This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Traffic impacts

I-94 in Minneapolis project area map
All traffic impacts are tentative and weather dependent.
Current
Lane closures
5 a.m. Mon, June 16 through early August
- Cedar Ave. is reduced to one lane in each direction under the I-94 bridges
Through 10 p.m. Fri, Aug. 15
- I-94 is reduced to two lanes in both directions between 11th Ave. South and Franklin Ave. Southeast
- Westbound Hwy 55 ramp to South 7th St. is reduced to one lane
Ramp closures
9 p.m. Fri, June 13 through 5 a.m. Mon, Aug. 18
- The following ramps are closed:
- Northbound I-35W ramp to eastbound I-94
- Eastbound I-94 ramp to Huron Blvd.
- South 6th St. ramp to eastbound I-94
- Riverside Ave. ramp to eastbound I-94
- Cedar Ave. ramp to eastbound I-94
Through 5 a.m. Wed, Aug. 20
- Huron Blvd. ramp to eastbound I-94
Bridge closures
7 a.m. Mon, Aug. 4 through 5 a.m. Mon, Aug. 18
- Riverside Ave. bridge over I-94 is closed
- Motorist and bicyclists detour: East Franklin Ave., 26th Ave. South and 25th Ave. South (PNG)
- Pedestrian detour: South 9th St. and 25th Ave. South (PNG)
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect lane and ramp closures during construction. Motorists should be aware that some nearby construction projects will have overlapping traffic impacts with the I-94 Minneapolis work. All lanes on I-94 between 11th Ave. South and Franklin Ave. Southeast are expected to reopen to traffic for the Minnesota State Fair from mid-August through Labor Day. Work will resume after Labor Day to complete the removal of crossovers and other items such as signage and lighting.
Road closures
10 p.m. Fri, Aug. 15 through 5 a.m. Mon, Aug. 18
- I-94 is closed in both directions between I-35W and Hwy 280
Ramp closures
9 p.m. Fri, Aug. 15 through 5 a.m. Mon, Aug. 18
- Eastbound I-94 ramp to eastbound Hwy 55 is closed
About this project
We will be doing maintenance and repair work on five bridges along I-94 in Minneapolis. These bridges include:
- I-94 bridge (Dartmouth Bridge) that spans the Mississippi River
- Riverside Ave. bridge over I-94
- I-94 over Cedar Ave.
- I-94 over the Light Rail Transit (Blue Line)
- I-94 over Hwy 55/Hiawatha Ave.
Summary of work
- Construct temporary crossovers
- Repair bridge decks
- Resurface bridge pavement
- Remove and replace bridge joints
- Update guardrails
- Upgrade drainage
- Repaint bridge steel