Specialty and competitive programs
Highway Safety Improvement Program
Minneapolis-St. Paul Metropolitan area reactive projects
How the projects scored in 2019
Below are the results of the latest round of HSIP reactive projects approved by the Transportation Advisory Board in January 2019. View more detailed scores (Excel).
Last updated December 2019
Score | Applicant | Roadway | Description | Amount Requested | Amount Awarded | Year |
---|---|---|---|---|---|---|
892 | St. Paul | Minnehaha Ave | Rebuild signal systems at intersections of Forest St, Earl St, Johnson Pkwy and Ruth St including adding mast arms, countdown timers, APS, upgrade from 8" to 12" indications | $1,080,000 | $1,080,000 | 2022 |
880 | Minneapolis | Lake Street | Replace signal systems at intersections of Dean Pkwy, Thomas Ave and Minnehaha Pkwy, add mast arms, countdown timers, APS, increase from 8" signal lenses to 12" | $990,000 | $990,000 | 2022 |
834 | Bloomington | County Highway 1 | Install left turn lanes on each approach at Xerxes Ave; convert thru lane to right turn lane on both Xerxes approaches; upgrade signals to include flashing yellow arrows and add retroreflective pavement markings | $469,800 | $469,800 | 2022 |
678 | Anoka County | County Highway 83 | Construct roundabout at Alpine Drive | $1,350,000 | $1,350,000 | 2023 |
662 | Dakota County | County Highway 9 | Construct center median to allow left turns and restrict east/west thru and lefts at Scenic Trail / Heritage Drive | $360,000 | $360,000 | 2022 |
628 | Hennepin County | County Highway 34 | Remove channelized right turn islands at 98th Street, replace signal system, install blue enforcement lights, and make improvements for bicyclists and pedestrians | $1,170,000 | $1,170,000 | 2022 |
595 | Carver County | MN 5 | Construct roundabout at Reform Street | $1,346,400 | $1,346,400 | 2023 |
577 | Columbia Heights Fridley |
53rd Ave | Extend center median and construct turnabout from Highway 65 to 1,100 feet west | $730,800 | $730,800 | 2023 |
574 | Chisago County | County Highway 23 | Construct roundabout at Lofton Ave and flatten horizontal curve | $1,512,000 | $1,512,000 | 2022 |
545 | Hennepin County | County Highways 35 and 52 | Replace signal heads, re-time signals and add additional signal heads, enforcement lights, left turn phasing; install curb extensions, APS, and countdown timers on County Highway 35 within Bloomington and County 52 within Richfield | $846,000 | $846,000 | 2022 |
474 | Hennepin County | County Highway 50 | Eliminate bypass lanes, restripe to introduce left turn lanes at Koala and Sterling; widen to add westbound left turn lane at Dogwood St; install intersection lighting and raised center median for pedestrian refuge | $405,000 | $405,000 | 2023 |
435 | Ramsey County | County Highway 51 | Build dedicated right and left turn lanes at County Road B2; replace signal system with flash yellow arrows, APS, countdown timers, and install pedestrian ramps | $746,690 | $746,690 | 2023 |
399 | Anoka County | County Highway 1 | Install additional signal heads at Blackfoot street; change from protected only to flashing yellow arrows | $405,000 | $405,000 | 2022 |
369 | MnDOT | Multiple | Apply high friction treatment on 4 ramps: westbound Highway 55 to eastbound Highway 5, westbound I-694 to southbound Highway 100, southbound Highway 77 to eastbound Killebrew Dr, and westbound I-494 to southbound I-35E |
$410,130 | $410,130 | 2022 |
351 | Anoka County | County Highway 1 | Install additional signal heads at Mississippi Blvd; change from protected only to flashing yellow arrows | $450,000 | $450,000 | 2023 |
314 | Anoka County | County Highway 35 | Construct roundabout at Gardena Ave | $1,350,000 | $1,350,000 | 2023 |
312 | Dakota County | County Highway 62 | Reconstruct intersection at Northfield Blvd to remove skew and construct left and right turn lanes | $1,350,000 | $0 | Not selected |
305 | Dakota County | County Highway 73 | Construct roundabout at Thompson Ave | $1,395,000 | $0 | Not selected |
244 | Anoka County | County Highway 22 | Construct roundabout at Cleary Road | $1,350,000 | $0 | Not selected |
222 | Columbia Heights | MN 65 | Install pedestrian-level and vehicle-level lighting from 43rd Ave to 47th Ave; reconstruct sidewalk and pedestrian ramps along each side of Highway 65 | $1,117,710 | $0 | Not selected |
192 | Anoka County | County Highway 17 | Install additional signal heads at Lake Drive; change from protected only to flashing yellow arrows | $450,000 | $0 | Not selected |