Non-National Highway System pavement projects
MnDOT District 8

Learn more about how MnDOT evaluates and selects pavement projects
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- District 8 project selection
- District 8 National Highway System pavement projects
- District 8 Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated August 2025
Total score | Route | Description | High-level cost estimate for planning purposes | Year planned (FY) | Comments |
---|---|---|---|---|---|
87 | MN67 | Construct cul-de-sac on Hwy 67 at entrance to Upper Sioux Agency State Park and replace signs. | $330,000 | 2026 | NA |
65 | MN67 | Resurface Hwy 67 from Hwy 23 to the Upper Sioux Agency State Park. | $3,200,000 | 2029 | NA |
62 | MN67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
59 | MN67 | Reclaim and overlay from Travers Ln. to Highway 19 | $12,300,000 | Not Selected | NA |
58 | MN67 | Reclaim and overlay from US 75 to US59 near Clarkfield | $7,200,000 | Not Selected | NA |
55 | MN67 | Resurface Hwy 67 from Hwy 75 to Hwy 59. | $10,900,000 | 2033/2034 | NA |
40 | MN67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln. | $2,100,000 | Not Selected | NA |
Previous years
Total Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
87 | Hwy 67 | Construct cul-de-sac on Hwy 67 at entrance to Upper Sioux Agency State Park and replace signs. | $330,000 | 2026 | NA |
85 | Hwy 4 | Resurface Hwy 4 from Fairfax to Hector. | $14,045,000 | 2027/2028 | NA |
85 | Hwy 68 | Resurface Hwy 68 from Porter to Minneota; upgrade sidewalks to meet ADA standards in Porter, Taunton and Minneota; replace box culverts and bridges along project area. | $10,500,000 | 2032/2033 | NA |
83 | Hwy 24 | Medium overlay Highway 12 (Litchfield) to Highway 15 | $8,800,000 | Not Selected | This section has not been selected because it is a thin whitetopping test section (4-inch bonded concrete overlay in 2015). District will continue to monitor performance for research purposes. |
81 | Hwy 30 | Resurface Hwy 30 from the Minnesota/South Dakota state line to 8th St in Pipestone. | $1,500,000 | 2029 | NA |
81 | US75 | Cold in place recycling and medium overlay from Yellow Medicine County Road 3 (Canby) to 0.4 mi. S. of US 212 | $4,000,000 | Not selected | Project was not selected due to fiscal constraints in 2030 (no new non-NHS projects were added in FY 2030) |
81 | US75 | Medium overlay from Murray County Road 3 to US212 | $4,000,000 | Not Selected | Not a district priority will continue to monitor pavement performance. |
80 | US75 | Resurface Hwy 75 from Pipestone Creek to S Valley St in Lake Benton. | $9,300,000 | 2031/2032 | NA |
78 | Hwy 40 | Resurface Hwy 40 from Milan to the west jct of Hwy 29. | $3,300,000 | 2028 | NA |
78 | Hwy 40 | Resurface Hwy 40 from Milan to the west jct of Hwy 29. | $7,400,000 | 2028/2029 | NA |
78 | Hwy 30 | Resurface Hwy 30 from Hwy 59 to the Murray/Cottonwood county line; replace bridge over Des Moines River. | $17,150,000 | 2029/2030 | NA |
78 | Hwy 22 | Medium overlay from Hutchinson to Highway 7 | $3,300,000 | Not Selected | Candidate for reconstruction in 2034 |
75 | Hwy 19 | Resurface Hwy 19 from Ivanhoe to CR 5. | $22,300,000 | 2031/2032 | NA |
75 | Hwy 22 | Resurface from US 12 to Fredericks Ave. (Eden Valley) | $9,300,000 | 2032/2033 | NA |
