Non-National Highway System pavement projects
MnDOT District 7
How the projects scored in 2019
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated December 2019
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
92 | MN19 | Medium overlay from Highway 15 to the west city limits of Gaylord | $7,800,000 | Not selected | District is focusing on pavements previously selected and those currently in worse condition |
90 | MN22 | Medium overlay from 10th Street SW to 6th Avenue NE | $14,000,000 | 2023 | |
88 | MN22 | Reclaim and overlay from Highway 111 to north of Sibley County Road 67 | $5,200,000 | 2020 | |
88 | MN91 | Medium overlay from the northern city limits of Adrian to the Nobles/Murray county line | $5,100,000 | 2020 | |
88 | MN111 | Reclaim and overlay from Highway 99 to Highway 22 | $4,900,000 | 2020 | |
87 | MN5 | Medium overlay from 5th Street on north side of Green Isle to Highway 212 | $2,300,000 | 2021 | |
87 | US75 | Medium overlay from Veteran's Drive in Luverne to Highway 268/Trosky (D7/D8) | $6,400,000 | 2025 | |
86 | US75 | Medium mill and overlay from north end of the bridge over I-90 and the I-90 ramp | $500,000 | 2025 | |
86 | MN22 | Medium overlay from north of Highway 83 to Bassett Drive in Mankato | $1,300,000 | Not selected | Removed from CHIP to include with a future larger Highway 22 project. |
85 | MN99 | Medium mill and overlay from Birch Street to Highway 169 | $4,300,000 | 2021 | |
85 | MN15 | Medium overlay from the Iowa/Minnesota State line to Johnson Street in Fairmont | $4,500,000 | 2028 | |
85 | MN83 | Reclaim and overlay from north of Blue Earth County Road 173 to east of Blue Earth County Road 41 (near Mankato) | $7,200,000 | Not selected | Corridor needs more evaluation |
84 | MN99 | Medium overlay from Le Center to west of Highway 13 | $2,800,000 | 2027 | |
84 | MN22 | Reconstruction from north of the Blue Earth County Road 90 to 0.5 miles north of Blue Earth County Road 90 | $700,000 | Not selected | Smaller segment. Should be included in a future larger Highway 22 project |
83 | US75 | Medium overlay from the Iowa/MN state line to north of 101st Street | $4,600,000 | 2028 | |
83 | MN13 | Reclaim and overlay from north of Highway 60 to Highway 99 | $9,100,000 | 2028 | |
83 | MN270 | Reclaim and overlay from the railroad overpass at Hills to Highway 75 | $5,800,000 | Not selected | Potential turnback, coordination with local partners will be needed |
82 | MN4 | Medium overlay from Watonwan County Road 26 to Highway 60 | $21,000,000 | 2022 | |
82 | MN4 | Reclaim and overlay from Watonwan County Road 12 to south side of Sleepy Eye | $15,000,000 | 2023 | |
82 | MN13 | Medium mill and overlay from Waseca County Road 30 to South of Highway 60 | $3,900,000 | 2026 | |
82 | MN13 | Medium overlay from Highway 99 to Highway 21/south of Montgomery city limits | $1,600,000 | 2028 | Part of Waterville to Montgomery Project |
82 | MN5 | Reclaim and overlay from Division Street in Gaylord to Sibley County Road 17 | $4,100,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
82 | MN13 | Medium overlay from 5th Street SE to Waseca County Road 13 | $600,000 | Not selected | Waiting to coordinate with another project. |
81 | MN13 | Medium mill and overlay from Highway 21 to southern Montgomery city limits | $800,000 | 2028 | |
81 | MN19 | Medium mill and overlay from the New Prague to east of Alton Avenue | $500,000 | 2029 | |
81 | MN19 | Medium mill and overlay from east of Red Wing Avenue to east of LeRoy Avenue South | $900,000 | 2029 | |
81 | MN264 | Reclaim and overlay from Round Lake to north ramps at I-90 | $5,600,000 | Not selected | Potential turnback, coordination with local partners will be needed |
80 | MN253 | Reclaim and overlay from Faribault County Road 2 to I-90 | $3,500,000 | 2020 | |
80 | MN254 | Reclaim and overlay from 1st Street to I-90 | $2,600,000 | 2020 | |
