Increasing the transparency of how we select highway construction projects

National Highway System pavement projects

MnDOT District 1

Scoring criteria for national highway system pavement projects. Out of 100 possible points, 60 points are based on the timing of the improvement, 10 points are based on traffic volume, 10 points are based on truck volume, 10 points are based on other infrastructure needs, 5 points are based on network designation, and 5 points are based on the miles covered by the project.

Learn more about how MnDOT evaluates and selects pavement projects

MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.

Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.

Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.

What's was selected

Related links

How the projects scored

The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).

Last updated October 2022

Score Route  Year Planned (FY) Description High Level Cost Estimate for Planning Purposes  Comments
96 I35 2029-2031 Reconstruct I-35 from .5 miles south of Boundary Ave to bridge over Hwy 23 $285,000,000 6982-1072803
95 I35 2028 Resurface I-35 under the 5th Ave W bridge and from Hwy 23 to 50th Ave W in Duluth $1,350,000 6982-344
92 MN61 2025 On State Highway 61, in Duluth, from 26 Ave E. to just north of. 60th Ave. E., construct roundabout at 26th , 40th & 60th Ave. E., resurface pavement and install trail. $14,153,469 6925-145
92 US169 2030 Resurface Hwy 169 from 13th St SW to Hwy 2 $3,000,000 3115-1038336
92 US169 2032 Resurface Hwy 169 from 10th Ave NE in Grand Rapids to Morrison Ave in Coleraine $10,361,000 3116-155
91 I535 Not Selected Resurface I-535 from railroad bridge to Jct I-35/Hwy 53  $730,000 Partially covered by Twin Ports Interchange project
88 I35 2025 Northbound and Southbound I-35 in Duluth Repair concrete pavement and interchange ramps from Lake Ave to 0.7 miles South of 21st Ave E. $1,900,000 6982-336
88 US53 2031 Resurface Hwy 53 NB from north of Swan Lake Rd to just south of Cemetery Rd $9,795,000 6917-140
88 US53 Not Selected Resurface Hwy 53 from just north of wayside rest to the Rice River bridge  $7,100,000 Cost is greater than available budget
87 US53 2024 Resurface Hwy 53 from 2nd Ave NW to just north of the wayside rest in Virginia and resurface 7 ramps at the Hwy 169/Hwy 53 intersections $7,475,000 6918-102
85 US169 2024 Resurface northbound Hwy 169 from just west of CR 67 to CR 109 and southbound Hwy 169 from just north of CR 5 to just south of CR 109 and rehabilitate 3 bridges . $17,900,000 6935-94
84 US2 Not Selected Resurface Hwy 2 from just east of Itasca County Road 62 to just west of 10th Ave NW  $3,000,000 Waiting to avoid simultaneous or multiple years of detours in the same area
83 US169 Not Selected Resurface Hwy 169 from just northeast of old Hwy 169 to Hwy 73  $6,740,000 Crack sealed in 2022; Cost is greater than available budget.
83 US53 2024 Resurface Hwy 53 from Hwy 37 to Vermillion Dr $2,944,000 6918-100
82 MN33 Not Selected Resurface Hwy 33 from  just north of Carlton County Road 116 to 1.5 miles south of Hwy 2  $5,270,000 Chip sealed in 2022
82 MN61 2028 Resurface NB Hwy 61 from CR 33 (McQuade Rd) to CR 42 (Homestead Rd) and SB Hwy 61 from CR 33 (McQuade Rd) to Knife River $6,089,000 6926-56
82 US169 2028 Resurface Hwy 169 from CR 97/Crystal Springs Rd  to 13th St SW in Grand Rapids $4,000,000 3115-129
82 US53 Not Selected Resurface Hwy 53 from St Louis County Road 682/691 to the St Louis River bridge  $4,580,000 Cost is greater than available budget
81 MN61 2031 Resurface Hwy 61 from 2.6 miles north CR 6 to 1.4 Miles south of CR 79 $10,015,000 1601-66
81 US169 Not Selected Resurface Hwy 169 from 8th Ave E to just south of St. Louis County 92  $1,110,000 District does not expect pavement segment(s) to deteriorate as fast as model predicts.
81 US53 2028 Resurface Hwy 53 from just north of Piedmont Ave to just south of Mall Dr $4,230,000 6915-139
80 MN33 Not Selected Resurface Hwy 33 from 1.5 miles south of Hwy 2 to railroad bridge  $2,990,000 Chip sealed in 2022
80 US53 2029 Resurface NB Hwy 53 from 1.1 miles south of CR 52 to Bridge 69019 $2,058,000 6917-1038383
78 MN61 2028 Resurface Hwy 61 from just south of CR 14 to Reservation Bay Rd  $14,573,000 1603-54
78 MN61 2028 Resurface Hwy 61 from just north of 60th Ave E to just north of Superior St $1,060,000 6925-147
77 I35 Not Selected Resurface I-35 from north of tunnel to Hwy 61/London Rd  $1,590,000
77 MN61 2024 Highway 61 North and South Bound In Duluth 0.12 miles North of Superior St to County Rd 33/Mcquade. Resurface roadway $3,100,000 6925-144
77 US2 Not Selected Resurface Hwy 2 from just west of Floodwood to St Louis County Road 845  $9,050,000
76 US53 Not Selected Resurface Hwy 53 from just south of Cook to south limits of Cook  $170,000
75 I535 Not Selected Resurface I-535 from Blatnik bridge to railroad bridge  $360,000
75 MN33 Not Selected Resurface Hwy 33 from I-35 to roundabout  $250,000
75 US169 Not Selected Resurface Hwy 169 from Pokegama Lake bridge to 13th St SW  $3,160,000
75 US71 Not Selected Resurface Hwy 71 from Hwy 11 to Hwy 53/2nd Ave W  $40,000
74 MN210 Not Selected Resurface Hwy 210 from railroad bridge to just east of I-35  $9,770,000
73 MN23 2030 Resurface Hwy 23 from Hwy 107 to I-35 $5,292,000 5801-1039097
73 US2 2030 Resurface Hwy 2 from just west of Pincherry Rd to E Bass Lake Rd $2,684,000 3103-1038975
73 US53 2032 Resurface NB Hwy 53 from CR 13 to 1.6 miles north of Hwy 33 $21,974,000 6916-116
72 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County Road 5 to just south of Saint Louis County Road 5  $1,760,000 Crack sealed in 2022
71 US2 Not Selected Resurface Hwy 2 from just east of Hwy 200 to just west of Floodwood  $6,670,000
70 MN61 2027 Repair Highway 61 in locations between Two Harbors and just south of CR 5 in Silver Bay $1,945,000 3804-64
70 US53 Not Selected Resurface Hwy 53 from Little Fork River bridge just north of Saint Louis County Road  901  $26,530,000
69 US169 Not Selected Resurface Hwy 169 from just north of Saint Louis County 7 to Hwy 53  $600,000
69 US2 Not Selected Resurface Hwy 2 from 5th St SW to just east of Deer River  $200,000
68 MN11 Not Selected Resurface Hwy 11 from Hwy 71 to just east of Hwy 71  $100,000
68 MN61 2032 Resurface Hwy 61 from 1.3 miles south of Cutface Creek to just south of UT 89  $2,582,000 1602-54
68 MN61 Not Selected Resurface Hwy 61 from just north of bridge 91367 to just north of Palisade Creek  $1,940,000
68 US169 2027 Resurface Hwy 169 from just south of the Aitkin/Itasca County line to CR 437 $9,477,000 3115-128
67 MN61 2029 Concrete pavement repair on Hwy 61 from just south of the Silver Creek Tunnel to just north of the Silver Creek Tunnel and from just north of Crow Creek to just north of Gooseberry River $2,886,000 3805-111
67 MN61 2032 Resurface Hwy 61 from 1.2 miles north of the Gooseberry River to 0.85 miles south of the Split Rock River and 1.3 miles north of CR 22 to Beaver Bay Bridge $3,957,000 3806-72
65 I35 2028 Repair I-35 concrete in locations between north of Hinckley to Hwy 53 $2,500,000 5880-203
65 US53 Not Selected Resurface Hwy 53 from just south of Hwy 33 to Hwy 33 NB  $100,000
62 US53 Not Selected Resurface Hwy 53 from south limits of Cook to Little Fork River bridge  $770,000
61 MN33 Not Selected Resurface Hwy 33 from railroad bridge to Hwy 53  $10,160,000 Chip sealed in 2022
60 US2 2023 Highway 2 from Highway 65 to Highway 200 Resurface Highway and Junction of Highway 2 and Highway 65 in Swan River, Construct Roundabout, Turn Lanes. Safety Improvements     $6,600,000 3104-62 Selected prior to policy (in 2019-2022 STIP); 
58 MN61 Not Selected Resurface Hwy 61 from Beaver Bay bridge to just north of bridge 91367  $1,780,000
58 US2 2023 Resurface US 2 from just west of CR 874 to Hwy 194 and construct a roundabout at US 2/Hwy 194 $3,744,750 6908-61
46 I35 2029 Resurface NB and SB I-35 from the north end of the Hwy 210 bridge to the north end of the St Louis River bridge $6,219,000 0980-1038133
46 US2 Not Selected Resurface Hwy 2 from north end of grass median to I-35  $90,000
41 MN194 Not Selected Resurface Hwy 194 from just north of Mesaba Ave to Superior St  $1,240,000
41 MN33 Not Selected Repair Hwy 33 concrete pavement from roundabout to just north of Doddridge Ave  $690,000
39 US53 2031 Resurface SB Hwy 53 from just north of Hwy 169 to Rice River bridge $6,332,000 6920-57
30 US53 Not Selected Resurface Hwy 53 from 1.64 miles north of Hwy 33 to 1.1 miles south of St. Louis County Road 52  $2,560,000
27 MN61 Not Selected Resurface Hwy 61 from 1 mile north of Crow Creek to just south of Lake County Road 1  $2,070,000
25 US53 Not Selected Resurface Hwy 53 from 4th St to just north of Piedmont Ave  $580,000