75 | US59 | Reclaim and overlay from 15th Ave. (Clarkfield) to W. JCT. US 212 | $3,800,000 | Not selected | NA |
74 | Hwy 40 | Resurface Hwy 40 from CR 4 to Willmar. | $20,200,000 | 2028/2029 | NA |
74 | Hwy 55 | Medium overlay from Stearns/Meeker County Line to Eden Valley | $3,000,000 | Not Selected | Candidate for preventive maintenance in 2024 |
74 | Hwy 68 | Reclaim and overlay from N. JCT. US 71 to 0.2 mi. W. of Hwy 67 (Morgan) | $3,900,000 | Not selected | NA |
74 | Hwy 68 | Reclaim and overlay from US71 to Hwy 57 in Morgan | $3,900,000 | Not Selected | NA |
73 | Hwy 30 | Cold in place recycling and medium overlay from US 75 to Ravine St. (Lake Wilson) | $4,300,000 | Not selected | NA |
72 | US59 | Resurface Hwy 59 from Hwy 14 to CR 6 in Marshall. | $5,300,000 | 2028 | NA |
71 | Hwy 67 | Resurface Hwy 67 from Hwy 23 to the Upper Sioux Agency State Park. | $3,200,000 | 2029 | NA |
71 | US75 | Resurface Hwy 75 from CR 34 to Hwy 30 in Pipestone. | $4,700,000 | 2029 | NA |
71 | US75 | Resurface Hwy 75 from 0.12 miles south of CR 9 to CR 34 in Pipestone. | $15,700,000 | 2026/2027 | NA |
71 | Hwy 119 | Medium mill and overlay from Highway 212 (Dawson) to Highway 40 | $2,700,000 | Not Selected | Candidate for preventive maintenance in 2021 |
71 | Hwy 4 | Resurface Hwy 4 from Hwy 12 to Hwy 55. | $18,900,000 | Not Selected | NA |
69 | Hwy 24 | Repair concrete on Hwy 24 from Hwy 12 to Hwy 15. | $1,000,000 | 2024 | NA |
68 | Hwy 7 | Resurface Hwy 7 from Hwy 71 to Hwy 4. | $13,000,000 | 2032 | NA |
67 | Hwy 68 | Resurface Hwy 68 from Wabasso to Hwy 71. | $1,900,000 | 2031 | NA |
66 | Hwy 30 | Surface Hwy 30 from Hwy 75 in Pipestone to 60th Avenue in Lake Wilson. Upgrade sidewalks to meet ADA standards in Lake Wilson. | $7,000,000 | 2030 | NA |
66 | Hwy 40 | Resurface Hwy 40 from Madison to Hwy 119. | $5,700,000 | 2033 | NA |
65 | US75 | Resurface Hwy 75 from Hwy 67 to Hwy 212. | $5,400,000 | 2033 | NA |
65 | Hwy 4 | Resurface Hwy 4 from US 212 to Cosmos. | $9,300,000 | 2033 | NA |
65 | Hwy 40 | Resurface Hwy 40 from Hwy 119 to 0.1 miles west of 5th Street in Milan. | $3,400,000 | 2026/2027 | NA |
65 | Hwy 68 | Reclaim and overlay from Redwood County Road 3 (Morgan) to Redwood/Brown County Line | $3,100,000 | Not Selected | Candidate for reconstruction in 2030 |
65 | Hwy 7 | Reclaim and overlay from Highway 4 (Cosmos) to Highway 22 | $7,400,000 | Not Selected | Candidate for preventive maintenance in 2025 |
65 | Hwy 7 | Reclaim and overlay Highway 71 to Highway 4 (Cosmos) | $13,000,000 | Not Selected | NA |
64 | Hwy 4 | Reclaim and overlay from Cosmos to Meeker County Road 23 | $5,400,000 | 2023 | This section has been prioritized due to maintenance patching losing effectiveness because of the level of deterioration. |
64 | Hwy 271 | Resurface Hwy 271 from CR 17 to W Ash Street in Hendricks. | $3,200,000 | 2032 | NA |
64 | Hwy 7 | Resurface Hwy 7 from Milan to Montevideo. | $12,100,000 | 2033/2034 | NA |
64 | Hwy 267 | Reclaim and overlay from Iona to Highway 30 | $4,000,000 | Not Selected | NA |
63 | Hwy 68 | Reclaim and overlay from South Dakota/Minnesota State Line to Canby | $6,400,000 | Not Selected | NA |
62 | Hwy 29 | Medium mill and overlay from west junction of Highway 40 to east junction Highway 40 and additional locations on Highway 40 | $5,200,000 | 2024 | Coordinated with projects on Highway 40 |