80 | MN19 | Repair Concrete from Highway 4 to Highway 15 | $21,000,000 | Not selected | Continue to monitor for pavement performance |
80 | MN68 | Reclaim and overlay from Highway 15 south of New Ulm to Highway 169 | $16,000,000 | 2029 | |
80 | MN93 | Medium overlay from Bridge 72007 (near Le Sueur) to Highway 169 | $400,000 | Not selected | Waiting to coordinate with another project. |
79 | MN22 | Medium mill and overlay from north of Sibley County Road 67 to Gaylord city limits | $200,000 | 2020 | |
79 | MN22 | Medium mill and overlay from south of Highway 83 to north of Highway 83 | $400,000 | Not selected | Smaller segment. Should be included in a future larger Highway 22 project |
79 | MN22 | Medium mill and overlay from north of Blue Earth County Road 90 to north of Hungry Hollow Road | $400,000 | Not selected | Should be included in a future larger Highway 22 project |
79 | MN22 | Medium mill and overlay from north of Hungry Hollow Road to north of Maple Hill Road | $200,000 | Not selected | Should be included in a future larger Highway 22 project |
78 | MN4 | Medium mill and overlay from the Iowa/Minnesota state line to Martin County Road 26 | $3,700,000 | 2020 | |
78 | MN30 | Medium overlay from Highway 22 to Highway 83 | $3,800,000 | 2020 | |
78 | MN99 | Medium overlay from Highway 13 to Highway 21 | $2,800,000 | 2020 | |
78 | MN30 | Medium mill and overlay from Cottonwood County Road 7 to Highway 71 | $6,200,000 | 2021 | |
78 | MN13 | Thick overlay from Montgomery city limits to New Prague | $5,500,000 | Not selected | Waiting to coordinate with another project. |
78 | MN30 | Medium mill and overlay from East of Highway 169 (Amboy eastern city limits) to east of Troendle Street SW | $5,200,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
78 | MN109 | Medium mill and overlay from Winnebago to east of 560th Avenue (west of Wells) | $11,000,000 | Not selected | Not a current district priority, but will continue to monitor for pavement performance |
77 | MN93 | Medium mill and overlay from Highway 169 to the southern city limits of Henderson | $1,600,000 | 2022 | |
77 | MN22 | Medium mill and overlay from the Iowa/Minnesota state line to Faribault County Road 16 | $10,000,000 | 2027 | |
77 | MN257 | Reclaim and overlay from southern city limits of Hanska to Highway 15 | $2,900,000 | 2028 | |
77 | MN19 | Medium mill and overlay from east of Highway 169 to east of Le Sueur County Road 143 | $6,100,000 | 2029 | |
77 | MN19 | Medium mill and overlay from west of 11th Avenue SW to the New Prague | $200,000 | 2029 | |
76 | MN22 | Reclaim and overlay from Faribault County Road 16 (where Highway 22 turns North) to 10th Street SW in Wells | $3,800,000 | 2025 | |
76 | MN83 | Medium mill and overlay from west of Ichabod Lane to Highway 22/Victory Drive | $200,000 | Not selected | |
76 | MN99 | Medium mill and overlay from the railroad crossing on the East side of St. Peter to the Western city limits of Le Center | $12,000,000 | Not selected | |
75 | MN13 | Medium mill and overlay from MN30 to 1.5 miles South of Waseca | $3,900,000 | Not selected | |
74 | MN4 | Medium mill and overlay from Highway 68 to Highway 19 | $6,600,000 | Not selected | |
74 | MN60 | Major concrete rehabilitation from Highway 13 to east of TH13 | $200,000 | Not selected | |
73 | MN91 | Medium mill and overlay from the southern city limits of Adrian to 8th Street in Adrian | $300,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
73 | MN19 | Medium mill and overlay from west of Highway 169 to west of Highway 169 | $700,000 | 2029 | Small segment with bridge work that will be included with a project on Highways 13/19/169 |
73 | MN4 | Medium overlay from 3rd Avenue NW in Sleepy Eye to North side of Highway 68 intersection | $1,300,000 | Not selected | |
73 | MN13 | Medium overlay from Highway 30 in New Richland to 2.2 miles North of Highway 30 | $1,100,000 | Not selected | |
