About this project

Summary of MnDOT work
- Resurface 6.6 miles of asphalt to concrete pavement on Hwy 75 from Trosky to Pipestone
- Install paved shoulders, and turn-lane extensions
- Replace five box culverts and repair additional culverts
Traffic impacts
- A detour will be required during construction
- The detour route will be determined about one year prior to construction
- Motorists can expect delays traveling through the area during construction