62 | Hwy 29, Hwy 40 | Resurface Hwy 29 from west jct of Hwy 40 to east jct of Hwy 40; resurface Hwy 40 from east jct of Hwy 29 to Chippewa CR 4. | $7,700,000 | 2030 | NA |
62 | Hwy 29 | Reclaim and overlay from Airport Ave (Montevideo) to Hwy 40 | $3,700,000 | Not selected | NA |
62 | Hwy 67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
61 | Hwy 9 | Resurface Hwy 9 from Hwy 23 to Hwy 71. | $2,700,000 | 2031 | NA |
61 | Hwy 274 | Reclaim and overlay from Wood Lake to Highway 23 | $6,500,000 | Not Selected | NA |
59 | Hwy 67 | Reclaim and overlay from Travers Ln. to Highway 19 | $12,300,000 | Not Selected | NA |
58 | Hwy 67 | Reclaim and overlay from US 75 to US59 near Clarkfield | $7,200,000 | Not Selected | NA |
58 | Hwy 68 | Reclaim and overlay Highway 71 to Redwood County Road 3 (Morgan) | $7,700,000 | Not Selected | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to CR 33 in Marshall, excluding the city of Ghent. | $900,000 | 2024 | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to Hwy 59 in Marshall, excluding the city of Ghent. | $1,800,000 | 2024 | NA |
56 | Hwy 15 | Resurface Hwy 15 from Winthrop to Hwy 212. | $15,300,000 | Not Selected | NA |
55 | Hwy 67 | Resurface Hwy 67 from Hwy 75 to Hwy 59. | $10,900,000 | Not Selected | NA |
54 | US59 | Reclaim and overlay from Yellow Medicine County Road 3 to Clarkfield | $4,100,000 | Not Selected | NA |
50 | Hwy 40 | Resurface Hwy 40 from Minnesota/South Dakota border to Hwy 75. | $13,500,000 | 2033 | NA |
43 | Hwy 22 | Resurface Hwy 22 from Glencoe to Hutchinson. | $6,500,000 | 2033 | NA |
43 | Hwy 9 | Resurface Hwy 9 from Hwy 71 to Sunburg. | $7,400,000 | 2034 | NA |
42 | Hwy 267 | Resurface Hwy 267 from Iona to Hwy 30. | $1,800,000 | 2033 | NA |
42 | Hwy 22 | Thin overlay from .1 miles east of Hwy 7 to .2 miles west of Hwy 7 | $100,000 | Not Selected | NA |
40 | Hwy 67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln. | $2,100,000 | Not Selected | NA |
39 | Hwy 269 | Thin overlay from South Dakota/Minnesota State Line to Highway 23 (Jasper) | $600,000 | Not Selected | NA |
37 | Hwy 9 | Thin overlay from Kandiyohi County Road 7 (Sunberg) to Kandiyohi / Swift Co. Line | $100,000 | Not selected | NA |
36 | US75 | Thin overlay from 4th St. N. (Pipestone) to Pipestone County Road 22 | $100,000 | Not Selected | NA |
32 | Hwy 29 | Thin overlay from Hwy 40 to Chippewa/Swift County Line | $400,000 | Not Selected | NA |
31 | Hwy 68 | Thin overlay on from Highway 19 to Redwood County Road 32 (Milroy) | $700,000 | Not Selected | NA |
29 | Hwy 19 | Thin overlay from Reference point 3 to Reference point 4 | $200,000 | Not selected | NA |
29 | Hwy 19 | Thin overlay from Reference pt 003 to Reference pt 004 | $200,000 | Not Selected | NA |
18 | US59 | Repair and smooth concrete pavement on Hwy 59 from 201st Street to Lyon CR 14 and from Lyon CR 6 to Hwy 23. | $4,500,000 | 2024 | NA |
6 | Hwy 22 | Thin overlay from Sibley/McLeod County line to US212 | $200,000 | Not Selected | NA |
6 | Hwy 330 | Thin overlay from Highway 14 to University of Minnesota SW Research and Outreach Center | $500,000 | Not Selected | NA |
5 | Hwy 22 | Thin overlay from Sibley/McLeod County Line to Highway 212 | $400,000 | Not Selected | NA |
3 | Hwy 104 | Thin mill and overlay Highway 9 to Kandiyohi/Pope County Line | $1,400,000 | Not Selected | NA |
View more detailed scores (Excel).
