Study complete
In 2023 MnDOT identified future safety and access needs along ten miles of Hwy 10 between 15th Ave. SE in St. Cloud and Hwy 24 in Clear Lake, Sherburne County. This valuable information is being used to plan future projects along this corridor.
Next steps
Hwy 10 – St. Cloud to Haven Township
Preliminary engineering study launched in 2025
- Develop design alternatives, include interchange proposal, for Hwy 10 on the north end near 15th Ave. SE in St. Cloud
- Propose safety and access improvements on Hwy 10 through Haven Township. This section of highway provides critical access for industrial properties and large vehicles.
This engineering study will be completed by summer 2026.
Learn more and share feedback on this and other Let's Talk Transportation projects.



