Urban non-freeway/non-expressway pavement projects
MnDOT District 4
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.
Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.
For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.
Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 4 project selection
- District 4 National Highway System pavement projects
- District 4 Non-National Highway System pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated October 2021
Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
79 | US10 | Moorhead | Reconstruction from US75 to 10th St | $3,500,000 | Not Selected | To be turned back to the City of Moorhead |
79 | MN29 | Alexandria | Reconstruction from 2nd Ave to McKay Ave | $12,900,000 | 2029 | |
78 | MN29 | Alexandria | Thick mill and overlay from 50th Ave to 18th Ave | $2,500,000 | Not Selected | Disagree With RQI Trends |
73 | US75 | Breckenridge | Reconstruction from Beede Ave to MN210 | $5,300,000 | Not Selected | Disagree With RQI Trends |
70 | MN87 | Frazee | Reconstruction from US10 to River Dr in Frazee | $5,800,000 | 2022 | |
69 | MN27 | Wheaton | Medium mill and overlay from US75 to 1st S | $200,000 | 2027 | |
68 | MN27 | Herman | Reconstruction from Grant County Road 7 to Grant County Road 11 | $8,200,000 | 2029 | |
68 | MN29 | Alexandria | Medium mill and overlay from Douglas County Road 28 to 50th Ave | $1,500,000 | Not Selected | Disagree With RQI Trends |
68 | MN210 | Fergus Falls | Medium mill and overlay from I-94 to Otter Tail County Road 82 | $1,200,000 | Not Selected | Disagree With RQI Trends |
65 | MN28 | Browns Valley | Thin mill and overlay from Traverse County Road 106 to Jackson St | $200,000 | Not Selected | |
65 | US10/US75 | Moorhead | Reconstruction on US10 from State line to US75 and on US75 from 24th to US10 | $22,000,000 | 2026 | |
65 | US10/US76 | Moorhead | Reconstruction on US10 from 13th St to 34th St and on US75 from US10 to 2nd Ave | $20,100,000 | 2028 | |
64 | MN55 | Barrett | Reconstruction from Park St to US59 | $4,700,000 | Not Selected | |
64 | MN7/MN119/US59 | Appleton | Reconstruction on MN7 from 1st St to Haven St, on MN119 from Prison entrance to US59 and on US59 from MN119 to Range St | $15,700,000 | Not Selected | |
63 | MN108/US59 | Pelican Rapids | Reconstruction on MN108 from US59 to Ann Ln and on US59 from 5th Ave SE to Otter Tail County Road 9 | $12,000,000 | 2024 | |
62 | US10 | Dilworth | Reconstruction from 34th St to 7th St | $17,700,000 | 2027 | |
61 | MN9/MN29/US12 | Benson | Reconstruction on MN9 from Swift County Road 104 to Chippewa River, on MN29 from Oakwood ave to Chippewa River and on US12 from 21st to 15th Ave | $35,500,000 | Not Selected | |
60 | MN29 | Wadena | Reconstruction from .4 miles SW of US71 to US71/Jefferson St | $3,600,000 | Not Selected | |
60 | MN108 | Henning | Reconstruction from 4th St to MN210 | $4,200,000 | 2024 | |
60 | MN28 | Cyrus | Reconstruction from Pope County Road 51 to Chippewa River | $3,400,000 | 2025 | |
59 | US12 | Kerkhoven | Thin mill and overlay from 15th St to 4th St | $400,000 | Not Selected | |
58 | US10 | Moorhead | Reconstruction from 10th St to 13th St | $2,500,000 | 2023 | Bonding For Railroad Underpass |
58 | MN34 | Detroit Lakes | Reconstruction from US59 to Becker County Road 141 | $10,400,000 | Not Selected | |
58 | MN55 | Wendell | Reclaim and overlay from Grant County Road 11 to US59 | $4,100,000 | Not Selected | |
57 | US10 | Glyndon | Reconstruction from Foundation Ave to 110th St | $11,200,000 | Not Selected | |
57 | US59 | Erhard | Thick mill and overlay from Panama St to Elm St | $300,000 | 2027 | Small Segment Of Larger Project |
57 | MN28 | Beardsley | Thin mill and overlay from Washington St to Elm St | $100,000 | Not Selected | |
