Join us for an in-person public meeting on Tue, March 11 to learn more about Hwy 97 construcion this year. For more information, visit the meetings webpage.
About this project

Hwy 97 in Forest Lake project location map.
Starting in Spring 2025, Hwy 97 will be reconstructed between I-35 and Hwy 61 to improve traffic flow and safety. Turn lanes will be added at specific intersections along the highway and a single-lane roundabout at Fenway Avenue also will be constructed. A raised median will be added to divide east and westbound traffic on the two-lane roadway. The median will also serve as an accessible pedestrian crossing. A new multi-use trail will be constructed along the south side of Hwy 97 to provide a safer space for pedestrians and bicyclists, as well as a connection to the Hardwood Creek Regional Trail.
Summary of work
- Reconstruct roadway and add raised medians
- Add turnlanes at specific intersections
- Build a single-lane roundabout
- Construct multi-use trail
- Upgrade pedestrian accessibility
- Repair/replace drainage
Project timeline
Consstruction will be done in two stages, with one half of the road under construction each year.
- Stage 1 spring 2025: Hornseby St. to Falcon Ave.
- Stage 2 spring 2026: Falcon Ave. to Forest Blvd.