Minnesota Department of Transportation

511 Travel Info

Hwy 59 Worthington

Humiston Ave. and Oxford St.

About this project

Highway 14/Highland Avenue Study area map

Hwy 59 Worthington project location. View full-size map.

MnDOT conducted a transportation study in 2017 that combined input from the City of Worthington, local residents, businesses, and other project stakeholders to arrive at roadway concepts reflective of the future transportation needs on Hwy 59 through Worthington. In 2023 additional public input influenced an updated design of the Humiston Ave. segment. Both segments of Hwy 59 (Humiston Ave. and Oxford St.) will be reconstructed in 2027 and 2028.

Summary of work

  • Reconstruct Hwy 59
    • North/South segment (Humiston Ave.): from just north of the I-90 interchange to the intersection with Oxford St.
      • Includes Frontage Rd. on the east side of Humiston Ave.
    • West/East segment (Oxford St.): from the intersection with Humiston Ave. to just west of the roundabout at Hwy 60
  • Construct a roundabout at Ryan’s Rd.
  • Construct roundabouts at the ramps with I-90
  • Construct signal at Humiston Ave. and Oxford St. intersection
  • Modify accesses along Hwy 59
  • Update lighting along the corridor
  • Draft layout (December 2023): PDF