Project Complete
Hwy 101 Chanhassen and Eden Prairie project location map.
About this project
Crews resurfaced two miles of road, added trail connections, reconstructed a trail, improved accessibility of ramps and signals, installed pedestrian signals; repaired shoulders and improve drainage.
Summary of work
- Resurfaced travel lanes
- Installed ADA compliant curb ramps
- Added or upgraded pedestrian ramps and crossings
- Improved drainage
- Installed accessible pedestrian signals
- Reconstructed trail on west side of road
- Connected trail on west side of road with Twilight Trail path
- Repaired shoulders along several areas of the project
- Replaced existing guardrail
