About this project
Following a transportation study of Hwy 60 through Lake Crystal, a roadway design concept was developed that reflects the current and future transportation needs identified by the city of Lake Crystal, local residents and businesses, and other project stakeholders. Construction in 2025 will improve the pavement, safety, traffic flow, accessibility, and bicycle/pedestrian accommodations.
Summary of work
- Reconstruct Hwy 60 from west of the south junction with Blue Earth County Road 20 to east of Lakeview Rd.
- In coordination with the City of Lake Crystal, replace utilities, including storm sewer, and portions of water main and sanitary
- Add a westbound median acceleration lane at Main St.
- Construct a pedestrian trail (with concrete barrier) along the south side of Hwy 60 from Cemetery Rd. to Lakeview Rd.
- Repair bridge over Co. Rd. 6
- Update lighting
- Modify accesses
- Preliminary Layout: February 2024
Traffic impacts
Hwy 60 thru-traffic will be detoured during construction using the follow routes:

Local access to the City of Lake Crystal, businesses, and residents along the project area will be maintained through a variety of routes: