | 70 | 83037 | Hwy 60 | UP Railroad | Overlay deck surface | 2028 | $300,000 | N/A |
D7 | 70 | 07039 | US Hwy 169 SB | Blue Earth River | Reoverlay deck surface | Not Selected | $500,000 | Working to coordinate with Roadway Pavement project |
D7 | 70 | 07019 | US Hwy 14 WB | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Working to coordinate with Roadway Pavement project |
D7 | 70 | 07040 | US Hwy 169 NB | Blue Earth River | Reoverlay deck surface | Not Selected | $400,000 | Working to coordinate with Roadway Pavement project |
D7 | 70 | 07041 | US Hwy 169 NB | US Hwy 169 | Reoverlay deck surface | Not Selected | $400,000 | Working to coordinate with Roadway Pavement project |
D8 | 70 | 5133 | Hwy 19 | Redwood River | Reoverlay deck surface | 2022 | $1,210,000 | N/A |
D8 | 70 | 12000 | US Hwy 212 | Minnesota River | Overlay deck surface | 2031 | $1,030,000 | Overlay after Blatnick |
DM | 70 | 02025 | Hwy 610 | BNSF Railroad | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 70 | 02026 | Hwy 610 | BNSF Railroad | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 70 | 02027 | Hwy 610 | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $500,000 | N/A |
DM | 70 | 02028 | Hwy 610 | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $400,000 | N/A |
DM | 70 | 4190 | Hwy 55 | Minnesota River | Reoverlay deck surface | 2022 | $7,400,000 | N/A |
DM | 70 | 6583 | I 35W | Cliff Road | Replace | 2025 | $6,600,000 | N/A |
DM | 70 | 9431 | Hwy 100 | W 70th St | Reoverlay deck surface | Not Selected | $1,000,000 | N/A |
DM | 70 | 10022 | US Hwy 212 | Carver County Road 36 | Overlay deck surface | Not Selected | $700,000 | (2019) mill and overlay, joints, roadway CPR work let in FY23 |
DM | 70 | 19023 | Hwy 55 | US Hwy 52 | Reoverlay deck surface | Not Selected | $1,300,000 | N/A |
DM | 70 | 19811 | I 35E SB | Dakota County Road 42 | Reoverlay deck surface | Not Selected | $800,000 | N/A |
DM | 70 | 19827 | Hwy 55 | I494 | Redeck | 2022 | $9,300,000 | N/A |
DM | 70 | 19891 | I 35W SB | Southcross Drive | Reoverlay deck surface | Not Selected | $700,000 | N/A |
DM | 70 | 19892 | I 35W NB | Southcross Drive | Reoverlay deck surface | Not Selected | $1,200,000 | N/A |
DM | 70 | 19893 | I 35E SB | Southcross Drive | Reoverlay deck surface | Not Selected | $800,000 | Repaired in 2013 |
DM | 70 | 19896 | I 494 | UP Railroad Hardman Ave | Reoverlay deck surface | Not Selected | $1,500,000 | N/A |
DM | 70 | 27044 | Hwy 55 | Crow River | Reoverlay deck surface | Not Selected | $700,000 | N/A |
DM | 70 | 27051 | Hwy 77 | American Blvd | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 70 | 27068 | Hwy 7 | Cedar Lake Trail | Reoverlay deck surface | 2026 | $800,000 | N/A |
DM | 70 | 27070 | Hwy 77 NB | I494 | Reoverlay deck surface | Not Selected | $300,000 | N/A |
DM | 70 | 27193 | Hwy 7 | Minnehaha Creek | Reoverlay deck surface | 2026 | $400,000 | N/A |
DM | 70 | 27734 | I 694 | I 94 | Reoverlay deck surface | Not Selected | $1,400,000 | N/A |
DM | 70 | 27863 | I 94 | Cedar Ave | Overlay deck surface | 2024 | $1,500,000 | N/A |
DM | 70 | 27891 | I 694 | MN252 | Reoverlay deck surface | 2024 | $700,000 | N/A |
DM | 70 | 27971 | Hwy 55 | I 494 | Reoverlay deck surface | Not Selected | $2,000,000 | Repaired and painted in 2014 |
DM | 70 | 62817 | I 94 EB | I 35E | Reoverlay deck surface | Not Selected | $900,000 | N/A |
D1 | 69 | 09009 | Hwy 33 | St Louis River | Reoverlay deck surface | Not Selected | $2,200,000 | Not a district priority. Will continue to monitor bridge performance |
D1 | 65 | 5923 | Hwy 61 | Pigeon River | Redeck | 2023 | $500,000 | International border bridge in coordination with Canada |
D1 | 65 | 9788 | I 35 NB | Grindstone River | Replace | 2024 | $1,600,000 | Replacing with 9787, 9789, 9790 |
D1 | 65 | 9789 | I 35 SB | BNSF Railroad | Replace | 2024 | $1,000,000 | Replacing with 9787, 9788, 9790 |
D1 | 65 | 9790 | I 35 NB | BNSF Railroad | Replace | 2024 | $2,800,000 | Replacing with 9787, 9788, 9789 |
D1 | 65 | 9030 | I 535 | St Louis River | Replace | 2028 | $200,000,000 | Selected prior to policy (in 2019-2022 STIP); Replacement planned for 2028 |
D1 | 65 | 09805 | I 35 SB | Hwy 45 | Replace | Not Selected | $2,100,000 | N/A |
D1 | 65 | 6602 | US Hwy 53 NB | St Louis River | Replace | Not Selected | $2,200,000 | N/A |
D1 | 65 | 69060 | US Hwy 169 NB | Saint Louis County Road 102 | Redeck | Not Selected | $900,000 | N/A |
D1 | 65 | 6501 | I 35 | DMIR railyard | Replace | Not Selected | $5,100,000 | N/A |
D1 | 65 | 31012 | US Hwy 169 NB | BNSF Railroad | Redeck | Not Selected | $900,000 | N/A |
D1 | 65 | 69018 | US Hwy 53 NB | Whiteface River | Replace | Not Selected | $2,000,000 | N/A |
D2 | 65 | 9059 | Hwy 11 | Warroad River | Redeck | 2024 | $1,000,000 | Selected with a higher scoring pavement project |
D2 | 65 | 60001 | US Hwy 2 | 4Th St Nw | Replace | 2027 | $4,700,000 | N/A |
D3 | 65 | 86803 | Hwy 25 | I 94 | Redeck | 2026 | $2,410,000 | N/A |
D3 | 65 | 6778 | Hwy 65 | Snake River | Replace | 2022 | $2,675,000 | N/A |
D3 | 65 | 73805 | I 94 WB | Sauk River | Redeck | 2026 | $900,000 | Tie to 6896 |
D3 | 65 | 86807 | Hwy 24 | I 94 | Replace | 2027 | $5,000,000 | N/A |
D4 | 65 | 9027 | Hwy 29 | Chippewa River | Replace | 2023 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
D4 | 65 | 9313 | US Hwy 75 | Rabbit River | Replace | 2023 | $2,100,000 | N/A |
D6 | 65 | 24837 | I 90 WB | IM Railroad | Redeck | 2025 | $700,000 | N/A |
D6 | 65 | 50804 | US Hwy 218 NB | I 90 | Replace | 2022 | $2,250,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50803. |
D6 | 65 | 55026 | US Hwy 52 SB | 36th Ave SE | Redeck | Not Selected | $690,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 6868 | I 90 WB | Cedar River | Replace | 2025 | $3,200,000 | N/A |
D6 | 65 | 6869 | I 90 EB | Cedar River | Replace | 2025 | $3,200,000 | Austin, Prog'd replacement in 2023, over the Cedar River (also 6868) |
D6 | 65 | 9046 | US Hwy 61 SB | Burns Creek | Replace | Not Selected | $1,920,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9062 | US Hwy 61 NB | Cedar Creek | Replace | Not Selected | $1,840,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9063 | US Hwy 61 SB | Cedar Creek | Replace | Not Selected | $1,870,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9093 | US Hwy 61 SB | Pleasant Valley Creek | Replace | Not Selected | $2,030,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 65 | 9728 | I 90 EB | Freeborn County Road 46 | Replace | Not Selected | $2,800,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D7 | 65 | 17001 | Hwy 60 | Des Moines River | Replace | 2025 | $5,100,000 | N/A |
D7 | 65 | 07018 | US Hwy 14 EB | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Working to coordinate with Roadway Pavement project |
D7 | 65 | 07017 | US Hwy 14 WB | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Working to coordinate with Roadway Pavement project |
D7 | 65 | 53819 | I 90 WB | Hwy 60 | Replace | Not Selected | $7,000,000 | N/A |
D7 | 65 | 53820 | I 90 EB | Hwy 60 | Replace | Not Selected | $7,200,000 | N/A |
D8 | 65 | 42007 | Hwy 23 | Three Mile Creek | Redeck | 2031 | $670,000 | N/A |
DM | 65 | 9276 | Hwy 36 | Cleveland Avenue | Replace | 2031 | $2,500,000 | N/A |
DM | 65 | 9277 | Hwy 36 | Cleveland Avenue | Replace | 2031 | $3,100,000 | N/A |
DM | 65 | 9417 | Hwy 65 NB | Coon Creek | Replace | 2024 | $1,200,000 | N/A |
DM | 65 | 9534 | I 35E | Shepard Rd | Replace | 2026 | $2,700,000 | N/A |
DM | 65 | 9713 | US Hwy 169 | US Hwy 10 | Replace | 2022 | $3,700,000 | N/A |
DM | 65 | 19819 | Hwy 55 | I 35E | Redeck | 2022 | $7,800,000 | N/A |
DM | 65 | 19859 | MN77 | I 35E | Redeck | Not Selected | $4,700,000 | N/A |
DM | 65 | 19860 | MN77 | I 35E | Redeck | Not Selected | $3,900,000 | N/A |
DM | 65 | 27022 | Hwy 62 EB | MN77 | Replace | Not Selected | $3,100,000 | N/A |
DM | 65 | 27033 | Hwy 7 | US Hwy 169 | Redeck | 2026 | $3,500,000 | N/A |
DM | 65 | 27169 | Hwy 55 | Hwy 5 | Replace | Not Selected | $2,200,000 | N/A |
DM | 65 | 27521 | Hwy 62 | 28th Ave S | Replace | Not Selected | $2,900,000 | N/A |
DM | 65 | 27540 | US Hwy 169 | 13th Ave N | Replace | Not Selected | $2,700,000 | N/A |
DM | 65 | 27572 | Hwy 62 | Nine Mile Creek | Redeck | Not Selected | $1,000,000 | N/A |
DM | 65 | 27573 | Hwy 62 | Nine Mile Creek | Redeck | Not Selected | $1,000,000 | N/A |
DM | 65 | 27785 | Hwy 55 | I 94 | Redeck | Not Selected | $3,500,000 | N/A |
DM | 65 | 27849 | Hwy 55 | I 35W | Redeck | 2022 | $500,000 | N/A |
DM | 65 | 27875 | Hwy 55 WB | I 35W | Redeck | 2022 | $600,000 | N/A |
DM | 65 | 27899 | I 35W | MC Railyard | Replace | Not Selected | $8,900,000 | N/A |
DM | 65 | 62029 | Hwy 36 | Fairview Avenue | Replace | 2031 | $2,900,000 | N/A |
DM | 65 | 62808 | I94 | MN280 | Replace | Not Selected | $4,300,000 | N/A |
DM | 65 | 62812 | I94 | MN280 | Replace | Not Selected | $3,000,000 | N/A |
DM | 65 | 62870 | US Hwy 61 NB | US Hwy 61 SB on ramp | Replace | Not Selected | $1,900,000 | N/A |
DM | 65 | 82859 | I 494 EB | US Hwy 61 | Reoverlay deck surface | Not Selected | $1,300,000 | N/A |
D1 | 60 | 69019 | US Hwy 53 NB | Paleface River | Replace | Not Selected | $1,200,000 | N/A |
D1 | 60 | 69103 | US Hwy 2 | East Savanna River | Reoverlay deck surface | Not Selected | $200,000 | N/A |
D1 | 60 | 69860 | Hwy 61 | Near Lakewalk trail, north of 26th Ave E | Overlay deck surface | Not Selected | $100,000 | N/A |
D1 | 60 | 58006 | Hwy 23 | SCV Railroad | Overlay deck surface | Not Selected | $300,000 | N/A |
D6 | 60 | 28017 | US Hwy 61 WB | Mississippi River | Overlay deck surface | Not Selected | $290,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D6 | 60 | 85017 | TH 43 | West Burns Valley Creek | Overlay deck surface | Not Selected | $120,000 | Candidate for future deck overlay project, cost is greater than total available budget. |
D7 | 60 | 83021 | Hwy 15 | Hwy 6 | Overlay deck surface | 2022 | $600,000 | N/A |
D7 | 60 | 53818 | I 90 EB | Hwy 59 | Overlay deck surface | 2026 | $300,000 | N/A |
D7 | 60 | 53816 | I 90 EB | Rowe Ave | Overlay deck surface | 2026 | $400,000 | N/A |
D7 | 60 | 07022 | US Hwy 14 EB | DME railroad | Reoverlay deck surface | 2026 | $400,000 | N/A |
D8 | 60 | 34023 | US Hwy 12 | BNSF Railroad | Overlay deck surface | 2031 | $330,000 | N/A |
DM | 60 | 02041 | Hwy 610 | Hwy 47 | Reoverlay deck surface | Not Selected | $500,000 | N/A |
DM | 60 | 9110 | Hwy 55 | US Hwy 52 NB | Replace | 2031 | $3,100,000 | Superstructure in poor condition |
DM | 60 | 27072 | Hwy 47 | BNSF Railroad | Reoverlay deck surface | Not Selected | $1,800,000 | N/A |
DM | 60 | 27178 | Hwy 55 EB | Cedar Ave | Replace | Not Selected | $3,600,000 | N/A |
DM | 60 | 27234 | Hwy 610 | US Hwy 169 | Reoverlay deck surface | Not Selected | $400,000 | N/A |
DM | 60 | 27256 | Hwy 55 | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | N/A |
DM | 60 | 27258 | Hwy 100 | UP Railroad | Reoverlay deck surface | Not Selected | $900,000 | N/A |
DM | 60 | 82860 | I 494 | US61 | Reoverlay deck surface | Not Selected | $1,100,000 | N/A |
DM | 60 | 27V02 | US Hwy 169 | I 94 | Reoverlay deck surface | Not Selected | $400,000 | N/A |
D4 | 55 | 26801 | Grant County Road 4 | I 94 | Replace | Not Selected | $3,100,000 | SP 2680-44 will be scoped for potential bridge work in FY 2026 |
D8 | 55 | 5939 | Hwy 15 | North Fork Crow River | Replace | 2031 | $1,750,000 | Replace due to scour |
D8 | 55 | 59002 | Hwy 23 | Judicial Ditch #1 | Superstructure repairs | 2024 | $520,000 | Repairs coordinated with roadway project |
D8 | 55 | 42006 | Hwy 23 | Redwood River | Redeck | 2031 | $540,000 | N/A |
DM | 55 | 9780 | Hwy 13 | I 35W | Replace | 2025 | $3,200,000 | low vertical clearance - bridge hits |
D3 | 50 | 48012 | US Hwy 169 NB | Rum River | Overlay deck surface | 2025 | $700,000 | Tie to 4811 with a score of 50 |
D4 | 45 | 21819 | Douglas County Road 17 | I 94 | Replace | 2024 | $1,900,000 | Coordinated with pavement project |
D6 | 45 | 24807 | I 90 WB | I 35 | Replace | Not Selected | $2,890,000 | N/A |
D6 | 45 | 50803 | US Hwy 218 SB | I 90 | Replace | 2023 | $2,800,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50804. |
D6 | 45 | 66811 | I 35 SB | Hwy 60 | Replace | 2023 | $4,600,000 | N/A |
D6 | 45 | 9045 | US Hwy 61 NB | Burns Creek | Replace | Not Selected | $1,920,000 | N/A |
D7 | 45 | 07037 | US Hwy 169 | Blue Earth River | Replace | Not Selected | $3,000,000 | N/A |
DM | 45 | 02010 | US Hwy 10 | Main St | Replace | 2022 | $4,000,000 | N/A |
DM | 45 | 6804 | US Hwy 169 | Hwy 21 | Replace | Not Selected | $3,800,000 | Received new overlay 2015 |
DM | 45 | 9108 | US Hwy 52 | UP Railroad | Replace | Not Selected | $1,900,000 | N/A |
DM | 45 | 9538 | Hwy 110 EB | I 35E | Replace | Not Selected | $3,300,000 | N/A |
DM | 45 | 9569 | Hwy 36 | I 35W | Replace | 2031 | $9,000,000 | N/A |
DM | 45 | 9675 | US Hwy 52 | Vermillion River | Replace | 2023 | $2,100,000 | (2020) Crack sealing project, no major work types taking place in FY 23 |
DM | 45 | 9716 | US Hwy 10 | 7th Avenue | Replace | 2022 | $3,000,000 | (2020) Misc repairs, flood seal, reseal poured joints in 2022 |
DM | 45 | 9779 | Hwy 13 | I 35W | Replace | 2025 | $3,200,000 | low vertical clearance - bridge hits |
DM | 45 | 19807 | I 35 | Dakota County Road 50 | Replace | Not Selected | $2,000,000 | N/A |
DM | 45 | 19808 | I 35 NB | Dakota County Road 51 | Replace | Not Selected | $2,000,000 | N/A |
DM | 45 | 27021 | Hwy 62 | Hwy 77 | Replace | Not Selected | $3,100,000 | N/A |
DM | 45 | 27078 | Hwy 62 | US Hwy 212 | Replace | Not Selected | $4,300,000 | N/A |
DM | 45 | 27531 | US Hwy 169 | Minnetonka Blvd | Replace | Not Selected | $3,900,000 | N/A |
DM | 45 | 27848 | I 94 | I 35W | Replace | Not Selected | $7,500,000 | N/A |
DM | 45 | 27926 | I 694 | Shingle Creek | Replace | Not Selected | $1,300,000 | N/A |
DM | 45 | 62030 | Hwy 36 | Fairview Avenue | Replace | 2031 | $3,500,000 | N/A |
DM | 45 | 62844 | Hwy 280 | Hwy 280 NB on ramp | Replace | Not Selected | $3,000,000 | (2020) Joints and crack sealing in FY 26 project. |
DM | 45 | 82813 | I 694 SB | Hwy 36 | Replace | Not Selected | $2,400,000 | N/A |
DM | 45 | 82814 | I 694 NB | Hwy 36 | Replace | Not Selected | $2,500,000 | N/A |
D1 | 40 | 69879 | I 35 NB | CP Railroad | Replace | Not Selected | $38,000,000 | N/A |
D3 | 40 | 48015 | US Hwy 169 SB | Mille Lacs County Road 29 | Overlay deck surface | 2025 | $700,000 | tie to 48016 |
D3 | 40 | 6870 | I 94 EB | Sauk River | Overlay deck surface | 2027 | $700,000 | Downscope to overlay in 2027 tie to 73811 with a score of 40 |
DM | 36 | 9321 | I 694 | Mississippi River | Overlay deck surface | Not Selected | $3,300,000 | N/A |
D1 | 35 | 69009 | US Hwy 53 SB | 6th Ave W | Replace | Not Selected | $1,600,000 | N/A |
D6 | 35 | 24839 | I 90 WB | Freeborn County Road 12 | Redeck | 2025 | $800,000 | N/A |
D6 | 35 | 79009 | US Hwy 61 SB | Zumbro River | Preventive maintenance | 2022 | $250,000 | N/A |
D7 | 35 | 83015 | Hwy 15 SB | Wantonwan County Road 9 | Redeck | 2023 | $800,000 | N/A |
DM | 35 | 6850 | I 494 WB | I 35W | Replace | Not Selected | $3,800,000 | (2019) changed to first time period since included in CoC project |
D1 | 30 | 69818N | I 35 NB | MN194 | Reoverlay deck surface | 2024 | $100,000 | Received FY 2024 COVID relief funding, mill and overlay with 69818S |
D3 | 30 | 73809 | I 94 WB | Sauk River | Redeck | 2026 | $900,000 | Downscope Redeck tie to 6897 |
D3 | 30 | 05003 | Hwy 15 EB | US Hwy 10 | Redeck/beams/bearings | 2027 | $1,860,000 | Redeck with new beams and bearings in 2027 |
D3 | 30 | 71002 | US Hwy 169 NB | US Hwy 10 | Replace | 2022 | $3,100,000 | N/A |
D3 | 30 | 73811 | I 94 WB | Sauk River | Redeck | 2027 | $1,000,000 | Downscope to Redeck in 2027 tie to 6780 |
D3 | 30 | 73868 | I 94 WB | Stearns County Road 75 | Overlay deck surface | 2023 | $600,000 | N/A |
D3 | 30 | 48009 | US169 | Mille Lacs County Road 31 | Overlay deck surface | 2025 | $700,000 | tie to 48010 |
D4 | 30 | 6686 | Hwy 9 | Mustinka River | Replace | 2022 | $700,000 | Selected prior to policy (in 2019-2022 STIP) |
D6 | 30 | 79002 | US Hwy 61 NB | Whitewater River | Redeck | 2022 | $390,000 | N/A |
D6 | 30 | 9092 | US Hwy 61 NB | Pleasant Valley Creek | Replace | Not Selected | $2,030,000 | N/A |
D7 | 30 | 07010 | US Hwy 14 EB | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | N/A |
DM | 30 | 6817 | MN65 | Coon Creek | Replace | 2024 | $800,000 | scope for 2020 |
DM | 30 | 9500 | MN100 | MN62 | Replace | Not Selected | $8,200,000 | N/A |
D1 | 20 | 69879A | I 35 SB | CP Railroad | Replace | Not Selected | $37,400,000 | N/A |
D1 | 20 | 9189 | I 35 NB | Hwy 210 | Replace | Not Selected | $2,800,000 | N/A |
D1 | 20 | 38008 | Hwy 61 | Crow Creek | Redeck | Not Selected | $2,500,000 | N/A |
D1 | 20 | 09803 | I 35 SB | BNSF Railroad | Replace | Not Selected | $2,300,000 | N/A |
D1 | 20 | 69852 | I 35 | Over Superior Hiking Trail | Replace | Not Selected | $8,700,000 | N/A |
D4 | 20 | 84001 | Hwy 55 | Bois De Sioux River | Replace | 2022 | $1,330,000 | Coordinated with pavement project; end post only |
D6 | 20 | 24815 | I 90 WB | East of 225th St near Manchester Township | Reoverlay deck surface | 2025 | $320,000 | N/A |