Total Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
87 | Hwy 67 | Construct cul-de-sac on Hwy 67 at entrance to Upper Sioux Agency State Park and remove pavement between cul-de-sac and bridge #87011. | $600,000 | 2025 | NA |
85 | Hwy 68 | Resurface Hwy 68 from Canby to Minneota; upgrade sidewalks to meet ADA standards in Porter, Taunton and Minneota; replace box culverts and bridges along project area. | $3,300,000 | 2033 | NA |
85 | Hwy 4 | Resurface Hwy 4 from Fairfax to Hector. | $11,225,000 | 2026/2027 | NA |
85 | Hwy 68 | Resurface Hwy 68 from Porter to Minneota; upgrade sidewalks to meet ADA standards in Porter, Taunton and Minneota; replace box culverts and bridges along project area. | $10,500,000 | 2032/2033 | NA |
83 | Hwy 24 | Medium overlay Highway 12 (Litchfield) to Highway 15 | $8,800,000 | Not Selected | This section has not been selected because it is a thin whitetopping test section (4-inch bonded concrete overlay in 2015). District will continue to monitor performance for research purposes. |
81 | Hwy 30 | Resurface Hwy 30 from the Minnesota/South Dakota state line to 8th St in Pipestone. | $1,500,000 | 2029 | NA |
81 | US75 | Cold in place recycling and medium overlay from Yellow Medicine County Road 3 (Canby) to 0.4 mi. S. of US 212 | $4,000,000 | Not selected | Project was not selected due to fiscal constraints in 2030 (no new non-NHS projects were added in FY 2030) |
81 | US75 | Medium overlay from Murray County Road 3 to US212 | $4,000,000 | Not Selected | Not a district priority will continue to monitor pavement performance. |
80 | US75 | Resurface Hwy 75 from Pipestone Creek to S Valley St in Lake Benton. | $9,300,000 | 2030/2031 | NA |
78 | Hwy 40 | Resurface Hwy 40 from Milan to the west jct of Hwy 29. | $3,300,000 | 2026 | NA |
78 | Hwy 30 | Resurface Hwy 30 from Hwy 59 to the Murray/Cottonwood county line; replace bridge over Des Moines River. | $15,400,000 | 2028/2029 | NA |
78 | Hwy 22 | Medium overlay from Hutchinson to Highway 7 | $3,300,000 | Not Selected | Candidate for reconstruction in 2034 |
75 | Hwy 19 | Resurface Hwy 19 from Ivanhoe to CR 5. | $19,800,000 | 2031/2032 | NA |
75 | Hwy 22 | Resurface Hwy 22 from Hwy 12 to Eden Valley. | $16,300,000 | 2032/2033 | NA |
75 | US59 | Reclaim and overlay from 15th Ave. (Clarkfield) to W. JCT. US 212 | $3,800,000 | Not selected | NA |
74 | Hwy 40 | Reclaim and overlay Old Highway 277 to Kandiyohi County Road 5 (Willmar) | $12,700,000 | 2026 | NA |
74 | Hwy 40 | Resurface Hwy 40 from CR 4 to Willmar. | $17,400,000 | 2030/2031 | NA |
74 | Hwy 68 | Reclaim and overlay from N. JCT. US 71 to 0.2 mi. W. of Hwy 67 (Morgan) | $3,900,000 | Not selected | NA |
74 | Hwy 55 | Medium overlay from Stearns/Meeker County Line to Eden Valley | $3,000,000 | Not Selected | Candidate for preventive maintenance in 2024 |
73 | Hwy 19 | Resurface (concrete) Hwy 19 from Redwood Falls to Morton; resurface (concrete) Hwy 71 from Hwy 19 to CR 15. | $5,400,000 | 2031 | NA |
73 | Hwy 30 | Cold in place recycling and medium overlay from US 75 to Ravine St. (Lake Wilson) | $4,300,000 | Not selected | NA |
71 | US75 | Resurface Hwy 75 from CR 9 to CR 34 in Pipestone. | $15,700,000 | 2026 | NA |
71 | Hwy 67 | Resurface Hwy 67 from Hwy 23 to the Upper Sioux Agency State Park. | $3,100,000 | 2029 | NA |
71 | US75 | Resurface Hwy 75 from CR 9 to Hwy 30 in Pipestone. | $5,550,000 | 2026/2027 | NA |
71 | Hwy 119 | Medium mill and overlay from Highway 212 (Dawson) to Highway 40 | $2,700,000 | Not Selected | NA |
69 | Hwy 4 | Reclaim and overlay from Hector to Cosmos | $10,100,000 | Not Selected | NA |
67 | Hwy 68 | Resurface Hwy 68 from Wabasso to Hwy 71. | $1,800,000 | 2030 | NA |
67 | Hwy 24 | Repair concrete on Hwy 24 from Hwy 12 to Hwy 15. | $1,500,000 | Not Selected | NA |
66 | Hwy 30 | Surface Hwy 30 from Hwy 75 in Pipestone to 60th Avenue in Lake Wilson. Upgrade sidewalks to meet ADA standards in Lake Wilson. | $7,000,000 | Not Selected | NA |
66 | Hwy 40 | Resurface Hwy 40 from Madison to Hwy 119. | $5,700,000 | Not Selected | NA |
65 | US75 | Resurface Hwy 75 from county line to Hwy 212. | $5,400,000 | 2033 | NA |
65 | Hwy 40 | Resurface Hwy 40 from Hwy 119 to 5th Street in Milan. | $5,800,000 | 2025/2026 | NA |