72 | MN91 | Reclaim and overlay from southern Ellsworth city limits to North Avenue in Ellsworth | $1,300,000 | Not selected | |
71 | MN30 | Thin overlay Blue Earth County Road 24 to west end of Bridge 07038 | $4,600,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
71 | MN19 | Medium mill and overlay from east of Le Sueur County Road 143 to west of 11th Avenue SW | $300,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
71 | MN22 | Medium mill and overlay from Linden Avenue to North Avenue in Gaylord | $400,000 | Not selected | |
71 | MN86 | Reclaim and overlay I-90 to Highway 60 | $19,000,000 | Not selected | |
70 | MN263 | Reclaim and overlay from Ceylon to I-90 | $6,200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
70 | MN22 | Medium mill and overlay north Sunrise Drive in St. Peter to south of Nicollet Count Road 20 | $300,000 | 2024 | Small segment that will be included in larger Highway 22 project |
70 | MN19 | Medium mill and overlay from railroad bridge east of Henderson to east of Henderson Station Road | $200,000 | 2025 | Segment part of larger Highway 19 project |
70 | MN30 | Medium overlay from the Highway 169/Amboy city limit to east of the South Junction of Highway 169 | $900,000 | Not selected | |
70 | MN19 | Medium mill and overlay from East of Alton Avenue to Red Wing Avenue | $200,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP), previously selected because of bridge and highway work to the west |
70 | MN83 | Medium mill and overlay from east of Blue Earth County Road 41 (near Mankato) to west of Blue Earth County Road 41 | $200,000 | Not selected | |
70 | MN91 | Reclaim and overlay from Iowa/Minnesota state line to Ellsworth | $800,000 | Not selected | |
69 | MN30 | Medium mill and overlay from Highway 83 to western city limits of New Richland | $3,400,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
69 | MN22 | Medium mill and overlay from Maple Hill Road to south of the Junction of Highway 83 | $400,000 | 2029 | Smaller segment. Will likely be included in larger Highway 22 project |
68 | MN60 | Reclaim and overlay Highway 14 to Waterville | $18,500,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
68 | US59 | Medium mill and overlay from Iowa/Minnesota state line to the South Junction of Highway 60 | $2,300,000 | Not selected | |
68 | MN62 | Medium mill and overlay from East Fulda city limits to Plum Avenue in Windom | $12,000,000 | Not selected | |
67 | MN30 | Medium mill and overlay from east of Troendle Street SW in Mapleton to western city limits of Mapleton | $500,000 | Not selected | |
67 | MN60 | Major concrete rehabilitation from east of 3rd Street in Waterville to Highway 13 | $300,000 | Not selected | |
66 | MN83 | Medium mill and overly from Highway 30 to Blue Earth County Road 173 | $6,900,000 | Not selected | |
65 | MN19 | Medium mill and overlay from Henderson to the Sibley/Le Sueur county line | $600,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
65 | MN19 | Medium mill and overlay from east of LeRoy Avenue South to Highway 13 | $200,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
65 | MN4 | Major Concrete rehabilitation/diamond grinding from Willow Street NW to 3rd Avenue NW | $800,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
65 | MN30 | Reclaim and overlay from Highway 71 to Highway 4 | $26,000,000 | Not selected | |
65 | MN5 | Medium mill and overlay from Sibley County Road 15 to South of 5th Street | $300,000 | Not selected | |
65 | MN13 | Medium mill and overlay from Waseca County Road 103 to 5th Street SE in Waseca | $800,000 | Not selected | |
64 | MN91 | Reclaim and overlay from North Avenue in Ellsworth to NE of Chaney Avenue | $3,500,000 | Not selected | |
63 | MN4 | Thick overlay from Highway 60 near St. James to the west junction of Highway 60 | $300,000 | 2022 | Selected prior to policy (in 2019-2022 STIP) |