D6 | 20 | 24816 | I 90 EB | East of 225th St near Manchester Township | Reoverlay deck surface | Not Selected | $760,000 | N/A |
D6 | 20 | 55025 | US Hwy 52 NB | 36th Ave SE | Redeck | Not Selected | $690,000 | Candidate for future re-deck project, cost is greater than available budget. |
D6 | 20 | 55809 | I 90 WB | Hwy 52 | Replace | 2024 | $4,500,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
D6 | 20 | 55810 | I 90 EB | Hwy 52 | Replace | 2024 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
D6 | 20 | 6482 | US Hwy 61 | West of Withers Harbor Rd in RedWing | Replace | 2023 | $2,000,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 6483. |
D6 | 20 | 85815 | I 90 WB | Winona County Rd 101 | Replace | Not Selected | $1,540,000 | Candidate for future replacement project, cost is greater than total available budget. Deck overlayed in 2019 |
D6 | 20 | 85817 | I 90 WB | Hwy 74 | Replace | Not Selected | $2,620,000 | Candidate for future replacement project, cost is greater than total available budget. Deck overlayed in 2019 |
D7 | 20 | 07009 | US Hwy 14 WB | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | N/A |
D8 | 20 | 43008 | US Hwy 212 EB | Buffalo Creek | Replace | 2031 | $1,710,000 | N/A |
DM | 20 | 27171 | MN55 | Bloomington Rd | Replace | Not Selected | $1,500,000 | N/A |
DM | 20 | 27587 | US Hwy 169 | 2nd St NE | Reoverlay deck surface | Not Selected | $500,000 | N/A |
DM | 20 | 27765 | I 494 | 34th Ave S | Redeck | Not Selected | $4,000,000 | N/A |
DM | 20 | 82001 | US Hwy 8 | 2nd St NW | Replace | Not Selected | $4,500,000 | N/A |
DM | 20 | 82002 | US Hwy 8 | US61 | Replace | Not Selected | $5,300,000 | N/A |
D1 | 15 | 69808 | I 535 | BNSF Railroad | Redeck | 2028 | $7,300,000 | Removed from TPI project, Planned with Blatnik bridge replacement |
D1 | 10 | 69801G | I 535 | Superior St | Replace | 2027 | $5,900,000 | Temporary connection to Twin Ports Interchange, replace with 69802 bridges |
D1 | 10 | 69870B | I 35 N | North of Harbor Dr | Reoverlay deck surface | 2031 | $500,000 | To coordinate with the timing of another MnDOT project, 69870 redeck |
D1 | 10 | 09801 | Hwy 33 NB | I 35 | Replace | Not Selected | $4,100,000 | N/A |
D4 | 10 | 26803 | Grant County Road 19 | I 94 | Overlay deck surface | Not Selected | $400,000 | SP 2680-44 will be scoped for potential bridge work in FY 2026 |
D6 | 10 | 25008 | US Hwy 61 | Wells Creek | Overlay deck surface | 2023 | $250,000 | N/A |
D6 | 10 | 66809 | I 35 SB | Rice County Rd 93 | Replace | 2023 | $2,500,000 | N/A |
D6 | 10 | 66810 | I 35 NB | Rice County Rd 94 | Replace | 2023 | $2,500,000 | N/A |
D6 | 10 | 66815 | I 35 SB | Rice County Rd 11 | Replace | 2023 | $2,200,000 | N/A |
D6 | 10 | 66816 | I 35 NB | Rice County Rd 12 | Replace | 2023 | $2,200,000 | N/A |
D6 | 10 | 79004 | US Hwy 61 SB | Snake Creek; Township Rd | Preventive maintenance | 2022 | $300,000 | N/A |
D6 | 10 | 85830 | I 90 EB | Hwy 76 | Reoverlay deck surface | Not Selected | $300,000 | N/A |
D6 | 10 | 85842 | I 90 EB | Winona County Rd 17 | Reoverlay deck surface | Not Selected | $280,000 | N/A |
D6 | 10 | 85843 | I 90 WB | Winona County Rd 7 | Replace | Not Selected | $1,590,000 | N/A |
D6 | 10 | 85846 | I 90 EB | Winona County Rd 25 | Reoverlay deck surface | Not Selected | $260,000 | N/A |
D6 | 10 | 9858 | I 90 EB | Root River | Overlay deck surface | 2023 | $410,000 | N/A |
D7 | 10 | 52012 | US Hwy 169 | US Hwy 169 | Reoverlay deck surface | 2027 | $500,000 | N/A |
D7 | 10 | 32003 | Hwy 60 EB | Jack Creek | Overlay deck surface | 2029 | $300,000 | N/A |
D7 | 10 | 53002 | US Hwy 59 | North Branch Jack Creek | Overlay deck surface | 2029 | $100,000 | N/A |
D7 | 10 | 53001 | US Hwy 59 | Jack Creek | Overlay deck surface | 2029 | $100,000 | N/A |
D7 | 10 | 07023 | US Hwy 14 | US Hwy 169 | Replace | Not Selected | $9,200,000 | N/A |
D7 | 10 | 07020 | US Hwy 14 EB | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | N/A |
D8 | 10 | 43005 | US Hwy 212 WB | Buffalo Creek | Replace | 2031 | $1,710,000 | N/A |
DM | 10 | 6566 | US Hwy 8 | St Croix River | Replace | Not Selected | $6,500,000 | N/A |
DM | 10 | 6894 | Hwy 280 | Energy Park Drive | Overlay deck surface | 2026 | $1,100,000 | N/A |
DM | 10 | 9050 | Hwy 280 | Como Ave | Replace | Not Selected | $3,700,000 | N/A |
DM | 10 | 9352 | I 35W | BNSF Railroad | Replace | Not Selected | $3,500,000 | N/A |
DM | 10 | 9605 | US Hwy 10 | I-35W | Replace | Not Selected | $4,700,000 | N/A |
DM | 10 | 10021 | US Hwy 212 | Carver County Road 36 | Overlay deck surface | Not Selected | $700,000 | (2019) mill and overlay, joints, roadway CPR work let in FY23 |
DM | 10 | 19847 | I 35 | Lake Marion | Reoverlay deck surface | Not Selected | $100,000 | N/A |
DM | 10 | 19848 | I 35 | Lake Marion | Reoverlay deck surface | Not Selected | $100,000 | N/A |
DM | 10 | 27923 | I 94 | Brooklyn Blvd | Replace | Not Selected | $3,600,000 | N/A |
DM | 10 | 62847 | I 94 | Fairview Avenue | Replace | Not Selected | $5,500,000 | 2013 novachip, 2020-22 replace |
DM | 10 | 82809 | I 694 | 50th St N | Replace | Not Selected | $1,500,000 | N/A |
DM | 10 | 82811 | I 694 | Gateway Trail | Replace | Not Selected | $1,600,000 | N/A |
DM | 10 | 82855 | I 494 | Mississippi River | Reoverlay deck surface | 2024 | $3,200,000 | Replace failing epoxy chip seal |
DM | 10 | 02037E | US Hwy 10 | University Ave; Hwy 610 | Reoverlay deck surface | Not Selected | $900,000 | N/A |
DM | 10 | 02037W | US Hwy 10 WB | University Ave; Hwy 610 | Reoverlay deck surface | Not Selected | $1,000,000 | N/A |
D1 | 0 | 69810 | I 535 | BNSF Railroad | Redeck | 2028 | $2,000,000 | Removed from TPI project, Planned with Blatnik bridge replacement |
D1 | 0 | 69010 | US Hwy 53 NB | 6th Ave W | Replace | Not Selected | $1,600,000 | N/A |
D1 | 0 | 31009 | US Hwy 169 SB | BNSF Railroad Spur | Redeck | Not Selected | $700,000 | N/A |
D1 | 0 | 09804 | I 35 NB | BNSF Railroad | Replace | Not Selected | $2,300,000 | N/A |
D1 | 0 | 9188 | I 35 SB | Hwy 210 | Replace | Not Selected | $2,800,000 | N/A |
D1 | 0 | 31010 | US Hwy 169 NB | BNSF Railroad Spur | Redeck | Not Selected | $700,000 | N/A |
D2 | 0 | 68001 | Hwy 11 | Hay Creek | Replace | Not Selected | $1,600,000 | Not a district priority, will continue to monitor bridge condition |
D2 | 0 | 15001 | US2 | Clearwater River | Redeck | 2024 | $400,000 | Ongoing maintenance concerns |
D3 | 0 | 01004 | US Hwy 169 | Mississippi River | Preventive maintenance | 2022 | $227,766 | End posts , Approaches and joints |
D3 | 0 | 01006 | Hwy 210 | Rice River | Preventive maintenance | 2022 | $246,092 | End posts , Approaches and joints |
D4 | 0 | 21821 | Hwy 27 | I 94 | Replace | 2024 | $3,300,000 | N/A |
D4 | 0 | 3006 | Hwy 87 | US Hwy 10 | Redeck | 2022 | $1,300,000 | Selected prior to policy (in 2019-2022 STIP) |
D4 | 0 | 26802 | Hwy 78 | I 94 | Preventive maintenance | Not Selected | $300,000 | Guardrail work with SP 2680-44) |
D6 | 0 | 20001 | US Hwy 14 WB | Hwy 57 | Redeck | 2025 | $660,000 | N/A |
D6 | 0 | 20002 | US Hwy 14 EB | Hwy 57 | Redeck | 2025 | $660,000 | N/A |
D6 | 0 | 55815 | I 90 WB | Olmsted County Road 10 | Replace | Not Selected | $2,110,000 | Candidate for future replacement project, cost is greater than total available budget. |
D6 | 0 | 55816 | I 90 EB | Olmsted County Road 10 | Replace | Not Selected | $2,110,000 | N/A |
D6 | 0 | 66812 | I 35 NB | Hwy 60 | Replace | 2023 | $4,600,000 | N/A |
D6 | 0 | 66813 | I 35 SB | Cannon River | Replace | 2023 | $2,000,000 | N/A |
D6 | 0 | 66814 | I 35 NB | Cannon River | Replace | 2023 | $2,000,000 | N/A |
D6 | 0 | 66817 | I 35 SB | Hwy 21 | Replace | 2023 | $3,800,000 | N/A |
D6 | 0 | 66818 | I 35 NB | Hwy 21 | Replace | 2023 | $2,800,000 | N/A |
D6 | 0 | 79001 | US Hwy 61 SB | Whitewater River | Replace | 2022 | $5,000,000 | N/A |
D6 | 0 | 79003 | US Hwy 61 SB | E Indian Creek | Preventive maintenance | 2022 | $190,000 | N/A |
D6 | 0 | 79010 | US Hwy 61 NB | Zumbro River | Preventive maintenance | 2022 | $250,000 | N/A |
D6 | 0 | 79016 | US Hwy 61 NB | Snake Creek | Preventive maintenance | 2022 | $130,000 | N/A |
D6 | 0 | 9449 | US Hwy 61 | E 5Th St | Replace | Not Selected | $3,330,000 | N/A |
D7 | 0 | 83017 | Hwy 15 SB | Watonwan River | Replace | 2023 | $3,500,000 | N/A |
D7 | 0 | 83018 | Hwy 15 NB | Watonwan River | Replace | 2023 | $3,500,000 | N/A |
D7 | 0 | 07036 | Hwy 22 | DME railroad | Overlay deck surface | 2024 | $500,000 | N/A |
D7 | 0 | 22816 | I 90 EB | Blue Earth River | Reoverlay deck surface | 2025 | $300,000 | N/A |
D7 | 0 | 22815 | I 90 WB | Blue Earth River | Reoverlay deck surface | 2025 | $300,000 | N/A |
D7 | 0 | 07026 | US Hwy 14 EB | Hwy 22 | Reoverlay deck surface | 2026 | $300,000 | N/A |
D7 | 0 | 07025 | US Hwy 14 WB | Hwy 22 | Overlay deck surface | 2026 | $300,000 | N/A |
D7 | 0 | 07021 | US Hwy 14 WB | DME railroad | Overlay deck surface | 2026 | $400,000 | N/A |
D7 | 0 | 53005 | Hwy 60 EB | DME railroad | Overlay deck surface | 2029 | $300,000 | N/A |
D7 | 0 | 32006 | Hwy 60 WB | Jack Creek | Overlay deck surface | 2029 | $100,000 | N/A |
D7 | 0 | 32004 | Hwy 60 EB | Judicial Ditch # 76 near Brewster | Overlay deck surface | 2029 | $200,000 | N/A |
D7 | 0 | 32005 | Hwy 60 WB | Judicial Ditch # 76 near Brewster | Overlay deck surface | 2029 | $200,000 | N/A |
D7 | 0 | 53006 | Hwy 60 WB | Elk Creek | Overlay deck surface | 2029 | $200,000 | N/A |
D7 | 0 | 07015 | US Hwy 14 WB | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | N/A |
D7 | 0 | 07016 | US Hwy 14 EB | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | N/A |
DM | 0 | 27982 | Hwy 100 NB | I 94 | Redeck | 2031 | $2,000,000 | Mixed bar deck, delamination over I94, joints in poor condition |
DM | 0 | 6803 | US Hwy 169 | UP RR | Replace | Not Selected | $3,400,000 | N/A |
DM | 0 | 6851 | I 494 EB | I 35W | Replace | Not Selected | $3,800,000 | (2019) changed to first time period since included in CoC project |
DM | 0 | 9081 | Hwy 77 SB | I 494 | Replace | Not Selected | $1,900,000 | N/A |
DM | 0 | 9109 | US Hwy 52 | UP Railroad | Replace | Not Selected | $1,800,000 | N/A |
DM | 0 | 9521 | I 35E | Victoria Street | Replace | Not Selected | $3,800,000 | N/A |
DM | 0 | 9893 | I 94 | Franklin Terrace | Replace | Not Selected | $5,500,000 | N/A |
DM | 0 | 10012 | Hwy 41 | Minnesota River | Preventive maintenance | 2022 | $1,200,000 | Chip seal |
DM | 0 | 27545 | Hwy 62 | Shady Oak Rd | Replace | Not Selected | $1,900,000 | N/A |
DM | 0 | 27805 | I 94 WB | Hwy 252 SB | Replace | 2024 | $2,700,000 | Coordinated with pavement project |
DM | 0 | 27906 | I494 | I-94 | Replace | Not Selected | $3,400,000 | N/A |
DM | 0 | 27907 | I 494 | I 94 | Replace | Not Selected | $3,100,000 | N/A |
DM | 0 | 62851 | I 694 | US Hwy 61 | Replace | Not Selected | $3,100,000 | N/A |
DM | 0 | 82812 | I 694 NB | Gateway Trail | Replace | Not Selected | $1,600,000 | N/A |
DM | 0 | 27V43 | I 94 | Hennepin County Road 81 | Reoverlay deck surface | 2022 | $800,000 | N/A |
DM | 0 | 27V44 | I 94 | Hennepin County Road 81 | Reoverlay deck surface | 2022 | $700,000 | N/A |
Total score | District | Bridge number | Route | Key Intersection or Closest Landmark | Work Type | Year Planned | High level cost estimate for planning purposes | Comments |
---|---|---|---|---|---|---|---|---|
97 | M | 27855 | I 94 | MN55 | Overlay deck surface | 2025 | $4,200,000 | |
90 | 7 | 07017 | US Hwy 14 Westbound | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with pavement project on the corridor |
90 | 1 | 69834 | 27th Ave West | I 35 | Replace | 2021 | $2,000,000 | Twin Ports Interchange project |
90 | 6 | 6776 | US Hwy 61 | CP Railroad | Replace | 2024 | $4,600,000 | |
90 | 7 | 07017 | US Hwy 14 Westbound | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with pavement project on the corridor |
90 | M | 27177 | Hwy 55 Eastbound | Franklin Ave | Redeck | 2022 | $2,500,000 | |
90 | M | 9700 | US Hwy 10 | Rum River | Replace | 2022 | $7,000,000 | Associated with 9700, 9713, 9714, 9715, 9716, 9717 with a high score of 90 |
90 | M | 27586 | US Hwy 169 | Excelsior Blvd | Reoverlay deck surface | 2023 | $400,000 | |
90 | M | 9217E | I 494 Eastbound | Minnesota River | Reoverlay deck surface | 2023 | $14,000,000 | |
90 | M | 9217W | I 494 Westbound | Minnesota River | Reoverlay deck surface | 2023 | $13,000,000 | |
90 | M | 27831 | I 394 | Dunwoody Blvd | Overlay deck surface | 2026 | $17,000,000 | |
87 | 3 | 71012 | Hwy 25 | Mississippi River | Overlay deck surface | 2024 | $1,400,000 | |
85 | 1 | 69802C | US Hwy 53 | 19th St | Replace | 2027 | $12,700,000 | Bridge was recently load posted |
80 | M | 9600N | Hwy 77 Northbound | Minnesota River | Reoverlay deck surface | 2021 | $3,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 9600S | Hwy 77 Southbound | Minnesota River | Reoverlay deck surface | 2021 | $3,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | 7 | 07003 | Hwy 60 | Blue Earth County Road 6 | Overlay deck surface | 2023 | $400,000 | |
80 | 7 | 07018 | US Hwy 14 Eastbound | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with pavement project on the corridor |
80 | 7 | 07019 | US Hwy 14 Westbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Waiting to coordinate with pavement project on the corridor |
80 | 7 | 52001 | US Hwy 169 Southbound | Robarts Creek | Replace | 2022 | $200,000 | |
80 | 7 | 9098 | US Hwy 169 | Minnesota River | Reoverlay deck surface | Not Selected | $4,700,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
80 | 1 | 09823 | I 35 Southbound | Carlton County Road 61 | Redeck | 2023 | $1,600,000 | |
80 | 1 | 9787 | I 35 Southbound | Grindstone River | Replace | 2024 | $1,600,000 | |
80 | 1 | 36013 | US Hwy 71 | Little Fork River | Overlay deck surface | Not Selected | $800,000 | Further analysis needed to confirm correct fix, possible substructure movement |
80 | 1 | 9493 | US Hwy 53 Southbound | Hwy 37 | Replace | 2025 | $2,000,000 | |
80 | 1 | 9494 | US Hwy 53 Northbound | Hwy 37 | Replace | 2025 | $2,000,000 | |
80 | 1 | 69840 | MN194 Northbound | Superior St | Overlay deck surface | 2026 | $800,000 | |
80 | 3 | 5060 | Hwy 210 | Mississippi River | Reoverlay deck surface | 2025 | $1,100,000 | |
80 | 4 | 5854 | US Hwy 10 Westbound | South Bridge Buffalo River | Replace | 2029 | $2,500,000 | Coordinated with pavement project |
80 | 6 | 9178 | I 90 Westbound | 6th St NE | Reoverlay deck surface | 2023 | $700,000 | |
80 | 6 | 9179 | I 90 Eastbound | 7th St NE | Reoverlay deck surface | 2023 | $900,000 | |
80 | 7 | 07003 | Hwy 60 | Blue Earth County Road 6 | Overlay deck surface | 2023 | $400,000 | |
80 | 7 | 07018 | US Hwy 14 Eastbound | N Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with pavement project on the corridor |
80 | 7 | 07019 | US Hwy 14 Westbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Waiting to coordinate with pavement project on the corridor |
80 | 7 | 52001 | US Hwy 169 Southbound | Robarts Creek | Replace | 2022 | $200,000 | |
80 | 7 | 9098 | US Hwy 169 | Minnesota River | Reoverlay deck surface | Not Selected | $4,700,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
80 | M | 27237 | Hwy 55 | BNSF & CP Railroad | Reoverlay deck surface | 2022 | $700,000 | |
80 | M | 9805 | I 94 Westbound | 12th Street East | Reoverlay deck surface | 2022 | $1,100,000 | |
80 | M | 9805A | I 35E Southbound | I 94 Westbound | Reoverlay deck surface | 2022 | $500,000 | |
80 | M | 19033 | US Hwy 52 Southbound | Vermillion River | Preventative Maintenance | 2023 | $100,000 | |
80 | M | 9263 | CSAH 10 Westbound | Hwy 65 | Reoverlay deck surface | 2023 | $800,000 | Associated with 9264 with a high score of 80 |
80 | M | 82856 | I 494 Westbound | Mississippi River | Reoverlay deck surface | 2024 | $3,900,000 | |
80 | M | 27726A | I 94 Southbound | BNSF & UP Railroad | Reoverlay deck surface | 2026 | $1,600,000 | Being scoped to include in FY26 Dunwoody Bridge Project |
80 | M | 27726B | I 94 Southbound | Lyndale Ave and UP Railroad | Reoverlay deck surface | 2026 | $2,400,000 | Being scoped to include in FY26 Dunwoody Bridge Project |
80 | M | 6805 | Hwy 280 | U of M Transitway | Overlay deck surface | 2026 | $2,600,000 | Tied to 6242-83. Pavement score 84 |