65 | Hwy 7 | Reclaim and overlay Highway 71 to Highway 4 (Cosmos) | $13,000,000 | Not Selected | NA |
65 | Hwy 4 | Resurface Hwy 4 from US 212 to Cosmos. | $9,300,000 | Not Selected | NA |
65 | Hwy 7 | Reclaim and overlay from Highway 4 (Cosmos) to Highway 22 | $7,400,000 | Not Selected | Candidate for preventive maintenance in 2025 |
65 | Hwy 68 | Reclaim and overlay from Redwood County Road 3 (Morgan) to Redwood/Brown County Line | $3,100,000 | Not Selected | Candidate for reconstruction in 2030 |
64 | Hwy 7 | Resurface Hwy 7 from Milan to Montevideo. | $12,100,000 | 2031/2032 | NA |
64 | Hwy 267 | Reclaim and overlay from Iona to Highway 30 | $4,000,000 | Not Selected | NA |
64 | Hwy 271 | Resurface Hwy 271 from CR 17 to W Ash Street in Hendricks. | $3,200,000 | Not Selected | NA |
63 | Hwy 68 | Reclaim and overlay from South Dakota/Minnesota State Line to Canby | $6,400,000 | Not Selected | NA |
62 | Hwy 29, Hwy 40 | Resurface Hwy 29 from west jct of Hwy 40 to east jct of Hwy 40; resurface Hwy 40 from east jct of Hwy 29 to Chippewa CR 4. | $3,500,000 | 2029 | NA |
62 | Hwy 15 | Resurface Hwy 15 from Hwy 12 in Dassel to Meeker/Stearns county line. |
$9,400,000 | 2024/2025 | NA |
62 | Hwy 67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
62 | Hwy 29 | Medium mill and overlay from west junction of Highway 40 to east junction Highway 40 and additional locations on Highway 40 | $5,200,000 | Not Selected | NA |
62 | Hwy 29 | Reclaim and overlay from Airport Ave (Montevideo) to Hwy 40 | $3,700,000 | Not selected | NA |
62 | Hwy 40 | Construct turn lanes on Hwy 40 from Bridge 34032 to 0.3 miles W of 30th Street SW in Willmar. | $900,000 | Not Selected | NA |
61 | Hwy 274 | Reclaim and overlay from Wood Lake to Highway 23 | $6,500,000 | Not Selected | NA |
61 | Hwy 9 | Resurface Hwy 9 from Hwy 23 to Hwy 71. | $2,700,000 | Not Selected | NA |
59 | Hwy 67 | Reclaim and overlay from Travers Ln. to Highway 19 | $12,300,000 | Not Selected | NA |
58 | Hwy 68 | Reclaim and overlay Highway 71 to Redwood County Road 3 (Morgan) | $7,700,000 | Not Selected | NA |
58 | Hwy 67 | Reclaim and overlay from US 75 to US59 near Clarkfield | $7,200,000 | Not Selected | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to Hwy 59 in Marshall, excluding the city of Ghent. | $1,803,000 | 2024 | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to CR 33 in Marshall, excluding the city of Ghent. | $900,000 | 2024 | NA |
54 | US59 | Reclaim and overlay from Yellow Medicine County Road 3 to Clarkfield | $4,100,000 | Not Selected | NA |
43 | Hwy 22 | Resurface Hwy 22 from Glencoe to Hutchinson. | $6,900,000 | 2032 | NA |
42 | Hwy 22 | Thin overlay from .1 miles east of Hwy 7 to .2 miles west of Hwy 7 | $100,000 | Not Selected | NA |
40 | Hwy 67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln. | $2,100,000 | Not Selected | NA |
39 | Hwy 269 | Thin overlay from South Dakota/Minnesota State Line to Highway 23 (Jasper) | $600,000 | Not Selected | NA |
37 | Hwy 9 | Thin overlay from Kandiyohi County Road 7 (Sunberg) to Kandiyohi / Swift Co. Line | $100,000 | Not selected | NA |
36 | US75 | Thin overlay from 4th St. N. (Pipestone) to Pipestone County Road 22 | $100,000 | Not Selected | NA |
32 | Hwy 29 | Thin overlay from Hwy 40 to Chippewa/Swift County Line | $400,000 | Not Selected | NA |
31 | Hwy 68 | Thin overlay on from Highway 19 to Redwood County Road 32 (Milroy) | $700,000 | Not Selected | NA |
29 | Hwy 19 | Thin overlay from Reference point 3 to Reference point 4 | $200,000 | Not selected | NA |
29 | Hwy 19 | Thin overlay from Reference pt 003 to Reference pt 004 | $200,000 | Not Selected | NA |
18 | US59 | Repair and smooth concrete pavement on Hwy 59 from 211th Street to Lyon CR 14 and from Lyon CR 6 to Hwy 23. | $1,500,000 | 2024 | NA |
6 | Hwy 330 | Thin overlay from Highway 14 to University of Minnesota SW Research and Outreach Center | $500,000 | Not Selected | NA |
6 | Hwy 22 | Thin overlay from Sibley/McLeod County line to US212 | $200,000 | Not Selected | NA |
5 | Hwy 22 | Thin overlay from Sibley/McLeod County Line to Highway 212 | $400,000 | Not Selected | NA |
3 | Hwy 104 | Thin mill and overlay Highway 9 to Kandiyohi/Pope County Line | $1,400,000 | Not Selected | NA |
View more detailed scores (Excel).