56 | US59 | Elizabeth | Thick mill and overlay from Prairie Ave to Broadway St | $100,000 | 2027 | Small Segment Of Larger Project |
56 | MN7 | Correll | Thin mill and overlay from Hill Ave to Big Stone County Road 25 | $100,000 | Not Selected | |
56 | MN113 | Waubun | Thin mill and overlay from Railroad crossing to US59 | $200,000 | Not Selected | |
55 | MN34 | Barnesville | Thin mill and overlay from MN9 to 13th St SE | $300,000 | Not Selected | |
55 | MN(/MN28 | Morris | Thin mill and overlay on MN9 from Stevens County Road 22 to MN28 and on MN28 from Lyndale Ave to US59 | $1,300,000 | Not Selected | |
54 | MN29 | Alexandria | Major CPR and diamond grinding from 8th Ave to 2nd Ave | $1,800,000 | Not Selected | |
54 | MN32 | Hitterdal | Thin mill and overlay from within curb and gutter limits | $200,000 | Not Selected | |
53 | MN32 | Ulen | Thin mill and overlay from Washington Ave to Wild Rice River | $300,000 | Not Selected | |
51 | MN108 | Ottertail | Medium mill and overlay from Maple Ave to Buchanan Rd | $100,000 | 2024 | Small Segment Of Larger Project |
49 | MN78 | Ottertail | Thin mill and overlay from MN108 to Ottertail County Road 1 | $300,000 | 2030 | Small Segment Of Larger Project |
49 | MN9 | Barnesville | Reconstruction from the railroad tracks to I-94 | $8,800,000 | 2023 | Coordination With City Of Barnesville |
47 | US75 | Clinton | Thin mill and overlay from Lake St to Front St | $200,000 | Not Selected | |
47 | US59 | Callaway | Thin mill and overlay from Iowa St to Ernster St | $200,000 | Not Selected | |
44 | MN/28/US75 | Graceville | Reconstruction on MN28 from 1.5miles east of Big Stone County Road 35 to US 75 and on US75 from Big Stone County Road 52 to MN28 | $9,100,000 | Not Selected | |
42 | MN34 | Osage | Reclaim and overlay from MN225 to Becker County Road 48 | $600,000 | 2024 | Small Segment Of Larger Project |
42 | MN27 | Hoffman | Thin mill and overlay from MN55 to Third St | $200,000 | Not Selected | |
42 | MN29 | Parkers Prairie | Thin mill and overlay from MN235 to State St | $400,000 | Not Selected | |
42 | MN28/MN29/MN114 | Starbuck | Thin mill and overlay on MN28 from John St to Tiegen St, on MN29 from Outlet Creek to MN28 and on MN114 from MN8 to 8th St | $500,000 | Not Selected | |
41 | US75 | Dumont | Thin mill and overlay from Traverse County Road 11 to Traverse County Road 6 | $200,000 | Not Selected | |
41 | MN210 | Fergus Falls | Reconstruction from .4 miles west if I-94 to I-94 | $6,000,000 | 2028 | Coordinate Work With Bridge Replacement |
38 | MN78 | Battle Lake | Thin mill and overlay from MN210 to Summit St | $200,000 | Not Selected | |
37 | MN7/US12 | Ortonville | Thin mill and overlay on MN7 from Pacific Ave to US12 and on US12 from MN7 to US75 | $700,000 | Not Selected | |
36 | MN108 | Dent | Medium mill and overlay from .2 miles west of Otter Tail County Road 35 to .08 miles west of Otter Tail County Road 35 | $100,000 | 2026 | Small Segment Of Larger Project |
34 | US10 | Detroit Lakes | Major CPR and diamond grinding from Summit Ave to Becker County Road 54 | $4,400,000 | Not Selected | |
30 | MN28/MN29/MN104 | Glenwood | Thin mill and overlay on MN28 from .2 miles NW of 5th St to 5th St, on MN29 from MN28 to MN55 and on MN104 from 8th Ave to MN28 | $2,300,000 | Not Selected | |
30 | MN27/US75 | Wheaton | Thin mill and overlay on MN27 from 16th st to 12th St and on US75 from MN27 to 5th Ave N | $500,000 | Not Selected | |
28 | US10 | Detroit Lakes | Major CPR and diamond grinding from US59 to Summit Ave | $700,000 | Not Selected | |
28 | MN55/MN79/US59 | Elbow Lake | Thin mil and overlay on MN55 from MN79 to Central Ave, on MN79 from MN55 to 2nd Ave NE and on US59 from MN79 to end of Elbow Lake curb and gutter | $300,000 | Not Selected | |
24 | MN55 | Hoffman | Thin mill and overlay from MN27 to Grant County Road 37 | $100,000 | Not Selected |