80 | M | 02024 | Hwy 610 Eastbound | East River Road | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 02815 | I 694 | Hwy 65 | Reoverlay deck surface | Not selected | $900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19075 | US Hwy 61 | Vermillion River | Reoverlay deck surface | Not selected | $500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19812 | I 35E Northbound | Dakota County Road 42 | Reoverlay deck surface | Not selected | $800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19816 | Cliff Road (CSAH 32) | I 35E | Reoverlay deck surface | Not selected | $2,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19855 | US Hwy 52 Southbound | I 494 collar roads | Reoverlay deck surface | Not selected | $1,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19856 | US Hwy 52 Northbound | I 494 collar roads | Reoverlay deck surface | Not selected | $1,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 19859 | MN77 Southbound | I 35E collar roads | Reoverlay deck surface | Not selected | $1,300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27052A | Hwy 77 Northbound, Westbound I494 | Hwy 77 on ramp | Reoverlay deck surface | Not selected | $1,200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27053 | Hwy 77 Southbound | Northbound off ramp to westbound I-494 | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27727A | I 94 Northbound | Glenwood Ave | Reoverlay deck surface | Not selected | $1,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27742 | US Hwy 169 | I 394 | Reoverlay deck surface | Not selected | $2,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27767 | I 494 | Westbound I 494 | Reoverlay deck surface | Not selected | $1,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27770F | I 394 Westbound off ramp | Penn Ave | Reoverlay deck surface | Not selected | $400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27776B | I 394R Eastbound | I 394 Downtown Ramps | Reoverlay deck surface | Not selected | $2,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 27960 | I 694 Eastbound on ramp | I 94 Eastbound | Reoverlay deck surface | Not selected | $700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 82800 | I 94 Eastbound | St Croix River | Reoverlay deck surface | Not selected | $12,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 82849 | I 94 Westbound | Hwy 95 | Reoverlay deck surface | Not selected | $900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 82850 | I 94 Eastbound | Hwy 96 | Reoverlay deck surface | Not selected | $1,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
80 | M | 9264 | Anoka County Road 10 | Hwy 65 | Reoverlay deck surface | 2023 | $500,000 | Associated with 9263 with a high score of 80 |
80 | 3 | 86803 | Hwy 25 | I-94 Off Ramp | Overlay deck surface | 2026 | $3,000,000 | |
79 | M | 27239 | Hwy 610 Westbound | Mississippi River | Reoverlay deck surface | Not selected | $2,400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
75 | 3 | 9022 | Hwy 23 Northbound | US Hwy 10 | Replace | 2023 | $1,900,000 | |
75 | 3 | 9021 | Hwy 23 Southbound | US Hwy 10 | Replace | 2023 | $18,400,000 | |
75 | 6 | 24808 | I 90 Eastbound | I 35 | Replace | Not Selected | $2,900,000 | Not a district priority. Will continue to monitor bridge performance. |
75 | 6 | 6483 | US Hwy 61 | Hay Creek | Replace | 2023 | $9,200,000 | |
75 | 8 | 34524 | Kandiyohi County Road 153 | US Hwy 12 | Reoverlay deck surface | Not selected | $1,100,000 | City of Willmar owner/responsibility. |
75 | M | 19843 | I 35 Southbound | Dakota County Road 64 | Replace | Not selected | $2,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
73 | M | 27792 | I 394 | I 94 | Replace | 2026 | $18,600,000 | |
72 | 1 | 69802 | US Hwy 53 | 1st St | Replace | 2027 | $16,900,000 | Bridge was recently load posted |
70 | 7 | 07029 | US Hwy 169 | S Riverfront Dr | Reoverlay deck surface | 2027 | $700,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
70 | 7 | 07030 | US Hwy 169 | Sibley St | Reoverlay deck surface | Not Selected | $600,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
70 | 7 | 07039 | US Hwy 169 Southbound | Blue Earth River | Reoverlay deck surface | Not Selected | $600,000 | Coordinated with pavement project |
70 | 7 | 07040 | US Hwy 169 Northbound | Blue Earth River | Reoverlay deck surface | Not Selected | $500,000 | Coordinated with pavement project |
70 | 7 | 07041 | US Hwy 169 Northbound | Off Ramp From US Hwy 169 | Reoverlay deck surface | Not Selected | $400,000 | Coordinated with pavement project |
70 | 7 | 53815 | I 90 Westbound | Rowe Ave | Overlay deck surface | 2026 | $400,000 | |
70 | 7 | 53817 | I 90 Westbound | Hwy 59 | Overlay deck surface | 2026 | $300,000 | |
70 | 7 | 67801 | I 90 Westbound | Rock County 11 | Overlay deck surface | 2021 | $100,000 | |
70 | 7 | 83016 | Hwy 15 Northbound | Watonwan County Road 9 | Overlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project on the corridor |
70 | 7 | 83022 | Hwy 15 | UP Railroad | Reoverlay deck surface | 2022 | $500,000 | |
70 | 7 | 83037 | Hwy 60 | UP Railroad | Overlay deck surface | 2028 | $300,000 | |
70 | 1 | 69817 | I 35 Northbound on ramp | I-35 Southbound off ramp | Overlay deck surface | Not Selected | $400,000 | Under consideration for addition to 2024 pavement project. |
70 | 2 | 5760 | US Hwy 2 | Mississippi River | Overlay deck surface | Not Selected | $400,000 | Coordinating Funding with another district |
70 | 2 | 68004 | Hwy 32 | South of 180th St near Greenbrush | Overlay deck surface | 2021 | $300,000 | Selected Prior to the adoption of the scoring policy (in 2019-2022 STIP) |
70 | 3 | 48011 | US Hwy 169 Southbound | W Bridge Rum River | Overlay deck surface | 2025 | $300,000 | |
70 | 3 | 71007 | US Hwy 169 Southbound | Sherburne County Road 29 | Reoverlay deck surface | 2025 | $300,000 | |
70 | 3 | 73855 | I 94 Westbound | Hwy 15 | Reoverlay deck surface | Not Selected | $900,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 73856 | I 94 Eastbound | Hwy 15 | Reoverlay deck surface | Not Selected | $600,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 49009 | US Hwy 10 | Morrison County Road 26 | Overlay deck surface | Not Selected | $900,000 | |
70 | 3 | 48016 | US Hwy 169 Northbound | Mille Lacs County Road 29 | Reoverlay deck surface | 2025 | $300,000 | |
70 | 3 | 48010 | US Hwy 169 Northbound | Mille Lacs County Road 31 | Reoverlay deck surface | 2025 | $300,000 | |
70 | 3 | 71008 | US Hwy 169 Northbound | Sherburne County Road 29 | Reoverlay deck surface | 2025 | $300,000 | |
70 | 4 | 5025 | US Hwy 59 | Pelican River | Reoverlay deck surface | 2024 | $200,000 | Coordinated with pavement project |
70 | 6 | 25014 | US Hwy 61 Northbound | Spring Creek | Reoverlay deck surface | Not Selected | $300,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 66808 | I 35 Southbound | I 35 | Reoverlay deck surface | Not Selected | $700,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 7 | 07029 | US Hwy 169 | S Riverfront Dr | Reoverlay deck surface | 2027 | $700,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
70 | 7 | 07030 | US Hwy 169 | Sibley St | Reoverlay deck surface | Not Selected | $600,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
70 | 7 | 07039 | US Hwy 169 Southbound | Blue Earth River | Reoverlay deck surface | Not Selected | $600,000 | Coordinated with pavement project |
70 | 7 | 07040 | US Hwy 169 Northbound | Blue Earth River | Reoverlay deck surface | Not Selected | $500,000 | Coordinated with pavement project |
70 | 7 | 07041 | US Hwy 169 Northbound | Off Ramp From US Hwy 169 | Reoverlay deck surface | Not Selected | $400,000 | Coordinated with pavement project |
70 | 7 | 53815 | I 90 Westbound | Rowe Ave | Overlay deck surface | 2026 | $400,000 | |
70 | 7 | 53817 | I 90 Westbound | Hwy 59 | Overlay deck surface | 2026 | $300,000 | |
70 | 7 | 67801 | I 90 Westbound | Rock County 11 | Overlay deck surface | 2021 | $100,000 | |
70 | 7 | 83016 | Hwy 15 Northbound | Watonwan County Road 9 | Overlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project on the corridor |
70 | 7 | 83022 | Hwy 15 | UP Railroad | Reoverlay deck surface | 2022 | $500,000 | |
70 | 7 | 83037 | Hwy 60 | UP Railroad | Overlay deck surface | 2028 | $300,000 | |
70 | 8 | 5133 | Hwy 19 | Redwood River | Reoverlay deck surface | 2022 | $1,300,000 | |
70 | 8 | 12000 | US Hwy 212 | Minnesota River | Overlay deck surface | 2031 | $1,100,000 | Overlay after Blatnick |
70 | M | 19827 | Hwy 55 | I 494 | Redeck | 2022 | $6,300,000 | |
70 | M | 4190 | Hwy 55 | Minnesota River | Reoverlay deck surface | 2022 | $12,000,000 | |
70 | M | 6583 | I 35W | Cliff Rd | Replace | 2025 | $6,600,000 | |
70 | M | 27068 | Hwy 7 | Cedar Lake Trail | Reoverlay deck surface | 2026 | $800,000 | |
70 | M | 02025 | Hwy 610 Westbound | BNSF Railroad | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 02026 | Hwy 610 Eastbound | BNSF Railroad | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 02027 | Hwy 610 Westbound | Coon Rapids Blvd | Reoverlay deck surface | Not selected | $500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 02028 | Hwy 610 Eastbound | Coon Rapids Blvd | Reoverlay deck surface | Not selected | $400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19023 | Hwy 55 Westbound | US Hwy 52 Southbound | Reoverlay deck surface | Not selected | $1,300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19811 | I 35E Southbound | Dakota County Road 42 | Reoverlay deck surface | Not selected | $800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19860 | Hwy 77 Northbound | I 35E collar roads | Reoverlay deck surface | Not selected | $1,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19891 | I 35W Southbound | Southcross Drive | Reoverlay deck surface | Not selected | $700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19892 | I 35W Northbound | Southcross Drive | Reoverlay deck surface | Not selected | $1,200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19893 | I 35E Southbound | Southcross Drive | Reoverlay deck surface | Not selected | $800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 19896 | I 494 | UP Railroad | Reoverlay deck surface | Not selected | $1,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27044 | Hwy 55 | Crow River | Reoverlay deck surface | Not selected | $700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27051 | Hwy 77 | American Blvd | Overlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27052C | Hwy 77 Northbound | American Blvd | Reoverlay deck surface | Not selected | $1,800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27053A | Hwy 77 Southbound on ramp | Hwy 77 Northbound off ramp to I 494 Westbound | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27070 | Hwy 77 Northbound | Hwy 77 Northbound off ramp to Westbound I-494 | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27734 | I 694 Eastbound | I 94 Westbound | Reoverlay deck surface | Not selected | $1,400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27770A | I 394 Eastbound | TCWR Railroad Yard | Reoverlay deck surface | Not selected | $800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27817 | I 94 Southbound on ramp | Southbound Off Ramp | Reoverlay deck surface | Not selected | $700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27891 | I 694 | Hwy 252 | Reoverlay deck surface | Not selected | $1,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27982 | Hwy 100 Northbound | I 94 Eastbound | Reoverlay deck surface | Not selected | $1,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 9431 | Hwy 100 | W 70th St | Reoverlay deck surface | Not selected | $1,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
70 | M | 27765 | I 494 | 34th Ave S | Reoverlay deck surface | Not selected | $800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
69 | 1 | 09009 | Hwy 33 | St. Louis River | Reoverlay deck surface | Not Selected | $2,200,000 | Deck in good condition |
67 | 4 | 14012 | US Hwy 10 | Red River Of The North | Reoverlay deck surface | Not Selected | $4,000,000 | Not a district priority; will continue to monitor bridge condition |
65 | 7 | 17001 | Hwy 60 | Des Moines River | Replace | 2025 | $5,100,000 | |
65 | 1 | 69882 | I 35 Northbound | Over fill near BNSF Railyard | Replace | 2021 | $8,700,000 | Twin Ports Interchange project |
65 | 1 | 69801N | I 535 Northbound | Duluth Cross City trail | Replace | 2021 | $1,800,000 | Twin Ports Interchange project |
65 | 1 | 5923 | US Hwy 61 | Pigeon River | Redeck | 2023 | $2,200,000 | International border bridge in coordination with Canada |
65 | 1 | 9789 | I 35 Southbound | BNSF RR | Replace | 2024 | $1,000,000 | Replace with 9788 , 9787, and 9790 |
65 | 1 | 9790 | I 35 Northbound | BNSF RR | Replace | 2024 | $2,800,000 | Replace with 9788 , 9789, and 9787 |
65 | 1 | 6602 | US Hwy 53 Northbound | St. Louis River | Replace | Not Selected | $2,200,000 | |
65 | 1 | 31012 | US Hwy 169 Northbound | BNSF Railroad | Redeck | Not Selected | $900,000 | Overlay project being considered with a rail replacement with 31012, 31011, 31010, 31009, and 69063, and 69064 |
65 | 1 | 69802A | I 535 Northbound off ramp | 21st Ave | Replace | 2027 | $2,300,000 | Bridge was recently load posted |
65 | 1 | 9030 | I 535 | St. Louis River | Replace | 2028 | $200,000,000 | |
65 | 1 | 31022S | US Hwy 169 Southbound | Near Nashwauk High School | Redeck | Not Selected | $3,900,000 | |
65 | 1 | 6501 | I 35 | DM & IR Railyard | Replace | Not Selected | $5,100,000 | |
65 | 2 | 60001 | US Hwy 2 | 4th St NW | Replace | 2027 | $4,600,000 | |
65 | 2 | 9059 | Hwy 11 | Warroad River | Redeck | 2023 | $1,000,000 | |
65 | 3 | 6778 | Hwy 65 | Snake River | Replace | 2022 | $2,500,000 | |
65 | 3 | 73805 | I 94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | |
65 | 3 | 73876 | I 94 Eastbound | BNSF Railroad | Replace | 2022 | $1,900,000 | tie to 73875 |
65 | 4 | 21815 | I 94 Westbound | CP Railroad | Redeck | 2024 | $100,000 | Coordinated with pavement project |
65 | 4 | 21816 | I 94 Eastbound | CP Railroad | Redeck | 2024 | $100,000 | Coordinated with pavement project |
65 | 4 | 4199 | US Hwy 59 | Pelican River | Replace | 2027 | $1,100,000 | Coordinated with pavement project |
65 | 4 | 9701 | US Hwy 59 | I 94 | Preventative maintenance | Not Selected | $400,000 | No project programmed |
65 | 6 | 24837 | I 90 Westbound | IM Railroad | Redeck | Not Selected | $700,000 | Not a district priority. Will continue to monitor bridge performance. |
65 | 6 | 55026 | US Hwy 52 Southbound | 36th Ave SE | Redeck | Not Selected | $700,000 | Not a district priority. Will continue to monitor bridge performance. |
65 | 6 | 6868 | I 90 Westbound | Cedar River | Replace | 2023 | $3,200,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 6869 | I 90 Eastbound | Cedar River | Replace | 2023 | $3,200,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9062 | US Hwy 61 Northbound | Cedar Creek | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9063 | US Hwy 61 Southbound | Cedar Creek | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9093 | US Hwy 61 Southbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | |
65 | 6 | 9728 | I 90 Eastbound | Freeborn County Road 46 | Replace | Not Selected | $2,800,000 | |
65 | 6 | 50504 | US218 Northbound | I-90 | Replace | 2022 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50803. |
65 | 7 | 17001 | Hwy 60 | Des Moines River | Replace | 2025 | $5,100,000 | |
65 | 8 | 42007 | Hwy 23 | Three Mile Creek | Redeck | 2031 | $700,000 | Year moved but previously selected prior to policy (in 2019-2028 CHIP) |
65 | M | 19819 | Hwy 55 | I 35E | Redeck | 2022 | $6,300,000 | |
65 | M | 27849 | Hwy 55 Eastbound | I 35W | Redeck | 2022 | $2,400,000 | |
65 | M | 27875 | Hwy 55 Westbound | I 35W | Redeck | 2022 | $3,200,000 | |
65 | M | 9713 | US Hwy 169 | US Hwy 10 | Replace | 2022 | $3,700,000 | Associated with 9700, 9713, 9714, 9715, 9716, 9717 with a high score of 90 |
65 | M | 9417 | Hwy 65 Northbound | Coon Creek | Replace | 2024 | $900,000 | Tied to 6817 |
65 | M | 27572 | Hwy 62 Eastbound | Nine Mile Creek | Redeck | 2026 | $1,000,000 | |
65 | M | 27573 | Hwy 62 Westbound | Nine Mile Creek | Redeck | 2026 | $1,000,000 | |
65 | M | 27799R | I 94 Eastbound on ramp | Lyndale Avenue Southbound | Replace | 2026 | $7,600,000 | Being scoped to include in FY26 Dunwoody Bridge Project |
65 | M | 27022 | Hwy 62 Eastbound | Hwy 77 | Replace | Not selected | $3,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27201 | Hwy 55 | Lake St | Reoverlay deck surface | Not selected | $3,700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27540 | US Hwy 169 | 13th Ave N | Replace | Not selected | $2,700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27831C | I 394 Westbound | Westbound I 94 | Replace | Not selected | $5,800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27879 | I 35W | 3rd Street | Redeck | Not selected | $3,700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27879A | I 35W Southbound collar road | 3rd Street | Redeck | Not selected | $1,200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 27899 | I 35W | MC Railyard | Replace | Not selected | $8,900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 62029 | Hwy 36 Westbound | Fairview Avenue | Replace | Not selected | $2,900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 62070 | Hwy 36 | US Hwy 61 | Replace | Not selected | $5,200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 62808 | I 94 Westbound | MN280 Northbound | Replace | Not selected | $4,300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 62812 | I 94 Westbound | Hwy 280 Southbound | Replace | Not selected | $3,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 62870 | US Hwy 61 Northbound | US Hwy 61 | Replace | Not selected | $1,900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 82859 | I 494 Eastbound | US Hwy 61 | Reoverlay deck surface | Not selected | $1,300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 9276 | Hwy 36 Westbound | Cleveland Avenue | Replace | Not selected | $2,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 9277 | Hwy 36 Eastbound | Cleveland Avenue | Replace | Not selected | $3,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