Total Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
87 | Hwy 67 | Construct cul-de-sac on Hwy 67 at entrance to Upper Sioux Agency State Park and remove pavement between cul-de-sac and bridge #87011. | $620,000 | Not Selected | NA |
85 | Hwy 68 | Resurface Hwy 68 from Porter to Minneota; upgrade sidewalks to meet ADA standards in Porter, Taunton and Minneota; replace box culverts and bridges along project area. | $10,500,000 | 2032 | NA |
85 | Hwy 68 | Resurface Hwy 68 from Canby to Minneota; upgrade sidewalks to meet ADA standards in Porter, Taunton and Minneota; replace box culverts and bridges along project area. | $10,900,000 | 2033 | NA |
85 | Hwy 4 | Resurface Hwy 4 from Fairfax to Hector. | $14,200,000 | 2026/2027 | NA |
83 | Hwy 24 | Medium overlay Highway 12 (Litchfield) to Highway 15 | $8,800,000 | Not Selected | This section has not been selected because it is a thin whitetopping test section (4-inch bonded concrete overlay in 2015). District will continue to monitor performance for research purposes. |
81 | Hwy 30 | Resurface Hwy 30 from the Minnesota/South Dakota state line to 8th St in Pipestone. | $1,600,000 | 2029 | NA |
81 | US75 | Cold in place recycling and medium overlay from Yellow Medicine County Road 3 (Canby) to 0.4 mi. S. of US 212 | $4,000,000 | Not selected | Project was not selected due to fiscal constraints in 2030 (no new non-NHS projects were added in FY 2030) |
81 | US75 | Medium overlay from Murray County Road 3 to US212 | $4,000,000 | Not Selected | Not a district priority will continue to monitor pavement performance. |
80 | US75 | Resurface Hwy 75 from Pipestone Creek to S Valley St in Lake Benton. | $9,300,000 | 2030/2031 | NA |
78 | Hwy 30 | Resurface Hwy 30 from Hwy 59 to the Murray/Cottonwood county line; replace bridge over Des Moines River. | $14,400,000 | 2028/2029 | NA |
78 | Hwy 22 | Medium overlay from Hutchinson to Highway 7 | $3,300,000 | Not Selected | Candidate for reconstruction in 2034 |
75 | Hwy 22 | Resurface Hwy 22 from Hwy 12 to Eden Valley. | $9,300,000 | 2032 | NA |
75 | Hwy 19 | Resurface Hwy 19 from Ivanhoe to CR 5. | $22,700,000 | 2031/2032 | NA |
75 | US59 | Reclaim and overlay from 15th Ave. (Clarkfield) to W. JCT. US 212 | $3,800,000 | Not selected | NA |
74 | Hwy 40 | Reclaim and overlay Old Highway 277 to Kandiyohi County Road 5 (Willmar) | $12,700,000 | 2026 | NA |
74 | Hwy 40 | Resurface Hwy 40 from CR 4 to Willmar. | $18,500,000 | 2030/2031 | NA |
74 | Hwy 68 | Reclaim and overlay from N. JCT. US 71 to 0.2 mi. W. of Hwy 67 (Morgan) | $3,900,000 | Not selected | NA |
74 | Hwy 68 | Reclaim and overlay from US71 to Hwy 57 in Morgan | $3,900,000 | Not Selected | NA |
74 | Hwy 55 | Medium overlay from Stearns/Meeker County Line to Eden Valley | $3,000,000 | Not Selected | Candidate for preventive maintenance in 2024 |
73 | Hwy 22 | Resurface Hwy 22 from Hwy 212 to Cedar Ave in Glencoe; update sidewalks in Glencoe to meet ADA standards. | $3,000,000 | 2023 | NA |
73 | Hwy 30 | Cold in place recycling and medium overlay from US 75 to Ravine St. (Lake Wilson) | $4,300,000 | Not selected | NA |
71 | Hwy 67 | Resurface Hwy 67 from Hwy 23 to the Upper Sioux Agency State Park. | $3,300,000 | 2029 | NA |
71 | US75 | Resurface Hwy 75 from CR 9 to Hwy 30 in Pipestone. | $4,700,000 | Not Selected | NA |
71 | Hwy 119 | Medium mill and overlay from Highway 212 (Dawson) to Highway 40 | $2,700,000 | Not Selected | NA |
70 | Hwy 15 | Resurface Hwy 15 from Hwy 12 in Dassel to Meeker/Stearns county line. | $9,724,000 | 2024/2025 | NA |
69 | Hwy 4 | Reclaim and overlay from Hector to Cosmos | $10,100,000 | Not Selected | NA |
68 | Hwy 4 | Resurface Hwy 4 from Cosmos to Meeker CR 23. (4701-32) | $3,060,000 | 2023 | This section has been prioritized due to maintenance patching losing effectiveness because of the level of deterioration. |