63 | MN22 | Medium mill an overlay from Fairbault County Road 6 to the West Junction of Faribault County Road 16 | $400,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP), Coordinating with another MnDOT project |
63 | MN30 | Thin overlay from west end of Bridge 07038 to the Highway 169 | $800,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
62 | MN4 | Major Concrete rehabilitation/diamond grinding from the bridge over Highway 60 to Watonwan County Road 12 | $400,000 | Not selected | |
61 | MN13 | Medium overlay Waseca City limits to Waseca County Road 103 (South of Waseca) | $400,000 | Not selected | |
61 | MN91 | Reclaim and overlay from Dayton Avenue to the southern city limits of Adrian | $2,500,000 | Not selected | |
59 | MN99 | Medium mill and overlay city limits of Nicollet to Heideman Avenue in Nicollet | $500,000 | Not selected | |
58 | MN60 | Reclaim and overlay from Highway 14 to north of Highway 14 | $200,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
58 | MN91 | Reclaim and overlay from NE of Chaney Avenue to Dayton Avenue | $1,500,000 | Not selected | |
54 | MN30 | Medium mill and overlay from Murray/Cottonwood County line to Cottonwood County Road 7 | $400,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
54 | MN22 | Medium mill and overlay from south of the West Junction of Highway 212 to Highway 212 | $200,000 | Not selected | |
53 | MN30 | Thin overlay from Highway 15 to Blue Earth County Road 24 | $1,600,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
50 | MN19 | Medium mill and overlay from Highway 5 to Henderson | $6,600,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
46 | US75 | Thick mill and overlay from James Street to Veteran's Drive | $1,300,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
45 | MN21 | Medium mill and overlay from Highway 99 to Highway 13 (South of Montgomery) | $4,400,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
43 | MN22 | Medium mill and overlay from south of Nicollet County Road 20 to Highway 111 | $5,300,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
43 | US75 | Medium overlay from north of 101st Street to the north end of the Bridge over I-90 | $200,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
43 | MN68 | Reclaim and overlay from Morgan to the North Junction of Highway 4 | $9,000,000 | Not selected | |
42 | MN4 | Minor concrete rehabilitation from Sleepy Eye to Elsworth Street in Sleepy Eye | $200,000 | 2023 | Selected prior to policy (in 2019-2028 CHIP) |
41 | MN19 | Medium mill and overlay from East of Henderson Station Road to west of Highway 169 | $800,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
39 | MN22 | Medium overlay from North Avenue to south of Highway 212 | $11,500,000 | Not selected | |
39 | MN86 | Reclaim and overlay from Iowa/Minnesota state line to Bridge 32084 (ramps North of I90) | $7,400,000 | Not selected | |
35 | MN83 | Medium overlay from west of Blue Earth County Road 41 (near Mankato) to west of Ichabod Lane | $200,000 | Not selected | |
34 | MN91 | Reclaim and overlay from 0.3 miles north of North Avenue in Ellsworth to 1 mile north of North Avenue | $700,000 | Not selected | |
31 | MN109 | Medium overlay from east of 560th Avenue (west of Wells) to the western city limits of Wells | $400,000 | Not selected | |
30 | MN19 | Medium mill and overlay from the Sibley/Le Sueur county line to railroad bridge east of Henderson | $400,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
25 | MN5 | Medium mill and overlay from 4th Avenue East to Sibley County Road 15 | $2,900,000 | Not selected | |
23 | MN22 | Reconstruction from Blue Earth County Road 15 to County Road 90 | $11,500,000 | Not selected | |
16 | MN13 | Minor concrete rehabilitation from 0.2 miles south of Highway 60 to 0.2 miles north of Highway 60 | $100,000 | Not selected |