65 | M | 9534 | I 35E | Shepard Road | Replace | Not selected | $2,700,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
61 | 3 | 6319 | US71 | Stream near Sauk Center | Redeck | 2026 | $1,000,000 | |
60 | 7 | 53816 | I 90 Eastbound | Rowe Ave | Overlay deck surface | 2026 | $400,000 | |
60 | 7 | 53818 | I 90 Eastbound | Hwy 59 | Overlay deck surface | 2026 | $300,000 | |
60 | 1 | 69802D | US Hwy 53 Northbound on ramp | 19th St | Replace | 2027 | $4,500,000 | Bridge was recently load posted |
60 | 1 | 69082 | US Hwy 169 Northbound | DM & IR Railyard (Abandon) | Replace | Not Selected | $2,000,000 | Under consideration to be removed under 2024 pavement project |
60 | 1 | 69103 | US Hwy 2 | East Savannah River | Reoverlay deck surface | Not Selected | $200,000 | |
60 | 1 | 69860 | US Hwy 61 | Near Lakewalk trail, north of 26th Ave E | Overlay deck surface | Not Selected | $100,000 | |
60 | 1 | 58006 | Hwy 23 | SCV Railroad | Overlay deck surface | Not Selected | $300,000 | |
60 | 1 | 69019 | US Hwy 53 Northbound | Paleface River | Replace | Not Selected | $1,200,000 | Further analysis needed to confirm repair options |
60 | 1 | 69084 | US Hwy 169 Northbound | Hwy 73 Northbound | Replace | Not Selected | $1,700,000 | |
60 | 2 | 68006 | Hwy 11 | South Bridge Two Rivers | Reoverlay deck surface | Not Selected | $200,000 | Waiting to coordinate with another project |
60 | 2 | 5814 | Hwy 11 | Roseau River | Overlay deck surface | 2024 | $200,000 | Selected Prior to the adoption of the scoring policy (in 2019-2028 CHIP) |
60 | 6 | 28017 | US Hwy 61 Westbound | Mississippi River | Overlay deck surface | Not Selected | $300,000 | |
60 | 7 | 53816 | I 90 Eastbound | Rowe Ave | Overlay deck surface | 2026 | $400,000 | |
60 | 7 | 53818 | I 90 Eastbound | Hwy 59 | Overlay deck surface | 2026 | $300,000 | |
60 | 8 | 34023 | US Hwy 12 | BNSF Railroad | Overlay deck surface | 2031 | $400,000 | |
60 | M | 02046 | US Hwy 10 Eastbound | Hwy 65 | Reoverlay deck surface | 2021 | $100,000 | Selected prior to policy (in 2019-2022 STIP) |
60 | M | 10022 | US Hwy 212 Eastbound | Carver County Road 36 | Overlay deck surface | 2023 | $700,000 | Selected prior to policy (in 2019-2022 STIP) |
60 | M | 02041 | Hwy 610 Westbound | Hwy 47 | Reoverlay deck surface | Not selected | $500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 19047 | US Hwy 52 Northbound | Concord Blvd | Overlay deck surface | Not selected | $500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27072 | Hwy 47 | BNSF Railroad | Reoverlay deck surface | Not selected | $1,800,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27178 | Hwy 55 Eastbound | Cedar Ave | Replace | Not selected | $3,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27234 | Hwy 610 Eastbound | US Hwy 169 | Reoverlay deck surface | Not selected | $400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27256 | Hwy 55 Eastbound | UP Railroad | Reoverlay deck surface | Not selected | $400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27258 | Hwy 100 | UP Railroad | Reoverlay deck surface | Not selected | $900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27265 | Hwy 100 Northbound | UP Railroad | Reoverlay deck surface | Not selected | $200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27798 | I 394 Westbound | I 94 | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27890 | I 694 Westbound | Hwy 252 Southbound Ramp | Reoverlay deck surface | Not selected | $300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27909 | I 94 Eastbound | Shingle Creek | Replace | Not selected | $1,900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27926 | I 694 Eastbound | Shingle Creek | Replace | Not selected | $1,200,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 27V02 | US Hwy 169 Northbound | I 94 | Reoverlay deck surface | Not selected | $400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 82034A | I 494 Westbound | BNSF Railroad | Reoverlay deck surface | Not selected | $1,600,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 82037 | I-494 | BN & CP Railroads | Reoverlay deck surface | Not selected | $1,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
60 | M | 82860 | I 494 Westbound | US Hwy 61 | Reoverlay deck surface | Not selected | $1,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
55 | 1 | 9788 | I 35 Northbound | Grindstone River | Replace | 2024 | $1,600,000 | Replace with 9787, 9789, and 9790 |
55 | 1 | 69879E | I 35 Northbound off ramp | 57th Ave West | Replace | Not Selected | $3,100,000 | |
55 | 1 | 69018 | US Hwy 53 Northbound | Whiteface River | Replace | Not Selected | $2,000,000 | |
55 | 8 | 5939 | Hwy 15 | North Fork Crow River | Replace | 2031 | $1,800,000 | Replace due to scour issues |
55 | 8 | 59002 | Hwy 23 | Judicial Ditch #1 | Superstructure repairs | 2024 | $600,000 | Repairs coordinated with roadway project |
55 | 8 | 42006 | Hwy 23 | Redwood River | Redeck | 2031 | $600,000 | Year moved but previously selected prior to policy (in 2019-2028 CHIP) |
55 | M | 7264 | Hwy 62 Westbound | Valley View Rd | Replace | 2026 | $1,800,000 | With pavement project |
55 | M | 9893 | I 94 | Franklin Terrace | Replace | Not selected | $5,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
55 | M | 9715 | Anoka County Road 10 | Hwy 65 | Replace | 2022 | $2,000,000 | |
55 | M | 9714 | Anoka County Road 10 | Hwy 65 | Replace | 2022 | $2,000,000 | |
45 | 1 | 69825 | I 535 Northbound off ramp | BNSF Railroad | Replace | 2021 | $5,900,000 | Twin Ports Interchange project |
45 | 1 | 69801F | I 535 Southbound | I 35 | Replace | 2021 | $5,600,000 | Twin Ports Interchange project |
45 | 1 | 69801J | I 535 Northbound | I 35 | Replace | 2021 | $3,300,000 | Twin Ports Interchange project |
45 | 1 | 69879D | I 35 Southbound | 57th Ave West | Replace | Not Selected | $3,000,000 | |
45 | 1 | 31022N | US Hwy 169 Northbound | Near Nashwauk Highschool | Redeck | Not Selected | $3,500,000 | |
45 | 2 | 39006 | Hwy 11 | Winter Road River | Replace | Not Selected | $1,700,000 | Waiting to coordinate with another project |
45 | 4 | 84002 | Hwy 210 | Red River of the North | Redeck | Not Selected | $1,700,000 | North Dakota to lead future project |
45 | 6 | 50803 | US Hwy 218 Southbound | I 90 | Replace | 2022 | $2,500,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 50804. |
45 | 6 | 66811 | I 35 Southbound | Hwy 60 | Replace | Not Selected | $4,600,000 | |
45 | M | 9675 | US Hwy 52 Northbound | Vermillion River | Preventative Maintenance | 2023 | $300,000 | Selected prior to policy in 2019-2028 CHIP) |
45 | M | 9779 | Hwy 13 Southbound | I 35W | Replace | 2025 | $3,200,000 | Replace due to vertical clearance issue |
45 | M | 9780 | Hwy 13 Northbound | I 35W | Replace | 2025 | $3,200,000 | Replace due to vertical clearance issue |
45 | M | 02010 | US Hwy 10 | Main St | Replace | Not selected | $4,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 19807 | I 35 Southbound | Dakota County Road 50 | Replace | Not selected | $2,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 19808 | I 35 Northbound | Dakota County Road 51 | Replace | Not selected | $2,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27021 | Hwy 62 Westbound | Hwy 77 | Replace | Not selected | $3,100,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27078 | Hwy 62 Eastbound | Hwy 212 | Replace | Not selected | $4,300,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27531 | US Hwy 169 | Minnetonka Blvd | Replace | Not selected | $3,900,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27793 | I 94 Northbound | I 94 | Replace | Not selected | $3,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27831A | I 394 Westbound on ramp | Dunwoody Blvd | Replace | Not selected | $1,400,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27831D | I 394 Eastbound | I 94 | Replace | Not selected | $6,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27848 | I 94 Westbound | I 35W | Replace | Not selected | $7,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 27850 | I 94 Westbound | I 35W | Replace | Not selected | $4,000,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 62030 | Hwy 36 Eastbound | Fairview Avenue | Replace | Not selected | $3,500,000 | FY28-30 SPP funds dedicated to Blatnik Bridge |
45 | M | 62844 | Hwy 280 Northbound | MN280 Southbound | Replace | 2026 | $3,000,000 | Tied to 6242-83. Pavement score 83 |
45 | M | 6804 | US Hwy 169 | Hwy 21 | Replace | Not selected | $3,800,000 | |
45 | M | 9108 | US Hwy 52 Northbound | UP Railroad | Replace | Not selected | $1,900,000 | |
45 | M | 9110 | Hwy 55 Eastbound | US Hwy 52 Northbound | Replace | Not selected | $3,100,000 | |
45 | M | 9538 | Hwy 110 Eastbound | I 35E | Replace | Not selected | $3,300,000 | |
45 | M | 9569 | Hwy 36 Westbound | I 35W | Replace | Not selected | $5,300,000 | |
45 | M | 9716 | US Hwy 10 | 7th Avenue | Replace | 2022 | $3,000,000 | Associated with 9700, 9713, 9714, 9715, 9716, 9717 with a high score of 90 |
45 | M | 9717 | US Hwy 10 | BNSF Railroad | Replace | 2022 | $7,400,000 | Associated with 9700, 9713, 9714, 9715, 9716, 9717 with a high score of 90 |
40 | 1 | 69879 | I 35 Northbound | CP Railroad | Replace | Not Selected | $38,000,000 | |
40 | 3 | 73868 | I-94 | Stearns County Road 75 | Overlay deck surface | 2023 | $1,500,000 | |
35 | 1 | 69802E | US Hwy 53 Southbound | Over fill near BNSF Railyard | Replace | 2027 | $1,700,000 | Bridge was recently load posted |
35 | 6 | 24839 | I 90 Westbound | Freeborn County Road 12 | Redeck | Not Selected | $800,000 | |
35 | 6 | 79009 | US Hwy 61 Southbound | Zumbro River | Preventative maintenance | Not Selected | $200,000 | |
35 | 6 | 85839 | Hwy 43 Southbound | I 90 | Preventative maintenance | Not Selected | $200,000 | |
35 | M | 6850 | I 494 Westbound | I 35W | Replace | Not selected | $3,800,000 | Being considered in Corridors of Commerce project - not yet funded |
30 | 7 | 07010 | US Hwy 14 Eastbound | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
30 | 1 | 69030 | US Hwy 53 Northbound | Cloquet River | Replace | Not Selected | $3,400,000 | |
30 | 1 | 69818N | I 35 Northbound | MN194 Northbound | Reoverlay deck surface | Not Selected | $3,200,000 | |
30 | 1 | 69818S | I 35 Southbound | MN194 Southbound | Reoverlay deck surface | Not Selected | $3,200,000 | |
30 | 1 | 9030 | I 535 | St. Louis River | Rehabilitation | 2022 | $9,100,000 | Selected prior to policy (in 2019-2022 STIP); Replacement planned for 2028 |
30 | 3 | 05003 | Hwy 15 Eastbound | US Hwy 10 | Replace | 2027 | $1,900,000 | |
30 | 3 | 86807 | Hwy 24 | I 94 | Replace | 2028 | $3,200,000 | |
30 | 3 | 73809 | I 94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | |
30 | 3 | 71002 | US Hwy 169 Northbound | US Hwy 10 | Replace | 2023 | $3,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 6896 | I 94 Eastbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73811 | I 94 Westbound | Sauk River | Replace | 2027 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73875 | I 94 Westbound | BNSF Rr | Replace | 2022 | $1,900,000 | Coordinate with bridge73876 |
30 | 3 | 73850 | I 94 Eastbound | Hwy 238 | Replace | 2027 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 6897 | I 94 Eastbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73849 | I 94 Westbound | Hwy 238 | Replace | 2027 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 6 | 9414 | US Hwy 52 Southbound | North Fork Zumbro River | Replace | 2021 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 9659 | US Hwy 52 Southbound | Hwy 60 | Replace | 2021 | $2,200,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9660. |
30 | 7 | 07010 | US Hwy 14 Eastbound | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
30 | M | 5891 | Hwy 55 | CP Railroad | Replace | 2025 | $8,400,000 | Reforming site visit to try to delay replacement to FY35 with minor repairs |
30 | M | 9500 | Hwy 100 | Hwy 62 | Replace | Not selected | $8,200,000 | |
29 | 7 | 07011 | US Hwy 14 | Minnesota River | Replace | Not Selected | $24,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
29 | 7 | 07011 | US Hwy 14 | Minnesota River | Replace | Not Selected | $24,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
20 | 7 | 07009 | US Hwy 14 Westbound | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
20 | 1 | 38008 | US Hwy 61 | Crow Creek | Redeck | Not Selected | $2,500,000 | |
20 | 1 | 69879A | I 35 Southbound | CP Railroad | Replace | Not Selected | $37,400,000 | |
20 | 1 | 58808 | I 35 Northbound | Kettle River | Overlay deck surface | Not Selected | $700,000 | |
20 | 1 | 58807 | I 35 Southbound | Kettle River | Overlay deck surface | Not Selected | $700,000 | |
20 | 1 | 09803 | I 35 Southbound | BNSF Railroad | Replace | Not Selected | $2,300,000 | |
20 | 1 | 69852 | I 35 | Over Superior Hiking Trail | Replace | Not Selected | $8,700,000 | |
20 | 1 | 9189 | I 35 Northbound | Hwy 210 | Replace | Not Selected | $2,800,000 | Under consideration to be added to pavement project |
20 | 3 | 73820 | I 94 Eastbound | Stearns County Road 184 | Replace | 2027 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 3 | 5428 | US Hwy 71 | Sauk River | Overlay deck surface | 2025 | $2,600,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 4 | 76003 | US Hwy 12 | Cottonwood Creek | Replace | 2023 | $1,200,000 | Replace due to obsolete channel span design and load rating |
20 | 4 | 76004 | US Hwy 12 | South of 45 Ave SW near Benson | Replace | 2023 | $1,200,000 | Replace due to obsolete channel span design and load rating |
20 | 6 | 24815 | I 90 Westbound | Ditch east of 225th St in Albert Lea | Reoverlay deck surface | Not Selected | $800,000 | |
20 | 6 | 24816 | I 90 Eastbound | Ditch east of 225th St in Albert Lea | Reoverlay deck surface | Not Selected | $800,000 | |
20 | 6 | 55025 | US Hwy 52 Northbound | 36th Ave SE | Redeck | Not Selected | $700,000 | |
20 | 6 | 55803 | I 90 Westbound | Olmsted County Road 20 | Replace | Not Selected | $2,000,000 | |
20 | 6 | 55809 | I 90 Westbound | US Hwy 52 | Replace | 2024 | $4,500,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | 6 | 55810 | I 90 Eastbound | US Hwy 52 | Replace | 2024 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | 6 | 6482 | US Hwy 61 | East of Withers Harbor Dr in Red Wing | Replace | 2023 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 6483. |
20 | 6 | 79002 | US Hwy 61 Northbound | Whitewater River | Redeck | Not Selected | $400,000 | |
20 | 6 | 9046 | US Hwy 61 Southbound | Burns Creek | Replace | Not Selected | $2,000,000 | |
20 | 6 | 9092 | US Hwy 61 Northbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | |
20 | 7 | 07009 | US Hwy 14 Westbound | Blue Earth County Road 5 | Replace | Not Selected | $2,300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
20 | 8 | 43008 | US Hwy 212 Eastbound | Buffalo Creek | Replace | 2031 | $1,800,000 | |
20 | M | 6817 | Hwy 65 Southbound | Coon Creek | Replace | 2024 | $900,000 | Tied to 9417 with a high score of 65 |
20 | M | 27033 | Hwy 7 | US Hwy 169 | Redeck | 2026 | $3,500,000 | Redeck per Bridge office recommendation |
20 | M | 27193 | Hwy 7 | Minnehaha Creek | Reoverlay deck surface | 2026 | $400,000 | Overlay per bridge office recommendation |
20 | M | 27171 | Hwy 55 Westbound | Bloomington Rd | Replace | Not selected | $1,500,000 | |
20 | M | 27863 | I 94 | Cedar Ave | Overlay deck surface | Not selected | $1,100,000 | |
20 | M | 82001 | US Hwy 8 | 2nd St NW | Replace | Not selected | $4,500,000 | |
20 | M | 82002 | US Hwy 8 | US Hwy 61 | Replace | Not selected | $5,300,000 | |
18 | 1 | 69882N | I 35 Northbound | S Of Garfield Ave Near BNSF Rail | Replace | 2021 | $18,300,000 | Twin Ports Interchange project |
18 | 1 | 69881N | I 35 Southbound | S Of Garfield Ave Near BNSF Rail | Replace | 2021 | $18,300,000 | Twin Ports Interchange project |
15 | 1 | 69808 | I 535 | S Of Garfield Ave Near BNSF Rail | Superstructure repairs | 2028 | $11,300,000 | Planned with Blatnik bridge replacement |
10 | 7 | 22002 | US Hwy 169 | Coon Creek | Reoverlay deck surface | 2022 | $100,000 | |
10 | 7 | 53001 | US Hwy 59 | Jack Creek | Overlay deck surface | Not Selected | $100,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 53002 | US Hwy 59 | North Branch Jack Creek | Overlay deck surface | Not Selected | $100,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 07020 | US Hwy 14 Eastbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
10 | 7 | 07023 | US Hwy 14 | US Hwy 169 | Redeck | Not Selected | $3,400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
10 | 7 | 07037 | US Hwy 169 | Blue Earth River | Overlay deck surface | Not Selected | $400,000 | Will consider with 2027 pavement project |
10 | 7 | 83005 | Hwy 15 Southbound | Hwy 60 | Reoverlay deck surface | Not Selected | $700,000 | |