67 | Hwy 68 | Resurface Hwy 68 from Wabasso to Hwy 71. | $1,900,000 | 2030 | NA |
65 | Hwy 40 | Resurface Hwy 40 from Hwy 119 to 5th Street in Milan. | $4,900,000 | 2025/2026 | Coordinated with other projects |
65 | Hwy 7 | Reclaim and overlay Highway 71 to Highway 4 (Cosmos) | $13,000,000 | Not Selected | NA |
65 | Hwy 7 | Reclaim and overlay from Highway 4 (Cosmos) to Highway 22 | $7,400,000 | Not Selected | Candidate for preventive maintenance in 2025 |
65 | Hwy 68 | Reclaim and overlay from Redwood County Road 3 (Morgan) to Redwood/Brown County Line | $3,100,000 | Not Selected | Candidate for reconstruction in 2030 |
64 | Hwy 267 | Reclaim and overlay from Iona to Highway 30 | $4,000,000 | Not Selected | NA |
63 | Hwy 40/US75 | Resurface Hwy 40 from Hwy 75 to Western Ave; resurface Hwy 75 from Hwy 40 to 8th St in Madison; upgrade sidewalks to meet ADA standards. | $2,651,000 | 2023 | NA |
63 | US75 | Reconstruct Hwy 75 from S Valley St in Lake Benton to south jct of Hwy 14. | $5,500,000 | 2027 | NA |
63 | Hwy 68 | Reclaim and overlay from South Dakota/Minnesota State Line to Canby | $6,400,000 | Not Selected | NA |
62 | Hwy 29/Hwy 40 | Resurface Hwy 29 from west jct of Hwy 40 to east jct of Hwy 40; resurface Hwy 40 from east jct of Hwy 29 to Chippewa CR 4. | $7,400,000 | 2029/2033 | NA |
62 | Hwy 67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
62 | Hwy 29 | Reclaim and overlay from Airport Ave (Montevideo) to Hwy 40 | $3,700,000 | Not selected | NA |
61 | Hwy 274 | Reclaim and overlay from Wood Lake to Highway 23 | $6,500,000 | Not Selected | NA |
59 | Hwy 67 | Reclaim and overlay from Travers Ln. to Highway 19 | $12,300,000 | Not Selected | NA |
58 | Hwy 68 | Reclaim and overlay Highway 71 to Redwood County Road 3 (Morgan) | $7,700,000 | Not Selected | NA |
58 | Hwy 67 | Reclaim and overlay from US 75 to US59 near Clarkfield | $7,200,000 | Not Selected | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to Hwy 59 in Marshall, excluding the city of Ghent; upgrade sidewalks on Hwy 19 from Hwy 23 to Tiger Dr and on Hwy 59 from Windstart St to Susan Dr in Marshall to meet ADA standards. | $2,700,000 | 2024 | NA |
56 | Hwy 68 | Resurface Hwy 68 from N Grant St in Minneota to CR 33 in Marshall, excluding the city of Ghent. | $890,910 | 2024 | NA |
54 | US59 | Reclaim and overlay from Yellow Medicine County Road 3 to Clarkfield | $4,100,000 | Not Selected | NA |
42 | Hwy 22 | Thin overlay from .1 miles east of Hwy 7 to .2 miles west of Hwy 7 | $100,000 | Not Selected | NA |
40 | Hwy 67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln. | $2,100,000 | Not Selected | NA |
39 | Hwy 269 | Thin overlay from South Dakota/Minnesota State Line to Highway 23 (Jasper) | $600,000 | Not Selected | NA |
37 | Hwy 9 | Thin overlay from Kandiyohi County Road 7 (Sunberg) to Kandiyohi / Swift Co. Line | $100,000 | Not selected | NA |
36 | US75 | Thin overlay from 4th St. N. (Pipestone) to Pipestone County Road 22 | $100,000 | Not Selected | NA |
32 | Hwy 29 | Thin overlay from Hwy 40 to Chippewa/Swift County Line | $400,000 | Not Selected | NA |
31 | Hwy 68 | Thin overlay on from Highway 19 to Redwood County Road 32 (Milroy) | $700,000 | Not Selected | NA |
29 | Hwy 19 | Thin overlay from Reference point 3 to Reference point 4 | $200,000 | Not selected | NA |
6 | Hwy 330 | Thin overlay from Highway 14 to University of Minnesota SW Research and Outreach Center | $500,000 | Not Selected | NA |
5 | Hwy 22 | Thin overlay from Sibley/McLeod County Line to Highway 212 | $400,000 | Not Selected | NA |
3 | Hwy 104 | Thin mill and overlay Highway 9 to Kandiyohi/Pope County Line | $1,400,000 | Not Selected | NA |
View more detailed scores (Excel).