10 | 7 | 67805 | I 90 Westbound | Rock River | Replace | Not Selected | $2,200,000 | Removed from 2021 project, Can be addressed with a different project |
10 | 7 | 83015 | Hwy 15 Southbound | Watonwan County Road 9 | Overlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 83021 | Hwy 15 | Hwy 60 | Overlay deck surface | 2022 | $600,000 | |
10 | 3 | 48012 | US Hwy 169 Northbound | W Bridge Rum River | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
10 | 4 | 21818 | I 94 Eastbound | Douglas County Road 23 | Redeck | 2024 | $100,000 | Coordinated with pavement project, including BR # 21815 & BR # 21816 |
10 | 4 | 56001 | Hwy 210 Westbound | I 94 | Replace | 2028 | $2,500,000 | Replace railing/ monitor deck include with Br 9697; coordinated with pavement project |
10 | 4 | 76001 | US Hwy 12 | Chippewa River | Preventative maintenance | 2023 | $100,000 | Replace railing/ monitor deck include with Br 76003 & 76004 |
10 | 4 | 9026 | US Hwy 10 Eastbound | Buffalo River | Replace | 2028 | $1,100,000 | Coordinated with pavement project |
10 | 4 | 9031 | US Hwy 10 Westbound | Buffalo River | Replace | 2028 | $1,000,000 | Coordinated with pavement project |
10 | 6 | 23007 | US Hwy 52 | Rice Creek | Overlay deck surface | Not Selected | $100,000 | |
10 | 6 | 23008 | US Hwy 52 | Watson Creek | Overlay deck surface | Not Selected | $300,000 | |
10 | 6 | 23011 | US Hwy 52 | North Branch of Root River | Overlay deck surface | Not Selected | $400,000 | |
10 | 6 | 24825 | I 35 Southbound | US Hwy 65 | Redeck | Not Selected | $1,800,000 | |
10 | 6 | 24826 | I 35 Northbound | US Hwy 65 | Redeck | Not Selected | $1,900,000 | |
10 | 6 | 25008 | US Hwy 61 | Wells Creek | Overlay deck surface | Not Selected | $300,000 | |
10 | 6 | 25009 | US Hwy 52 Northbound | North Fork Zumbro River | Reoverlay deck surface | Not Selected | $300,000 | |
10 | 6 | 66809 | I 35 Southbound | Rice County road 93 | Replace | Not Selected | $2,500,000 | |
10 | 6 | 66810 | I 35 Northbound | Rice County road 93 | Replace | Not Selected | $2,500,000 | |
10 | 6 | 66815 | I 35 Southbound | Rice County Road 11 | Replace | Not Selected | $2,200,000 | |
10 | 6 | 66816 | I 35 Northbound | Rice County Road 11 | Replace | Not Selected | $2,200,000 | |
10 | 6 | 79003 | US Hwy 61 Southbound | E Indian Creek | Overlay deck surface | Not Selected | $200,000 | |
10 | 6 | 79004 | US Hwy 61 Southbound | Snake Cree | Replace | Not Selected | $6,800,000 | |
10 | 6 | 85017 | Hwy 43 | West Burns Valley Creek | Overlay deck surface | Not Selected | $200,000 | |
10 | 6 | 9858 | I 90 Eastbound | North Branch Root River | Overlay deck surface | Not Selected | $500,000 | |
10 | 7 | 22002 | US Hwy 169 | Coon Creek | Reoverlay deck surface | 2022 | $100,000 | |
10 | 7 | 53001 | US Hwy 59 | Jack Creek | Overlay deck surface | Not Selected | $100,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 53002 | US Hwy 59 | North Branch Jack Creek | Overlay deck surface | Not Selected | $100,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 07020 | US Hwy 14 Eastbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
10 | 7 | 07023 | US Hwy 14 | US Hwy 169 | Redeck | Not Selected | $3,400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
10 | 7 | 07037 | US Hwy 169 | Blue Earth River | Overlay deck surface | Not Selected | $400,000 | Will consider with 2027 pavement project |
10 | 7 | 83005 | Hwy 15 Southbound | Hwy 60 | Reoverlay deck surface | Not Selected | $700,000 | |
10 | 7 | 67805 | I 90 Westbound | Rock River | Replace | Not Selected | $2,200,000 | Removed from 2021 project, Can be addressed with a different project |
10 | 7 | 83015 | Hwy 15 Southbound | Watonwan County Road 9 | Overlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project on the corridor |
10 | 7 | 83021 | Hwy 15 | Hwy 60 | Overlay deck surface | 2022 | $600,000 | |
10 | 8 | 43005 | US Hwy 212 Westbound | Buffalo Creek | Replace | 2031 | $1,800,000 | |
10 | M | 02035 | US Hwy 10 | Hwy 47 Northbound | Reoverlay deck surface | 2021 | $300,000 | tied to 02046 with a score of 60 |
10 | M | 02045 | US Hwy 10 Westbound | Hwy 65 | Reoverlay deck surface | 2021 | $100,000 | tied to 02046 with a score of 60 |
10 | M | 27409 | I 35W Southbound | Mississippi River | Preventative Maintenance | 2021 | $500,000 | High priority preventive maintenance on post-tensioned bridge |
10 | M | 27410 | I 35W Northbound | Mississippi River | Preventative Maintenance | 2021 | $500,000 | High priority preventive maintenance on post-tensioned bridge |
10 | M | 10021 | US Hwy 212 Westbound | Carver County Road 36 | Overlay deck surface | 2023 | $700,000 | With pavement project. Selected prior to policy (in 2019-2022 STIP) |
10 | M | 27255 | US Hwy 169 Southbound | BNSF Railroad | Overlay deck surface | 2023 | $300,000 | With pavement project. Selected prior to policy (in 2019-2022 STIP) |
10 | M | 82855 | I 494 Eastbound | Mississippi River | Reoverlay deck surface | 2024 | $3,200,000 | Tied to 82856 with score of 80. Overlay due to failing epoxy chip seal |
10 | M | 6894 | Hwy 280 | BNSF Railroad | Overlay deck surface | 2026 | $1,100,000 | Tied to 6242-83. Pavement score 84 |
10 | M | 27521 | Hwy 62 | 28th Ave S | Replace | Not selected | $2,900,000 | |
10 | M | 27923 | I 94 Westbound | Brooklyn Blvd Co. 152 | Replace | Not selected | $3,600,000 | |
10 | M | 62847 | I 94 | Fairview Avenue | Replace | Not selected | $5,500,000 | |
10 | M | 6566 | US Hwy 8 Taylors Falls | St Croix River | Replace | Not selected | $6,500,000 | |
10 | M | 7265 | Hwy 62 Eastbound | Valley View Rd | Replace | Not selected | $1,800,000 | |
10 | M | 82809 | I 694 Southbound | 50th St N | Replace | Not selected | $1,500,000 | |
10 | M | 82811 | I 694 Southbound | Gateway Trail | Replace | Not selected | $1,600,000 | |
10 | M | 9050 | Hwy 280 | Como Ave | Replace | Not selected | $3,700,000 | |
0 | 7 | 07036 | Hwy 22 | DME Railroad | Overlay deck surface | 2024 | $500,000 | |
0 | 7 | 40002 | Hwy 22 | Minnesota River | Preventative Maintenance | 2024 | $200,000 | |
0 | 7 | 52008 | US Hwy 169 Ramp | US Hwy 169 | Reoverlay deck surface | Not Selected | $200,000 | Waiting to coordinate with another project on the corridor |
0 | 7 | 52011 | US Hwy 169 Ramp | US Hwy 169 | Reoverlay deck surface | Not Selected | $200,000 | Waiting to coordinate with another project on the corridor |
0 | 7 | 52012 | US Hwy 169 | US Hwy 169 | Reoverlay deck surface | Not Selected | $500,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
0 | 7 | 07015 | US Hwy 14 Westbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07016 | US Hwy 14 Eastbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07025 | US Hwy 14 Westbound | Hwy 22 | Overlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07026 | US Hwy 14 Eastbound | Hwy 22 | Reoverlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 83017 | Hwy 15 Southbound | Watonwan River | Replace | Not Selected | $3,500,000 | |
0 | 7 | 83018 | Hwy 15 Northbound | Watonwan River | Replace | Not Selected | $3,500,000 | |
0 | 1 | 69801B | I 535 Southbound | Over fill near BNSF Railyard | Redeck | 2021 | $600,000 | Twin Ports Interchange project |
0 | 1 | 69801D | I 535 Southbound | Over fill near BNSF Railyard | Replace | 2021 | $2,200,000 | Twin Ports Interchange project |
0 | 1 | 69801E | I 535 Southbound off ramp | Over fill near BNSF Railyard | Replace | 2021 | $2,700,000 | Twin Ports Interchange project |
0 | 1 | 69801L | I 535 Northbound | I 35 Southbound | Replace | 2021 | $1,900,000 | Twin Ports Interchange project |
0 | 1 | 69801M | I 535 Northbound on ramp | Over fill near BNSF Railyard | Replace | 2021 | $2,300,000 | Twin Ports Interchange project |
0 | 1 | 69882A | I 35 Northbound on ramp | Over fill near BNSF Railyard | Replace | 2021 | $1,700,000 | Twin Ports Interchange project |
0 | 1 | 69882B | I 35 Northbound on ramp | Over fill near BNSF Railyard | Replace | 2021 | $1,400,000 | Twin Ports Interchange project |
0 | 1 | 69881 | I 35 Southbound | South of Garfield Ave near BNSF railyard | Replace | 2021 | $7,000,000 | Twin Ports Interchange project |
0 | 1 | 69881A | I 35 Southbound ramp | Over fill near BNSF Railyard | Replace | 2021 | $1,800,000 | Twin Ports Interchange project |
0 | 1 | 69881B | I 35 Southbound off ramp | Over fill near BNSF Railyard | Replace | 2021 | $800,000 | Twin Ports Interchange project |
0 | 1 | 69802B | I 535 Southbound on ramp | 21st Ave on ramp | Replace | 2027 | $1,400,000 | Bridge was recently load posted. Currently excluded from Twin Ports Interchange project, minor repair project is in the works |
0 | 1 | 69801G | I 535 | Superior St | Replace | 2027 | $5,900,000 | Temporary connection to Twin Ports Interchange |
0 | 1 | 69809 | I 535 Southbound off ramp | BNSF Railroad | Superstructure repairs | 2028 | $4,200,000 | Planned with Blatnik bridge replacement |
0 | 1 | 69810 | I 535 | BNSF Railroad | Superstructure repairs | 2028 | $3,300,000 | Planned with Blatnik bridge replacement |
0 | 1 | 69808A | I 535 Northbound ON RAMP | Garfield Ave | Superstructure repairs | 2028 | $2,800,000 | Planned with Blatnik bridge replacement |
0 | 1 | 69081 | US Hwy 169 Southbound | DM&IR Railyard (Abandon) | Replace | Not Selected | $2,200,000 | Under consideration to be removed under 2024 pavement project |
0 | 1 | 9188 | I 35 Southbound | Hwy 210 | Replace | Not Selected | $2,800,000 | Under consideration to be added to pavement project |
0 | 1 | 69010 | US Hwy 53 Northbound | 6th Ave West | Replace | Not Selected | $1,600,000 | Project is being developed to be ready if additional funding becomes available |
0 | 1 | 69009 | US Hwy 53 Southbound | 6th Ave West | Replace | Not Selected | $1,600,000 | Project is being developed to be ready if additional funding becomes available |
0 | 1 | 31010 | US Hwy 169 Northbound | BNSF Railroad Spur | Redeck | Not Selected | $700,000 | |
0 | 1 | 31009 | US Hwy 169 Southbound | BNSF Railroad Spur | Redeck | Not Selected | $700,000 | |
0 | 1 | 69879C | I 35 Northbound ON RAMP | 58th Ave west | Replace | Not Selected | $6,400,000 | |
0 | 1 | 69879B | I 35 Southbound OFF RAMP | Near Grand Ave | Replace | Not Selected | $1,200,000 | |
0 | 1 | 09804 | I 35 Northbound | BNSF Railroad | Replace | Not Selected | $2,300,000 | |
0 | 2 | 68001 | Hwy 11 | Hay Creek | Replace | Not Selected | $1,600,000 | Not a district performance priority, will continue to monitor bridge performance |
0 | 2 | 15001 | US Hwy 2 Westbound | Clearwater River | Superstructure repairs | 2022 | $500,000 | Selected prior to the adoption of the scoring policy (in 2019-2022 STIP) |
0 | 3 | 73807 | I 94 Westbound | Hwy 4 | Replace | Not Selected | $1,600,000 | |
0 | 3 | 6870 | I 94 Eastbound | Sauk River | Replace | 2027 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | 3 | 01004 | US Hwy 169 | Mississippi River | Preventive maintenance | 2022 | $200,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 3 | 48015 | US Hwy 169 Southbound | Mille Lacs County Road 29 | Preventive maintenance | 2025 | $700,000 | Overlay , with twin bridge 48016 which scores 70 |
0 | 3 | 01006 | Hwy 210 | Rice River | Overlay deck surface | 2022 | $200,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 3 | 48009 | US Hwy 169 Southbound | Mille Lacs County Road 31 | Preventive maintenance | 2025 | $700,000 | Overlay , with twin bridge 48010 which scores 70 |
0 | 4 | 14804 | I 94 Eastbound | South Bridge Buffalo River | Replace | Not Selected | $5,700,000 | Received new deck in 2012 |
0 | 4 | 21817 | I 94 Westbound | Douglas County Road 23 | Redeck | 2024 | $100,000 | Coordinated with pavement project, including BR # 21815 & BR # 21816 |
0 | 4 | 56811 | I 94 Westbound | Otter Tail County Road 21 | Preventative maintenance | Not Selected | $200,000 | Guardrail work completed & received new deck in 2014 |
0 | 4 | 56813 | I 94 Westbound | Otter Tail County Road 10 | Preventative maintenance | Not Selected | $100,000 | Guardrail work completed & received new deck in 2015 |
0 | 4 | 9691 | I 94 Westbound | Otter Tail County Road 88 | Preventative maintenance | Not Selected | $200,000 | Guardrail work completed & received new deck in 2016 |
0 | 6 | 20001 | US Hwy 14 Westbound | Hwy 57 | Redeck | Not Selected | $700,000 | |
0 | 6 | 20002 | US Hwy 14 Eastbound | Hwy 57 | Redeck | Not Selected | $700,000 | |
0 | 6 | 24843 | I 90 Westbound | Hwy 13 | Replace | Not Selected | $2,000,000 | |
0 | 6 | 24844 | I 90 Eastbound | Hwy 13 | Replace | Not Selected | $2,000,000 | |
0 | 6 | 50805 | I 90 Westbound | 12 Ave NW | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 50806 | I 90 Eastbound | 12 Ave NW | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 55805 | I 90 Westbound | Olmsted County Road 1 | Replace | Not Selected | $2,100,000 | |
0 | 6 | 66812 | I 35 Northbound | Hwy 60 | Replace | Not Selected | $4,600,000 | |
0 | 6 | 66813 | I 35 Southbound | Cannon River | Replace | Not Selected | $1,700,000 | |
0 | 6 | 66814 | I 35 Northbound | Cannon River | Replace | Not Selected | $1,700,000 | |
0 | 6 | 66817 | I 35 Southbound | Hwy 21 | Replace | Not Selected | $3,800,000 | |
0 | 6 | 66818 | I 35 Northbound | Hwy 21 | Replace | Not Selected | $2,800,000 | |
0 | 6 | 66825 | I 35 Southbound | Hwy 19 | Reoverlay deck surface | Not Selected | $300,000 | |
0 | 6 | 66826 | I 35 Northbound | Hwy 19 | Reoverlay deck surface | Not Selected | $300,000 | |
0 | 6 | 74811 | I 35 Southbound | Straight River | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 79001 | US Hwy 61 Southbound | Whitewater River | Preventative maintenance | Not Selected | $300,000 | |
0 | 6 | 79008 | US Hwy 61 Northbound | E Indian Creek | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 79010 | US Hwy 61 Northbound | Zumbro River | Replace | Not Selected | $5,300,000 | |
0 | 6 | 79016 | US Hwy 61 Northbound | Snake Creek | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 85015 | US Hwy 61 Southbound | Garvin Brook | Preventative maintenance | Not Selected | $200,000 | |
0 | 6 | 85016 | US Hwy 61 Northbound | Garvin Brook | Preventative maintenance | Not Selected | $300,000 | |
0 | 6 | 85819 | I 90 Westbound | Winona County Road 33 | Redeck | Not Selected | $600,000 | |
0 | 6 | 85823 | I 90 Westbound | Rush Creek | Replace | Not Selected | $4,700,000 | |
0 | 6 | 85840 | Hwy 43 Northbound | I 90 | Replace | Not Selected | $2,800,000 | |
0 | 6 | 9045 | US Hwy 61 Northbound | Burns Creek | Replace | Not Selected | $2,000,000 | |
0 | 6 | 9449 | US Hwy 61 | East 5th St | Replace | Not Selected | $3,400,000 | |
0 | 6 | 9660 | US Hwy 52 Northbound | Hwy 60 | Replace | 2021 | $1,600,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9659. |
0 | 7 | 07036 | Hwy 22 | DME Railroad | Overlay deck surface | 2024 | $500,000 | |
0 | 7 | 40002 | Hwy 22 | Minnesota River | Preventative Maintenance | 2024 | $200,000 | |
0 | 7 | 52008 | US Hwy 169 Ramp | US Hwy 169 | Reoverlay deck surface | Not Selected | $200,000 | Waiting to coordinate with another project on the corridor |
0 | 7 | 52011 | US Hwy 169 Ramp | US Hwy 169 | Reoverlay deck surface | Not Selected | $200,000 | Waiting to coordinate with another project on the corridor |
0 | 7 | 52012 | US Hwy 169 | US Hwy 169 | Reoverlay deck surface | Not Selected | $500,000 | Potentially can be addressed with a later US Hwy 169/60 project. |
0 | 7 | 07015 | US Hwy 14 Westbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07016 | US Hwy 14 Eastbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07025 | US Hwy 14 Westbound | Hwy 22 | Overlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 07026 | US Hwy 14 Eastbound | Hwy 22 | Reoverlay deck surface | Not Selected | $300,000 | Consider as part of US Hwy 14 corridor project in 8-10 years |
0 | 7 | 83017 | Hwy 15 Southbound | Watonwan River | Replace | Not Selected | $3,500,000 | |
0 | 7 | 83018 | Hwy 15 Northbound | Watonwan River | Replace | Not Selected | $3,500,000 | |
0 | M | 10012 | Hwy 41 | Minnesota River | Preventative Maintenance | 2022 | $600,000 | Selected prior to policy in 2019-2022 STIP) Epoxy chip seal wearing course on river bridge |
0 | M | 02037E | US Hwy 10 Eastbound | University Ave | Reoverlay deck surface | Not selected | $900,000 | |
0 | M | 02037W | US Hwy 10 Westbound | University Ave | Reoverlay deck surface | Not selected | $1,000,000 | |
0 | M | 27831B | I 394 Eastbound off ramp | Dunwoody Blvd | Replace | Not selected | $1,800,000 | |
0 | M | 27906 | Hwy 494 Southbound | I-94 Off Ramp | Replace | Not selected | $3,400,000 | |
0 | M | 27907 | Hwy 494 Northbound | I 94 Eastbound | Replace | Not selected | $3,100,000 | |
0 | M | 62851 | I 694 Westbound | US Hwy 61 | Replace | Not selected | $3,100,000 | |
0 | M | 6721 | Hwy 55 Westbound | UP Railroad | Replace | Not selected | $1,800,000 | |
0 | M | 6803 | US Hwy 169 | UP Railroad | Replace | Not selected | $3,400,000 | |
0 | M | 82812 | I 694 Northbound | Gateway Trail | Replace | Not selected | $1,600,000 | |
0 | M | 9109 | US Hwy 52 Northbound | UP Railroad | Replace | Not selected | $1,800,000 | |
0 | M | 9605 | US Hwy 10 | I-35W | Replace | Not selected | $4,700,000 | |
0 | M | 6851 | I 494 Eastbound | I 35W | Replace | Not selected | $3,800,000 | Being considered in Corridors of Commerce project - not yet funded |
0 | M | 9081 | Hwy 77 Southbound | I 494 | Replace | Not selected | $1,900,000 | |
0 | M | 9082 | Hwy 77 Northbound | I 494 | Preventative Maintenance | Not selected | $200,000 |
Score | District | Bridge number | Route | Key intersection or closest landmark | Work type | Year planned (FY) | High level construction cost estimate for planning purposes | Comments |
---|---|---|---|---|---|---|---|---|
100 | Metro | 9600N | MN77 Northbound | Minnesota River/Blackdog Road | Reoverlay deck surface | 2025 | $3,800,000 | N/A |
97 | Metro | 27855 | I-94 | Highway 55 | Overlay deck surface | 2025 | $4,500,000 | N/A |
90 | 6 | 9009 | Hwy 30 | North Bridge Root River | Replace | 2021 | $1,900,000 | Coordinated with bridge 9008 |
90 | Metro | 9700 | US Hwy 10 | Rum River | Replace | 2022 | $61,000,000 | N/A |
90 | Metro | 9217E | I-494 Eastbound | Minnesota River | Reoverlay deck surface | 2023 | $7,300,000 | N/A |
90 | Metro | 9217W | I-494 Westbound | Minnesota River | Reoverlay deck surface | 2023 | $6,800,000 | N/A |
90 | Metro | 9600S | Hwy 77 Southbound | Minnesota River/Blackdog Road | Reoverlay deck surface | 2025 | $3,800,000 | N/A |
88 | 1 | 69816 | Lake Ave | Over I-35 | Overlay deck surface | 2020 | $2,000,000 | Coordinated with a city of Duluth project on Superior Street. |
87 | 3 | 71012 | Hwy 25 | Mississippi River | Overlay deck surface | 2024 | $2,500,000 | N/A |
85 | 1 | 69808 | I-535 | Over Garfield Ave and railroad | Redeck | 2028 | $3,700,000 | N/A |
81 | 6 | 9040 | US Hwy 63 | Mississippi River and Canadian Pacific Rail | Replace | Not Selected | $39,000,000 | Complex project that requires coordination with railroad |
80 | 1 | 69834 | 27th Ave W | Over I-35 | Redeck | 2020 | $200,000 | Part of Twin Ports Interchange, now being replaced with Bridge 69909 |
80 | 2 | 04021 | Irvine Ave | Over Highway 71 | Redeck | 2020 | $900,000 | N/A |
80 | 3 | 6852 | US Hwy 71 | Long Prairie River | Replace | 2020 | $1,500,000 | N/A |
80 | Metro | 19823 | I-494 Eastbound | I-35E | Reoverlay deck surface | 2020 | $1,000,000 | N/A |
80 | Metro | 19824 | I-494 Eastbound | I-35E | Reoverlay deck surface | 2020 | $900,000 | N/A |
80 | Metro | 19878 | Eastbound I-494 to Northbound I-35E | I-494/I-35E south ramp | Reoverlay deck surface | 2020 | $700,000 | N/A |
80 | Metro | 19899 | Westbound 494 to Southbound I-35E | I-494/I-35E north ramp | Reoverlay deck surface | 2020 | $500,000 | N/A |
80 | Metro | 27763 | Hwy 5 Eastbound on ramp | I-494 Westbound off ramp | Reoverlay deck surface | 2020 | $1,100,000 | Coordinated with 10 other bridges |
80 | Metro | 27962 | Hwy 100 Southbound | I-94/694 off ramp | Reoverlay deck surface | 2020 | $2,300,000 | N/A |
80 | Metro | 27984 | Eastbound over I-494 | I-494 Westbound off ramp | Reoverlay deck surface | 2020 | $1,200,000 | Coordinated with 10 other bridges |
80 | Metro | 9153 | Hwy 5 Westbound | Inbound/Outbound Airport road | Reoverlay deck surface | 2020 | $300,000 | Coordinated with 10 other bridges |
80 | 7 | 53802 | Hwy 91 | I-90 | Replace | 2021 | $2,100,000 | N/A |
80 | 8 | 6782 | Hwy 30 | Des Moines River | Overlay deck surface | 2021 | $100,000 | N/A |
80 | Metro | 9805 | I-94 Westbound on ramp | 12th St East | Reoverlay deck surface | 2021 | $400,000 | N/A |
80 | Metro | 9805A | Ramp to I-35E Southbound | I-94 Westbound | Reoverlay deck surface | 2021 | $200,000 | N/A |
80 | 3 | 6778 | Hwy 65 | Snake River | Replace | 2022 | $2,100,000 | N/A |
80 | 7 | 52001 | US Hwy 169 Southbound | Roberts Creek | Replace | 2022 | $1,400,000 | N/A |
80 | Metro | 27177 | Hwy 55 Eastbound | Franklin Ave | Redeck | 2022 | $500,000 | N/A |
80 | 1 | 09823 | I-35 Southbound | Over Carlton County Road 61 | Redeck | 2023 | $2,200,000 | N/A |
80 | Metro | 27586 | US Hwy 169 | Excelsior/3rd St /Railroad | Reoverlay deck surface | 2023 | $400,000 | N/A |
80 | Metro | 9263 | Anoka County Road 10 Eastbound | Highway 65 | Reoverlay deck surface | 2023 | $400,000 | N/A |
80 | 1 | 69870 | I-35 | 5th Avenue | Overlay deck surface | 2024 | $1,300,000 | N/A |
80 | 6 | 9201 | US Hwy 218 | I-90 | Replace | 2024 | $2,100,000 | Being delivered with pavement project |
80 | 6 | 9506 | Mower County Road 20 | I-90 | Redeck | 2024 | $800,000 | Project includes bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859 |
80 | 6 | 9859 | Olmsted County Road 35 | I-90 | Redeck | 2024 | $800,000 | Project includes bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859 |
80 | 3 | 5060 | Hwy 210 | Mississippi River | Reoverlay deck surface | 2025 | $1,100,000 | N/A |
80 | 7 | 53824 | Nobles County Road 60 | I-90 | Overlay deck surface | 2025 | $200,000 | N/A |
80 | 1 | 69879E | I-35 Northbound Off Ramp | Over 57th Ave W | Replace or repair | 2027 | $900,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E |
80 | 6 | 85006 | Hwy 74 | Midfork Whitewater River | Replace | 2027 | $1,800,000 | N/A |
80 | 1 | 36013 | US Hwy 71 | Over Little Fork River | Overlay deck surface | Not Selected | $500,000 | N/A |
80 | 4 | 9697 | Hwy 210 Eastbound | I-94 | Replace | Not Selected | $2,500,000 | Considering bundling with bridge 56001 westbound |
80 | 6 | 55017 | Olmstead County Road 36 | Highway 52 | Overlay deck surface | Not Selected | $600,000 | Not a district priority. Will continue to monitor bridge performance. |
80 | Metro | 02024 | Hwy 610 Eastbound | East River Road | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 02815 | I-694 | Highway 65 | Reoverlay deck surface | Not Selected | $1,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19816 | Cliff Rd | I-35E | Reoverlay deck surface | Not Selected | $2,200,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19855 | US Hwy 52 Southbound | I-494 | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 19856 | US Hwy 52 Northbound | I-494 | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27052A | Hwy 77 Northbound, Westbound 494 | 79th St /Highway 77 on ramp | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27726 | I-94 Eastbound off Ramp | Glenwood Ave | Reoverlay deck surface | Not Selected | $1,400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27726B | I-94 Southbound off Ramp | Lyndale Ave/UP railroad | Reoverlay deck surface | Not Selected | $2,500,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27727A | I-94 Northbound off Ramp | Glenwood Ave/UP railroad | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27767 | I-494 | Hwy 5 | Reoverlay deck surface | Not Selected | $1,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 27769 | I-494 Westbound off Ramp | to 34th Avenue | Reoverlay deck surface | Not Selected | $400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 82849 | I-94 Westbound | Hwy 95 | Reoverlay deck surface | Not Selected | $1,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
80 | Metro | 82850 | I-94 Eastbound | Highway 95 | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
79 | Metro | 27239 | Hwy 610 Westbound | Mississippi River | Reoverlay deck surface | Not Selected | $2,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
75 | 6 | 6483 | US Hwy 61 | Hay Creek/Withers Dr | Replace | 2023 | $10,000,000 | Being delivered with pavement project |
73 | 7 | 07042 | Belgrade Ave/Mulberry St | Minnesota River | Redeck | Not Selected | $8,800,000 | Coordination with City of Mankato required |
72 | 1 | 69802 | US Hwy 53 | Over W 1st to N 21st Ave W | Replace | 2021 | $17,000,000 | Included in Phase 3 of Twin Ports Interchange project |
70 | Metro | 19897 | I-494 Westbound | Westbound off ramp to I-35E | Reoverlay deck surface | 2020 | $200,000 | N/A |
70 | Metro | 19898 | I-494 Eastbound | Off ramp to I-35E southbound | Reoverlay deck surface | 2020 | $300,000 | N/A |
70 | Metro | 19900 | I-494 Eastbound off ramp | Off ramp to I-35E southbound | Reoverlay deck surface | 2020 | $200,000 | N/A |
70 | Metro | 27971 | Hwy 5 | I-494 | Reoverlay deck surface | 2020 | $1,100,000 | N/A |
70 | Metro | 27983 | Hwy 5 Westbound | I-494 westbound off ramp | Reoverlay deck surface | 2020 | $500,000 | N/A |
70 | 2 | 68004 | Hwy 32 | Over farm ditch south of 180th St | Overlay deck surface | 2021 | $300,000 | N/A |
70 | 8 | 5133 | Hwy 19 | Redwood River | Reoverlay deck surface | 2021 | $400,000 | N/A |
70 | 6 | 9179 | I-90 Eastbound | 6th St NE | Reoverlay deck surface | 2023 | $900,000 | Coordinated with bridge 9178, being delivered with pavement project |
70 | 7 | 83022 | Hwy 15 | Union Pacific railroad | Overlay deck surface | 2023 | $500,000 | N/A |
70 | Metro | 27765 | I-494 | 34th Ave S | Reoverlay deck surface | 2023 | $800,000 | N/A |
70 | 3 | 71007 | US Hwy 169 Southbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2024 | $300,000 | N/A |
70 | 3 | 49009 | US Hwy 10 | BNSF railroad & Morrison County Highway 76 | Overlay deck surface | 2024 | $900,000 | N/A |
70 | 3 | 48016 | US Hwy 169 Northbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2024 | $300,000 | N/A |
70 | 1 | 9787 | I-35 Southbound | Over Grindstone River | Replace | 2025 | $2,000,000 | Coordinated with bridge 9788 |
70 | 3 | 48011 | US Hwy 169 Southbound | West Rum River Bridge | Overlay deck surface | 2025 | $300,000 | N/A |
70 | 3 | 48010 | US Hwy 169 Northbound | Mille Lacs County Highway 31 | Reoverlay deck surface | 2025 | $300,000 | N/A |
70 | 7 | 53811 | Nobles County Road 61 | I-90 | Overlay deck surface | 2025 | $200,000 | N/A |
70 | 7 | 53822 | Hwy 264 | I-90 | Overlay deck surface | 2025 | $500,000 | N/A |
70 | Metro | 6583 | I-35W | UP Railroad, Cliff Rd (Dakota County Road 32) | Replace | 2025 | $7,900,000 | Replace with bridges 9780 and 9779 |
70 | 3 | 71008 | US Hwy 169 Northbound | Mille Lacs County Highway 29 | Reoverlay deck surface | 2026 | $300,000 | N/A |
70 | 7 | 9098 | US Hwy 169 | Minnesota River | Reoverlay deck surface | 2026 | $4,500,000 | N/A |
70 | 7 | 07029 | US Hwy 169 | South Riverfront Drive | Reoverlay deck surface | 2026 | $700,000 | Coordinated with a pavement project |
70 | Metro | 27033 | Hwy 7 | US Hwy 169 | Reoverlay deck surface | 2026 | $1,800,000 | N/A |
70 | Metro | 27046 | Killebrew Drive | Hwy 77 | Reoverlay deck surface | 2026 | $1,800,000 | N/A |
70 | 7 | 83037 | Hwy 60 | Union Pacific railroad | Overlay deck surface | 2028 | $300,000 | Coordinating with another MnDOT project in the corridor |
70 | 7 | 07030 | US Hwy 169 | Sibley St | Reoverlay deck surface | 2029 | $500,000 | Coordinated with a pavement project |
70 | 7 | 07040 | US Hwy 169 Northbound | Blue Earth River | Reoverlay deck surface | 2029 | $500,000 | Coordinated with a pavement project |
70 | 7 | 07039 | US Hwy 169 Southbound | Blue Earth River | Reoverlay deck surface | 2029 | $600,000 | Coordinated with a pavement project |
70 | 7 | 07041 | US Hwy 169 Northbound | Highway 169 Off Ramp | Reoverlay deck surface | 2029 | $400,000 | Coordinated with a pavement project |
70 | 1 | 69817 | I-35 Northbound On Ramp | Near East Superior St | Overlay deck surface | Not Selected | $400,000 | Will be evaluated as part of I-35 corridor plan |
70 | 1 | 69852 | I-35 | Over Superior Hiking Trail | Reoverlay deck surface | Not Selected | $1,000,000 | Will be evaluated as part of I-35 corridor plan |
70 | 3 | 73855 | I-94 Westbound | Highway 15 | Reoverlay deck surface | Not Selected | $800,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 73856 | I-94 Eastbound | Highway 15 | Reoverlay deck surface | Not Selected | $600,000 | Received new deck surface in 2016, bridge office anticipates surface will last through the end of the CHIP |
70 | 3 | 73019 | Stearns County Highway 137 | Highway 15 | Reoverlay deck surface | Not Selected | $400,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 24836 | Freeborn County Road 25 | I-35 | Overlay deck surface | Not Selected | $300,000 | Needs further review of rails, joints etc. |
70 | 6 | 25014 | US Hwy 61 Northbound | Spring Creek | Reoverlay deck surface | Not Selected | $300,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 55035 | Olmstead County Highway 126 | Highway 52 | Reoverlay deck surface | Not Selected | $400,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 55053 | Mayowood Dr | Highway 52 | Reoverlay deck surface | Not Selected | $300,000 | Not a district priority. Will continue to monitor bridge performance. |
70 | 6 | 9104 | Hwy 76 | Money Creek | Overlay deck surface | Not Selected | $300,000 | Historic bridge and needs additional review |
70 | 7 | 67809 | Rock County Road 55 | I-90 | Overlay deck surface | Not Selected | $600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | 7 | 07015 | US Hwy 14 Westbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with a pavement project in the corridor |
70 | 7 | 07016 | US Hwy 14 Eastbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with a pavement project in the corridor |
70 | 7 | 17007 | Hwy 60 Westbound | Union Pacific railroad | Reoverlay deck surface | Not Selected | $400,000 | Waiting to coordinate with another project. |
70 | 7 | 46812 | I-90 Eastbound | Highway 263 | Overlay deck surface | Not Selected | $400,000 | Maintenance performed in 2017 |
70 | 7 | 32802 | Jackson County Road 9 | I-90 | Overlay deck surface | Not Selected | $500,000 | Waiting to coordinate with another project. |
70 | Metro | 02025 | Hwy 610 Westbound | BNSF Railroad | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 02027 | Hwy 610 Westbound | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 02028 | Hwy 610 Eastbound | Coon Rapids Blvd | Reoverlay deck surface | Not Selected | $400,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19023 | Hwy 55 Westbound | US Hwy 52 Southbound | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19812 | I-35E Northbound | Dakota County Road 42 | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19827 | Hwy 55 | I-494 | Redeck | Not Selected | $10,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19891 | I-35W Southbound | Southcross Drive | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19892 | I-35W Northbound | Southcross Drive | Reoverlay deck surface | Not Selected | $1,300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19893 | I-35E Southbound | Southcross Drive | Reoverlay deck surface | Not Selected | $900,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 19896 | I-494 | UP Railroad Hardman Ave | Reoverlay deck surface | Not Selected | $1,600,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27051 | Hwy 77 | American Blvd | Overlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27052C | Hwy 77 Northbound | American Blvd | Reoverlay deck surface | Not Selected | $1,800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27053A | Hwy 77 Southbound on Ramp | Highway 77 northbound off ramp to I-494 westbound | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27070 | Hwy 77 Northbound | Highway 77 northbound off ramp | Reoverlay deck surface | Not Selected | $300,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27237 | Hwy 55 | BNSF/CP railroad | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27726A | I-94 Southbound off Ramp | BNSF railroad/ UP railroad | Reoverlay deck surface | Not Selected | $1,700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27734 | I-694 Eastbound | I-94 westbound | Reoverlay deck surface | Not Selected | $1,500,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27742 | US Hwy 169 | I-394 | Reoverlay deck surface | Not Selected | $2,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27817 | I-94 Southbound on Ramp | Southbound off ramp | Reoverlay deck surface | Not Selected | $800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27914 | Hwy 100 Northbound off Ramp | I-94/694 eastbound | Reoverlay deck surface | Not Selected | $1,800,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27960 | I-694 Eastbound on Ramp | I-94 eastbound | Reoverlay deck surface | Not Selected | $700,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 27982 | Hwy 100 Northbound | I-94 eastbound on ramp | Reoverlay deck surface | Not Selected | $1,100,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
70 | Metro | 82800 | I-94 Eastbound | St. Croix River | Reoverlay deck surface | Not Selected | $13,000,000 | Fiscal years 2028 and 2029 NHS bridge funds primarily dedicated to the Blatnik bridge (bridge #9030) |
65 | 1 | 6592 | Hwy 1 | Over Stony River | Replace | 2020 | $2,200,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 69801N | I-535 Northbound | Over Duluth Cross City Trail | Replace | 2020 | $1,800,000 | Part of Twin Ports Interchange |
65 | 2 | 9059 | Hwy 11 | Over Warroad River | Replace | 2020 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 8 | 9287 | Hwy 29 | Forest Ave | Replace | 2020 | $2,600,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | Metro | 27161 | Hwy 55 eastbound off ramp | Highway 5 westbound on ramp | Redeck | 2020 | $300,000 | Redeck with 10 other bridges |
65 | 1 | 69802D | US Hwy 53 Northbound On Ramp | At 20th Ave NW | Replace | 2021 | $4,500,000 | Included in Phase 3 of Twin Ports Interchange project. (https://www.dot.state.mn.us/d1/projects/twin-ports-interchange/) |
65 | 3 | 86817 | I-94 Westbound | Wright County Highway 19 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 3 | 86818 | I-94 Eastbound | Wright County Highway 19 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9504 | Mower County Road 46 | I-90 | Replace | 2021 | $2,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 6 | 9008 | Hwy 30 | Mill Creek | Replace | 2021 | $1,200,000 | Coordinated with bridge 9009 |
65 | 6 | 5932 | Hwy 74 | South Fork Whitewater River | Replace | 2021 | $1,100,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 8 | 6754 | Hwy 91 | Judicial Ditch #14 | Replace | 2021 | $500,000 | Coordinated with a pavement project |
65 | 8 | 6753 | Hwy 91 | Chanarambie Creek | Replace | 2021 | $500,000 | Coordinated with a pavement project |
65 | 1 | 69802C | US Hwy 53 | 19th St | Replace | 2022 | $13,000,000 | Part of Twin Ports Interchange project |
65 | 2 | 15001 | US Hwy 2 Westbound | Over Clearwater River | Superstructure repairs | 2022 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 3 | 73876 | I-94 Eastbound | Burlington Northern Santa Fe Railroad | Replace | 2022 | $1,600,000 | Coordinated with bridge 73875 |
65 | 6 | 9728 | I-90 Eastbound | Freeborn County Road 46 | Replace | 2022 | $2,800,000 | Replace due to width |
65 | Metro | 27785 | Hwy 5 | I-94 | Redeck | 2022 | $900,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | Metro | 27849 | Hwy 55 Eastbound | I-35W | Redeck | 2022 | $500,000 | Selected as part of the Rethinking I-94 project |
65 | Metro | 27875 | Hwy 55 Westbound | I-35W | Redeck | 2022 | $700,000 | Selected as part of the Rethinking I-94 project |
65 | Metro | 9713 | US Hwy 169 | Highway 10 | Replace | 2022 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 6602 | US Hwy 53 Northbound | Over St. Louis River | Replace | 2023 | $350,000 | Selected prior to policy (in 2019-2022 STIP) |
65 | 1 | 9469 | I-35 | Carlton County Road 26 | Redeck | 2023 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 6868 | I-90 Westbound | Cedar River | Replace | 2023 | $3,200,000 | Coordinated with bridge 6869, being delivered with a pavement project |
65 | 6 | 6869 | I-90 Eastbound | Cedar River | Replace | 2023 | $3,200,000 | Coordinated with bridge 6869, being delivered with a pavement project |
65 | 6 | 9180 | Mower County Road 45 | I-90 | Replace | 2023 | $3,700,000 | Being delivered with a pavement project |
65 | 1 | 9789 | I-35 | Near Highway 48 | Replace | 2024 | $4,000,000 | Being replaced with bridge 9790 |
65 | 1 | 9790 | I-35 | Near Highway 48 | Replace | 2024 | $5,000,000 | Being replaced with bridge 9789 |
65 | 4 | 5854 | US Hwy 10 Westbound | South Bridge Buffalo River | Replace | 2024 | $2,500,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 6776 | US Hwy 61 | Canadian Pacific Rail Line | Replace | 2024 | $4,600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 9063 | US Hwy 61 Southbound | Cedar Creek | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 6 | 9706 | Mower County Road 15 | I-90 | Redeck | 2024 | $800,000 | Considering overlaying the deck in 2020 with bridges 9505, 9506, 9507, 9705, 9706, 9856, 9859. Needs more investigation. |
65 | Metro | 9417 | Hwy 65 Northbound | Coon Creek | Replace | 2024 | $1,400,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 7 | 17001 | Hwy 60 | Des Moines River | Replace | 2025 | $5,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 3 | 73805 | I-94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 21815 | I-94 Westbound | Canadian Pacific Rail Line | Redeck | 2026 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 21816 | I-94 Eastbound | Canadian Pacific Rail Line | Redeck | 2026 | $600,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 4 | 4199 | US Hwy 59 | Pelican River | Replace | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27068 | Hwy 7 | Cedar Lake Trail | Redeck | 2026 | $2,300,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27572 | Hwy 62 Eastbound | Nine Mile Creek | Redeck | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Metro | 27573 | Hwy 62 Westbound | Nine Mile Creek | Redeck | 2026 | $1,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 69846 | South Boundary Ave | Over I-35 | Redeck | 2027 | $2,200,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 38007 | Hwy 61 | Over Baptism River and Tettegouche State Park Road | Redeck | 2027 | $2,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 2 | 60001 | US Hwy 2 | Over 4th St NW | Replace | 2027 | $4,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 9030 | I-535 | Over St. Louis River (Blatnik Bridge) | Replace | 2028 | Estimate Under Development | Selected prior to policy (in 2019-2028 CHIP) |
65 | 1 | 69827 | S 37th 1/2 St | Over I-35 southbound off ramp | Replace | Not Selected | $2,200,000 | N/A |
65 | 1 | 31022S | US Hwy 169 Southbound | Near Nashwauk High School | Redeck | Not Selected | $3,800,000 | N/A |
65 | 3 | 9021 | Hwy 23 Southbound | Highway 10 | Replace | Not Selected | $1,600,000 | N/A |
65 | 3 | 9022 | Hwy 23 Northbound | Highway 10 | Replace | Not Selected | $1,600,000 | N/A |
65 | 4 | 9876 | Ottertail County Road 15 | I-94 | Replace | Not Selected | $2,200,000 | Recent maintenance work performed to extend remaining service life. |
65 | 6 | 24808 | I-90 Eastbound | I-35 | Replace | Not Selected | $2,900,000 | N/A |
65 | 6 | 74801 | Hwy 30 | I-35 | Replace | Not Selected | $2,100,000 | N/A |
65 | 6 | 9093 | US Hwy 61 Southbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | Considering for possible rehabilitation with bridge 9092 |
65 | 6 | 55026 | US Hwy 52 Southbound | Over 36th Ave | Redeck | Not Selected | $700,000 | N/A |
65 | 6 | 9730 | Freeborn County Road 34 | I-90 | Replace | Not Selected | $1,900,000 | N/A |
65 | 7 | 24810 | Hwy 109 | I-90 | Replace | Not Selected | $3,100,000 | N/A |
65 | 7 | 07018 | US Hwy 14 Eastbound | North Riverfront Dr | Replace | Not Selected | $2,800,000 | Waiting to coordinate with another project on the corridor. |
65 | 7 | 9309 | Hwy 93 | Highway 169 | Replace | Not Selected | $2,300,000 | N/A |
65 | 7 | 07017 | US Hwy 14 Westbound | North Riverfront Dr | Replace | Not Selected | $2,800,000 | N/A |
65 | Metro | 19843 | I-35 Southbound | Dakota County Road 64 (205th St) | Replace | Not Selected | $3,200,000 | N/A |
65 | Metro | 27022 | Hwy 62 Eastbound | Highway 77 | Replace | Not Selected | $3,700,000 | N/A |
65 | Metro | 27201 | Hwy 55 | Lake St | Reoverlay deck surface | Not Selected | $2,300,000 | N/A |
65 | Metro | 27540 | US Hwy 169 | 13th Ave N | Replace | Not Selected | $3,300,000 | N/A |
65 | Metro | 27799R | I-94 Eastbound on Ramp | Lyndale Ave southbound | Replace | Not Selected | $9,100,000 | N/A |
65 | Metro | 27831C | I-394 Westbound on Ramp | I-94 | Replace | Not Selected | $7,000,000 | N/A |
65 | Metro | 27879 | I-35W | 3rd St | Redeck | Not Selected | $3,900,000 | N/A |
65 | Metro | 27879A | I-35W Southbound | 3rd St | Redeck | Not Selected | $1,300,000 | N/A |
65 | Metro | 27899 | I-35W | MC Railyard | Replace | Not Selected | $11,000,000 | N/A |
65 | Metro | 62029 | Hwy 36 Westbound | Fairview Ave | Replace | Not Selected | $3,400,000 | N/A |
65 | Metro | 62070 | Hwy 36 | Highway 61 | Replace | Not Selected | $6,200,000 | N/A |
65 | Metro | 62808 | I-94 Westbound | Highway 280 ramps | Replace | Not Selected | $5,200,000 | N/A |
65 | Metro | 62812 | I-94 Westbound | Highway 280 southbound | Replace | Not Selected | $3,600,000 | N/A |
65 | Metro | 82859 | I-494 Eastbound | CP/BNSF railroad and Highway 61 | Reoverlay deck surface | Not Selected | $1,400,000 | N/A |
65 | Metro | 9276 | Hwy 36 Westbound | Cleveland Avenue | Replace | Not Selected | $3,000,000 | N/A |
65 | Metro | 9277 | Hwy 36 Eastbound | Cleveland Avenue | Replace | Not Selected | $3,700,000 | N/A |
65 | Metro | 9534 | I-35E | Shepard Road | Replace | Not Selected | $3,200,000 | N/A |
60 | Metro | 9154 | Inbound Airport Road | Outbound Airport Road | Reoverlay deck surface | 2020 | $200,000 | Reoverlay deck surface with 10 other bridges |
60 | Metro | 02046 | US Hwy 10 EB | Highway 65 | Reoverlay deck surface | 2021 | $600,000 | Selected prior to policy (in 2019-2022 STIP) |
60 | Metro | 62882 | I-94 Eastbound off ramp | I-94 westbound | Replace | 2021 | $2,900,000 | Selected as part of the Rethinking I-94 project |
60 | 1 | 31012 | US Hwy 169 Northbound | Over BNSF Railroad and Depot St | Overlay deck surface | 2023 | $1,200,000 | Project includes bridges 31012, 31010 and 69064 |
60 | 6 | 9178 | I-90 Westbound | 6th St NE | Reoverlay deck surface | 2023 | $700,000 | Coordinated with bridge 9179, being delivered with a pavement project |
60 | Metro | 10022 | US Hwy 212 Eastbound | Carver County Road 36 | Overlay deck surface | 2023 | $700,000 | Selected as part of an adjacent pavement project |
60 | 1 | 9493 | US Hwy 53 Southbound | Over Highway 37 (Fayal Rd) | Replace | 2024 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 2 | 4700 | Demers Ave | Red River | Overlay deck surface | 2024 | $500,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 1 | 69082 | US Hwy 169 Northbound | Over Abandoned Road | remove | 2025 | $200,000 | Included as part of a pavement project |
60 | 1 | 9494 | US Hwy 53 Northbound | Over Highway 37 (Fayal Rd) | Replace | 2025 | $1,900,000 | Selected prior to policy (in 2019-2028 CHIP) |
60 | 1 | 69081 | US169 | Over Abandoned Road | Remove | 2025 | $200,000 | Included as part of a pavement project |
60 | 1 | 69879A | I-35 Southbound | Over Grand Ave | Replace or rehab | 2027 | $11,000,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
60 | 1 | 69818N | I-35 Northbound | Over Highway 194 Northbound | Reoverlay deck surface | Not Selected | $3,100,000 | N/A |
60 | 1 | 69818S | I-35 Southbound | Over Highway 194 Northbound | Reoverlay deck surface | Not Selected | $3,100,000 | N/A |
60 | 1 | 69841A | 21st Ave E | Over I-35 | Reoverlay deck surface | Not Selected | $400,000 | N/A |
60 | 6 | 28017 | US Hwy 61 Westbound | Mississippi River | Overlay deck surface | Not Selected | $300,000 | N/A |
60 | 7 | 52009 | Belgrade Ave/Mulberry St | Highway 169 | Reoverlay deck surface | Not Selected | $500,000 | Coordination with the City of Mankato required |
60 | 7 | 07019 | US Hwy 14 Westbound | Blue Earth County Road 3 | Overlay deck surface | Not Selected | $300,000 | Waiting to coordinate with another project on the corridor. |
60 | Metro | 02041 | Hwy 610 Westbound | Highway 47 | Reoverlay deck surface | Not Selected | $500,000 | N/A |
60 | Metro | 27072 | Hwy 47 | BNSF Railroad | Reoverlay deck surface | Not Selected | $1,900,000 | N/A |
60 | Metro | 27234 | Hwy 610 Eastbound | Highway 169 | Reoverlay deck surface | Not Selected | $400,000 | N/A |
60 | Metro | 27256 | Hwy 55 Eastbound | UP Railroad | Reoverlay Deck surface | Not Selected | $400,000 | N/A |
60 | Metro | 27798 | I-394 Westbound on ramps | I-94 | Reoverlay deck surface | Not Selected | $300,000 | N/A |
60 | Metro | 27890 | I-694 Westbound off ramp | Highway 252 southbound | Reoverlay deck surface | Not Selected | $300,000 | N/A |
60 | Metro | 27891 | I-694 | Highway 252 southbound | Reoverlay deck surface | Not Selected | $1,600,000 | N/A |
60 | Metro | 27909 | I-94 Eastbound | Shingle Creek | Replace | Not Selected | $2,300,000 | N/A |
60 | Metro | 27926 | I-694 Eastbound | Shingle Creek | Replace | Not Selected | $1,400,000 | N/A |
60 | Metro | 6804 | US Hwy 169 | Highway 21 | Replace | Not Selected | $4,600,000 | N/A |
60 | Metro | 70006 | Hwy 901B Eastbound | UP Railroad | Reoverlay deck surface | Not Selected | $400,000 | N/A |
60 | Metro | 82034A | I-494 Westbound on Ramp | BNSF Railroad/ CP Railroad | Reoverlay deck surface | Not Selected | $1,700,000 | N/A |
60 | Metro | 82037 | Ramp I-494 Eastbound tO US Hwy 61 southbound | BNSF Railroad/ CP Railroad | Reoverlay deck surface | Not Selected | $1,000,000 | N/A |
60 | Metro | 82860 | I-494 Westbound | US Hwy 61, CP/BNSF Railroad | Reoverlay deck surface | Not Selected | $1,100,000 | N/A |
60 | Metro | 9431 | Hwy 100 | W 70th St | Reoverlay deck surface | Not Selected | $1,100,000 | N/A |
55 | 1 | 09006 | Hwy 210 | Over BNSF Railroad | Redeck | 2021 | $1,300,000 | Selected prior to policy (in 2019-2022 STIP) |
55 | 1 | 5923 | Hwy 61 | Over Pigeon River | Redeck | 2023 | $2,200,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 1 | 9788 | I-35 | St. Louis River | Replace | 2025 | $2,000,000 | Being replaced with bridge 9787 |
55 | 7 | 53809 | Nobles County Road 15 | I-90 | Replace | 2025 | $1,900,000 | Coordinating with another MnDOT project. |
55 | Metro | 27831 | I-394 | Dunwoody Blvd | Redeck | 2026 | $42,000,000 | Early project development work indicates work type may be overlay of deck surface and not deck replacement. If so, score increases to 90 and cost decreases. |
55 | Metro | 6805 | Hwy 280 | Robbins St / U of M Transitway | Replace | 2026 | $32,000,000 | Coordinated with pavement project |
55 | Metro | 7264 | Hwy 62 Westbound | Valley View Road | Replace | 2026 | $2,100,000 | Coordinated with pavement project |
55 | 8 | 42006 | Hwy 23 | Redwood River | Replace | 2027 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 1 | 69018 | US Hwy 53 Northbound | Over Whiteface River | Replace | 2029 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
55 | 3 | 5907 | Hwy 27 | Mississippi River | Replace | Not Selected | $12,000,000 | N/A |
55 | 6 | 66807 | Rice County Road 3 | I-35 | Replace | Not Selected | $2,400,000 | N/A |
55 | Metro | 9893 | I-94 | Franklin Terrace | Replace | Not Selected | $6,600,000 | N/A |
53 | Metro | 27792 | I-394 | I-94 | Replace | 2026 | $22,000,000 | Minor repairs performed in 2017 to get to replacement in 2026 |
50 | Metro | 9306 | Hwy 5 Westbound on Ramp | Bloomington Rd | Reoverlay deck surface | 2020 | $300,000 | Reoverlay deck surface with 10 other bridges |
50 | Metro | 4190 | Hwy 55 | Minnesota River | Reoverlay deck surface | 2022 | $7,100,000 | Selected prior to policy (in 2019-2022 STIP) |
50 | Metro | 19033 | US Hwy 52 Southbound | Vermillion River | Reoverlay deck surface | 2023 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
50 | Metro | 27193 | Hwy 7 | Minnehaha Creek | Reoverlay deck surface | 2026 | $400,000 | Minor repairs |
50 | 1 | 69879D | I-35 Southbound On Ramp | Over 57th Ave W | Replace or rehab | 2027 | $800,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E |
50 | 1 | 58808 | I-35 Northbound | Over Kettle River | Overlay deck surface | Not Selected | $600,000 | N/A |
50 | 1 | 58807 | I-35 Southbound | Over Kettle River | Overlay deck surface | Not Selected | $600,000 | N/A |
50 | 1 | 69019 | US Hwy 53 Northbound | Over Paleface River | Replace | Not Selected | $1,200,000 | N/A |
50 | 6 | 24815 | I-90 Westbound | Over Ditch/Creek Near School Section Lake | Reoverlay deck surface | Not Selected | $800,000 | N/A |
50 | 6 | 24816 | I-90 Eastbound | Over Ditch/Creek Near School Section Lake | Reoverlay deck surface | Not Selected | $800,000 | N/A |
45 | 1 | 69801J | I-535 Northbound Seg 1 | Southbound off ramp To I-35 | Replace | 2020 | $3,300,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69801F | I-535 Southbound Seg 1 | Ramp To I-35 southbound | Replace | 2020 | $5,600,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69801C | I-535 Southbound On Ramp | Over BNSF Railyard | Replace | 2020 | $4,500,000 | Included in phase 2 of Twin Ports Interchange project |
45 | 1 | 69824 | I-535 Southbound On Ramp | I-535 /I-35 northbound | Replace | 2020 | $9,700,000 | Included in phase 1 of Twin Ports Interchange project. |
45 | 1 | 69825 | I-535 Northbound Off Ramp | BNSF railroad | Replace | 2020 | $5,900,000 | Included in Phase 1 of Twin Ports Interchange project. |
45 | 1 | 69801K | I-535 Northbound Off Ramp | I-35 southbound | Replace | 2020 | $4,000,000 | Included in Phase 2 of Twin Ports Interchange project. |
45 | Metro | 02010 | US Hwy 10 | Main St | Replace | 2021 | $4,000,000 | Selected prior to policy (in 2019-2022 STIP) |
45 | Metro | 9716 | US Hwy 10 | Anoka County Road 7/7th Ave | Replace | 2022 | $3,000,000 | Selected prior to policy (in 2019-2022 STIP) |
45 | Metro | 9675 | US Hwy 52 Northbound | Vermillion River | Replace | 2023 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
45 | 7 | 07003 | Hwy 60 | Blue Earth County Road 6 | Replace | 2024 | $4,600,000 | Selected prior to policy (in 2019-2028 CHIP), also coordinating with another project |
45 | Metro | 9717 | US Hwy 10 | BNSF railroad | Replace | 2024 | $7,400,000 | Coordinated with Rum River project |
45 | Metro | 9779 | Hwy 13 Southbound | I-35W | Replace | 2025 | $3,800,000 | Selected due to low clearance and repetitive bridge hits |
45 | Metro | 9780 | Hwy 13 Northbound | I-35W | Replace | 2025 | $3,800,000 | Selected due to low clearance and repetitive bridge hits |
45 | Metro | 62844 | Hwy 280 Northbound | Highway 280 southbound | Replace | 2026 | $3,600,000 | Coordinated with pavement project |
45 | Metro | 27831D | I-394 Eastbound off Ramp | I-94 | Replace | 2026 | $7,200,000 | Substructure repair completed in 2019 to get to replacement in 2026 |
45 | 1 | 69020 | US Hwy 53 Southbound | Saint Louis River | Redeck | 2027 | $1,000,000 | N/A |
45 | Metro | 19807 | I-35 Southbound | Dakota County Road 50 | Replace | Not Selected | $2,400,000 | N/A |
45 | Metro | 27021 | Hwy 62 Westbound | Highway 77 | Replace | Not Selected | $3,700,000 | N/A |
45 | Metro | 27793 | I-94 Northbound off Ramp | I-94 Ramp to southbound Lyndale | Replace | Not Selected | $4,200,000 | N/A |
45 | Metro | 27848 | I-94 Westbound | I-35W southbound on ramp | Replace | Not Selected | $9,000,000 | N/A |
45 | Metro | 27850 | I-94 Westbound on Ramp | I-35W southbound on ramp | Replace | Not Selected | $4,800,000 | N/A |
45 | Metro | 62030 | Hwy 36 Eastbound | Fairview Avenue | Replace | Not Selected | $4,200,000 | N/A |
45 | Metro | 9108 | US Hwy 52 Northbound | UP Railroad | Replace | Not Selected | $2,300,000 | N/A |
45 | Metro | 9110 | Hwy 55 Eastbound | Highway 52 northbound | Replace | Not Selected | $3,700,000 | N/A |
45 | Metro | 9538 | Hwy 110 Eastbound | I-35E | Replace | Not Selected | $4,000,000 | N/A |
45 | Metro | 9569 | Hwy 36 Westbound | I-35W | Replace | Not Selected | $6,400,000 | N/A |
40 | 1 | 69808A | I-535 Northbound On Ramp | Over Garfield Ave and railroad | Overlay deck surface | 2020 | $800,000 | Being replaced as part of Twin Ports Interchange |
40 | 1 | 69809 | I-535 Southbound Off Ramp | Over BNSF railroad | Overlay deck surface | 2020 | $1,700,000 | Being replaced as part of Twin Ports Interchange |
40 | 1 | 69810 | I-535 | Over BNSF railroad | Overlay deck surface | 2020 | $900,000 | Being rehabbed as part of Twin Ports Interchange |
40 | Metro | 10021 | US Hwy 212 Westbound | TCW railroad/Carver County Rd 36 | Overlay deck surface | 2020 | $700,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 27118 | Hwy 5 Eastbound ramp to Hwy 55 | Highway 5 westbound on ramp | Overlay deck surface | 2020 | $200,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 02035 | US Hwy 10 | Highway 47 northbound | Reoverlay deck surface | 2021 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | Metro | 02045 | US Hwy 10 Westbound | Highway 65 | Reoverlay deck surface | 2021 | $500,000 | Selected prior to policy (in 2019-2022 STIP) |
40 | 1 | 69064 | US Hwy 169 Northbound | Over BNSF railroad | Reoverlay deck surface | 2023 | $800,000 | Project includes bridges 31012, 31010 and 69064 |
40 | 1 | 31010 | US Hwy 169 Northbound | Over BNSF railroad spur | Reoverlay deck surface | 2023 | $60,000 | Project includes bridges 31012, 31010 and 69064 |
40 | 6 | 9858 | I-90 Eastbound | Root River | Overlay deck surface | 2023 | $400,000 | Being delivered with I-90 NHS pavement project |
40 | 1 | 69063 | US Hwy 169 Southbound | Over BNSF railroad | Reoverlay deck surface | 2024 | $300,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 1 | 31009 | US Hwy 169 Southbound | Over BNSF railroad spur | Reoverlay deck surface | 2024 | $300,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 1 | 31011 | US Hwy 169 Southbound | BNSF railroad and Depot St | Reoverlay deck surface | 2024 | $400,000 | Project includes bridges 31009, 31011, and 69063 |
40 | 7 | 53817 | I-90 Westbound | Highway 59 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 7 | 53818 | I-90 Eastbound | Highway 59 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 7 | 53821 | Nobles County Road 3 | I-90 | Overlay deck surface | 2025 | $300,000 | Selected prior to policy (in 2019-2028 CHIP) |
40 | 1 | 69879C | I-35 Northbound On Ramp | Over 59th Ave W | Replace or rehab | 2027 | $1,300,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
40 | 1 | 69887 | I-35 | Between Garfield Ave and Jeno's Walk | Replace | Not Selected | $52,000,000 | N/A |
40 | 3 | 73864 | Stearns County Highway 138 | I-94 | Overlay deck surface | Not Selected | $500,000 | N/A |
40 | 3 | 86810 | Wright County Road 111 | I-94 | Overlay deck surface | Not Selected | $400,000 | N/A |
40 | 3 | 86808 | Under Grover Ave NW | I-94 | Overlay deck surface | Not Selected | $400,000 | N/A |
40 | 3 | 73852 | Stearns Couny Highway 136 | I-94 | Overlay deck surface | Not Selected | $400,000 | N/A |
40 | 6 | 79003 | US Hwy 61 Southbound | East Indian Creek | Overlay deck surface | Not Selected | $500,000 | N/A |
40 | 6 | 24824 | Freeborn County Road 19 | I-35 | Overlay deck surface | Not Selected | $800,000 | N/A |
40 | 7 | 24809 | Freeborn County Road 61 | I-90 | Overlay deck surface | Not Selected | $400,000 | N/A |
40 | 7 | 32814 | Jackson County Road 85 | I-90 | Overlay deck surface | Not Selected | $700,000 | N/A |
40 | 7 | 52007 | Nicollet County Highway 117 | Highway 14 | Overlay deck surface | Not Selected | $1,100,000 | N/A |
40 | 7 | 46815 | I-90 Westbound | Lily Creek | Overlay deck surface | Not Selected | $100,000 | N/A |
40 | 7 | 46816 | I-90 Eastbound | Lily Creek | Reoverlay deck surface | Not Selected | $100,000 | N/A |
40 | 7 | 32816 | Jackson County Road 67 | I-90 | Overlay deck surface | Not Selected | $600,000 | N/A |
40 | 7 | 32818 | Jackson County Road 67 | I-90 | Overlay deck surface | Not Selected | $700,000 | N/A |
40 | 7 | 32805 | Jackson County Road 17 | I-90 | Overlay deck surface | Not Selected | $600,000 | N/A |
40 | 7 | 46811 | I-90 Westbound | Highway 263 | Overlay deck surface | Not Selected | $400,000 | N/A |
40 | 7 | 67811 | 200th Ave | I-90 | Overlay deck surface | Not Selected | $600,000 | N/A |
40 | 7 | 46813 | Martin County Road 130 | I-90 | Overlay deck surface | Not Selected | $600,000 | N/A |
40 | 7 | 07037 | US Hwy 169 | Blue Earth River | Overlay deck surface | Not Selected | $300,000 | Will consider with 2027 pavement project |
40 | 7 | 46824 | Martin County Road 59 | I-90 | Reoverlay deck surface | Not Selected | $500,000 | N/A |
35 | Metro | 6850 | I-494 Westbound | I-35W | Replace | 2023 | $2,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
35 | Metro | 27794 | I-394 Eastbound off Ramp | I-94 Ramp to southbound Lyndale | Replace | 2026 | $3,400,000 | Selected prior to policy (in 2019-2028 CHIP) |
35 | 1 | 58801 | Hwy 70 | Over I-35 | Replace | Not Selected | $2,000,000 | N/A |
35 | 1 | 31022N | US Hwy 169 Northbound | Near Nashwauk Highschool | Redeck | Not Selected | $3,400,000 | N/A |
35 | 7 | 67810 | Rock County Road 3 | I-90 | Replace | Not Selected | $1,600,000 | N/A |
35 | 7 | 9774 | Rock County Road 6 | I-90 | Replace | Not Selected | $2,000,000 | N/A |
30 | 6 | 9890 | US Hwy 63 Northbound | I-90 | Replace | 2020 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 9889 | US Hwy 63 Southbound | I-90 | Replace | 2020 | $2,700,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 85816 | I-90 Eastbound | Dakota Valley Road | Replace | 2020 | $1,800,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 6 | 9414 | US Hwy 52 Southbound | Zumbro River | Replace | 2021 | $2,300,000 | Selected prior to policy (in 2019-2022 STIP) |
30 | 3 | 73875 | I-94 Westbound | BNSF railroad | Replace | 2022 | $1,600,000 | Coordinate with bridge 73876 |
30 | 3 | 6896 | I-94 Eastbound | Sauk River | Replace | 2024 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 07036 | Hwy 22 | Over railroad | Overlay deck surface | 2024 | $400,000 | Coordinated with pavement project |
30 | Metro | 5891 | Hwy 55 | CP railroad | Replace | 2024 | $7,100,000 | Coordinated with pavement project |
30 | 3 | 71002 | US Hwy 169 Northbound | Highway 10 | Replace | 2025 | $3,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73818 | I-94 Eastbound Off Ramp | I-94 | Replace | 2025 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73850 | I-94 Eastbound | Highway 238 | Replace | 2025 | $2,100,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 6897 | I-94 Eastbound | Sauk River | Replace | 2025 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 86807 | Hwy 24 | I-94 | Replace | 2025 | $3,200,000 | N/A |
30 | 3 | 73811 | I-94 Westbound | Sauk River | Replace | 2026 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 52008 | US Hwy 169 | Highway 169 southbound on ramp | Reoverlay deck surface | 2026 | $200,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 7 | 52012 | US Hwy 169 | Highway 169 northbound exit ramp | Reoverlay deck surface | 2026 | $400,000 | Selected prior to policy (in 2019-2028 CHIP) |
30 | 3 | 73809 | I-94 Westbound | Sauk River | Replace | Not Selected | $1,800,000 | N/A |
30 | 3 | 05003 | Hwy 15 Eastbound | Highway 10 | Replace | Not Selected | $2,800,000 | N/A |
30 | 6 | 6640 | Hwy 21 | Cannon River | Replace | Not Selected | $3,600,000 | N/A |
30 | Metro | 19819 | Hwy 55 | I-35E southbound on ramp | Redeck | Not Selected | $8,600,000 | N/A |
30 | Metro | 27169 | Hwy 55 Westbound | Highway 5 Eastbound on Ramp | Replace | Not Selected | $2,600,000 | N/A |
30 | Metro | 9500 | Hwy 100 | Highway 62 | Replace | Not Selected | $10,000,000 | N/A |
29 | 7 | 07011 | US Hwy 14 | Minnesota River and Union Pacific railroad | Replace | Not Selected | $24,000,000 | N/A |
20 | 6 | 9659 | US Hwy 52 Southbound | Highway 60 | Replace | 2021 | $2,200,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9660. |
20 | 4 | 76004 | US Hwy 12 | Cottonwood Creek | Replace | 2023 | $1,200,000 | Being replaced due to channel span design and load rating |
20 | 4 | 76003 | US Hwy 12 | Chippewa River | Replace | 2023 | $1,200,000 | Being replaced due to channel span design and load rating |
20 | 1 | 38008 | Hwy 61 | Over Crow Creek | Redeck | 2024 | $1,700,000 | Pushed back from 2019 |
20 | 3 | 5428 | US Hwy 71 | Sauk River | Replace | 2024 | $2,600,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 9705 | Mower County Road 1 | I-90 | Redeck | 2024 | $800,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 55809 | I-90 Westbound | Highway 52 | Replace | 2024 | $4,500,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | 6 | 55810 | I-90 Eastbound | Highway 52 | Replace | 2024 | $3,700,000 | Selected prior to policy (in 2019-2022 STIP but delayed) |
20 | Metro | 6817 | Hwy 65 Southbound | Coon Creek | Replace | 2024 | $700,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | Metro | 82855 | I-494 | Mississippi River | Overlay deck surface | 2024 | $3,500,000 | Resurfacing to extend remaining service life |
20 | Metro | 82856 | I-494 | Mississippi River | Overlay deck surface | 2024 | $3,500,000 | Resurfacing to extend remaining service life |
20 | 3 | 73820 | I-94 Eastbound | Stearns County Road 184 | Replace | 2025 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 9106 | Hwy 76 | Money Creek | Replace | 2028 | $2,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 6 | 5848 | Hwy 16 | Crystal Creek | Replace | 2028 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
20 | 3 | 73849 | I-94 Westbound | Highway 238 | Replace | Not Selected | $2,100,000 | N/A |
20 | 6 | 9092 | US Hwy 61 Northbound | Pleasant Valley Creek | Replace | Not Selected | $2,100,000 | N/A |
20 | 6 | 9046 | US Hwy 61 Southbound | Burns Creek | Replace | Not Selected | $2,000,000 | N/A |
20 | 6 | 9727 | I-90 Westbound | Freeborn County Road 46 | Redeck | Not Selected | $1,100,000 | N/A |
20 | 6 | 55025 | US Hwy 52 Northbound | Over 36th Ave | Redeck | Not Selected | $700,000 | N/A |
20 | 6 | 85815 | I-90 Westbound | Winona County Road 101 | Replace | Not Selected | $1,600,000 | N/A |
20 | 7 | 22812 | Faribault County Road 19 | I-90 | Redeck | Not Selected | $1,000,000 | N/A |
20 | 7 | 22819 | Faribault County Road 31 | I-90 | Redeck | Not Selected | $1,200,000 | N/A |
20 | 8 | 43008 | US Hwy 212 Eastbound | Buffalo Creek | Replace | Not Selected | $1,800,000 | N/A |
20 | Metro | 27171 | Hwy 55 Westbound | Bloomington Rd | Replace | Not Selected | $1,800,000 | N/A |
20 | Metro | 82001 | US Hwy 8 | 2nd St NW | Replace | Not Selected | $5,400,000 | N/A |
20 | Metro | 82002 | US Hwy 8 | Highway 61 | Replace | Not Selected | $6,400,000 | N/A |
18 | 1 | 69882N | I-35 Northbound | South of Garfield Ave near BNSF railroad | Replace | 2020 | $18,000,000 | Included in phase 1 of Twin Ports Interchange project. |
18 | 1 | 69881N | I-35 Southbound | South of Garfield Ave near BNSF railroad | Replace | 2020 | $18,000,000 | Included in phase 1 of Twin Ports Interchange project. |
10 | 6 | 85814 | Mower County Road 12 | I-90 | Replace | 2020 | $2,500,000 | Selected prior to policy (in 2019-2022 STIP) |
10 | Metro | 27766 | Hwy 5 Eastbound | I-494 | Redeck | 2020 | $300,000 | Selected prior to policy (in 2019-2022 STIP) |
10 | 7 | 53815 | I-90 Westbound | Rowe Ave | Replace | 2025 | $2,700,000 | Selected prior to policy (in 2019-2028 CHIP) |
10 | 3 | 3355 | US Hwy 169 | White Fish Creek | Redeck | Not Selected | $120,000 | N/A |
10 | 6 | 24807 | I-90 Westbound | I-35 | Replace | Not Selected | $2,900,000 | N/A |
10 | 6 | 6765 | US Hwy 65 Northbound | Main St | Replace | Not Selected | $2,300,000 | N/A |
10 | 7 | 07023 | US Hwy 14 | Highway 169 | Redeck | Not Selected | $3,300,000 | N/A |
10 | 7 | 46801 | Martin County Road 7 | I-90 | Redeck | Not Selected | $900,000 | N/A |
10 | 7 | 53813 | I-90 Westbound | Nobles County Road 25 | Replace | Not Selected | $2,500,000 | N/A |
10 | 7 | 46832 | Martin County Road 23 | I-90 | Redeck | Not Selected | $1,000,000 | N/A |
10 | 7 | 32801 | Jackson County Road 5 | I-90 | Redeck | Not Selected | $1,000,000 | N/A |
10 | 7 | 22811 | Hwy 254 | I-90 | Redeck | Not Selected | $1,300,000 | N/A |
10 | 7 | 53814 | I-90 Eastbound | Nobles County Road 25 | Replace | Not Selected | $2,500,000 | N/A |
10 | Metro | 62847 | I-94 | Fairview Avenue | Replace | Not Selected | $6,600,000 | Will be evaluated as part of the Rethinking I-94 project |
10 | Metro | 7265 | Hwy 62 Eastbound | Valley View Road | Replace | Not Selected | $2,100,000 | N/A |
0 | 1 | 69881 | I-35 Southbound | South of Garfield Ave Near BNSF Rail | Replace | 2020 | $7,000,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801I | I-535 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,800,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69801M | I-535 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $2,300,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69882A | I-35 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,700,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801A | I-535 Southbound Off Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,500,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801E | I-535 Southbound Off Ramp | Over fill near BNSF rail yard | Replace | 2020 | $2,700,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69801L | I-535 Northbound Seg 2 | Over I-35 southbound | Replace | 2020 | $1,900,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69881A | I-35 Southbound Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,800,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69882B | I-35 Northbound On Ramp | Over fill near BNSF rail yard | Replace | 2020 | $1,400,000 | Included in phase 1 of Twin Ports Interchange project. |
0 | 1 | 69801H | I-535 Northbound On Ramp | Over I-35 southbound and northbound off ramp | Replace | 2020 | $2,300,000 | Included in phase 2 of Twin Ports Interchange project. |
0 | 1 | 69010 | US Hwy 53 Northbound | Over 6th Ave W | Redeck | 2021 | $100,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 1 | 69802B | US Hwy 53 Southbound on Ramp | 21st Ave on ramp | Replace | 2021 | $2,000,000 | Part of Twin Ports Interchange project |
0 | 1 | 6902E | US Hwy 53 Southbound off Ramp | Over fill near BNSF rail yard | Replace | 2021 | $2,000,000 | Part of Twin Ports Interchange project |
0 | 1 | 69009 | US Hwy 53 Southbound | Over 6th Ave W | Replace | 2021 | $2,000,000 | Selected prior to policy (in 2019-2022 STIP) |
0 | 6 | 9660 | US Hwy 52 Northbound | Highway 60 | Replace | 2021 | $1,600,000 | Selected prior to policy (in 2019-2022 STIP). Coordinated with bridge 9659 |
0 | 3 | 6870 | I-94 Eastbound | Sauk River | Replace | 2025 | $1,800,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | 7 | 52011 | US Hwy 169 Ramp | Highway 169 Ramp | Reoverlay deck surface | 2026 | $200,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | Metro | 6894 | Hwy 280 | BNSF Railroad/Energy Park Dr | Replace | 2026 | $12,000,000 | Coordinated with pavement project |
0 | 1 | 69879B | I-35 Southbound Off Ramp | Over fill south of Roosevelt St | Replace/rehab | 2027 | $1,200,000 | Project includes bridges 69879, 69879A, 69879B, 69879C, 69879D, and 69879E ($44.1 million) |
0 | 7 | 22814 | Hwy 22 | I-90 | Replace | 2027 | $4,000,000 | Selected prior to policy (in 2019-2028 CHIP) |
0 | 3 | 73807 | I-94 Westbound | Highway 4 | Replace | Not Selected | $1,600,000 | N/A |
0 | 6 | 9449 | US Hwy 61 | East 5th St | Replace | Not Selected | $3,400,000 | N/A |
0 | 6 | 55815 | I-90 Westbound | Olmsted County Road 10 | Replace | Not Selected | $2,200,000 | N/A |
0 | 6 | 9045 | US Hwy 61 Northbound | Burns Creek | Replace | Not Selected | $2,000,000 | N/A |
0 | Metro | 27831A | I-394 Westbound on Ramp | Dunwoody Blvd | Replace | Not Selected | $1,600,000 | N/A |
0 | Metro | 27831B | I-394 Eastbound off Ramp | Dunwoody Blvd | Replace | Not Selected | $2,200,000 | N/A |
0 | Metro | 9605 | US Hwy 10 | I-35W | Replace | Not Selected | $5,600,000 | N/A |