Total Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
83 | US71 | Rural reconstruction from Highway 23 to Willmar Bypass and additional locations on Highway 71 | $25,000,000 | 2028 | NA |
79 | Hwy 23 | Medium mill and overlay from Highway 75 (Pipestone) to north of Highway 91 (Russel) | $13,400,000 | 2024 | NA |
79 | US71 | Reclaim and overlay from Redwood County Road 115 (Sanborn) to Highway 68 | $8,800,000 | 2027 | NA |
78 | Hwy 23 | Major concrete rehabilitation from north of Highway 91 (Russel) to Highway 19 (Marshall) | $20,400,000 | 2029 | NA |
77 | US71 | Major CPR and diamond grinding from US212 to Hwy 7 | $4,800,000 | Not selected | Project not selected due to the previous fix being a minor CPR in 2018; it is expected that the average life of those repair are approx. 15 years. This project will be reconsidered approx. 2033 |
77 | US212 | Major concrete rehabilitation from Highway 23 (Granite Falls) to east of Highway 23 | $8,600,000 | Not Selected | The district is currently prioritizing other concrete segments that have not yet received a rehabilitation |
75 | Hwy 15 | Thin mill and overlay from Highway 212 (Brownton) to Hutchinson | $3,200,000 | Not Selected | Candidate for Preventative Maintenance work in 2024 |
75 | US14 | Medium overlay and cold in inplace recycling from Lake Benton to Lincoln/Lyon County Line | $5,200,000 | 2027 | NA |
75 | US12 | Major concrete pavement rehabilitation from Darwin to Cokato | $10,700,000 | 2024 | NA |
75 | US212 | Medium overlay from Renville County road 16 to Renville County Road 7 | $3,700,000 | 2030 | NA |
74 | US71 | Major CPR and diamond grinding from Cottonwood/Redwood County line to 120th St | $900,000 | Not selected | Project not selected due to short length (2 miles); this pavement section continues south into District 7. This project will be selected when District 7 schedules a project. |
73 | Hwy 7 and Hwy 22 | Major concrete rehabilitation on Highway 7 from Hutchinson to Silver Lake, and on Highway 22 from McLeod County road 25 to Highway 7 (Hutchinson Bypass) | $6,200,000 | 2027 | NA |
73 | Hwy 19 and US71 | Major rehabilitation on Hwy 19 from Qualit Dr to Centennial Dr and on US71 from Hwy 19 to Renville County Road 19 | $3,000,000 | 2031 | NA |
72 | US59 | Cold in place recycling and medium overlay from Highway 14 to Lyon County Road 6 (Marshall) | $5,800,000 | 2028 | NA |
71 | Hwy 15 | Medium overlay from Hutchinson to Highway 12 (Dassel) | $6,400,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
71 | US71 | Reclaim and overlay from Highway 68 to Redwood Falls | $6,800,000 | 2029 | NA |
71 | US12 | Medium overlay from Kerkhoven to Pennock | $3,800,000 | Not Selected | Candidate for preventive maintenance work in 2025 |
70 | Hwy 15 | Reclaim and overlay from Highway 12 (Dassel) to Meeker/Stearns County Line | $8,400,000 | 2023 | This section has been prioritized because maintenance patching is losing effectiveness. |
70 | US14 | Medium mill and overlay from Highway 23 to Tracy | $9,400,000 | 2028 | NA |
70 | Hwy 23 | Thin mill and overlay Highway 19 (Marshall) to Lyon County Road 33 | $1,200,000 | 2028 | This section has been prioritized because a thin mill and overlay will improve performance. |
69 | US59 | Medium overlay Highway 30 (Slayton) to north junction of Highway 30 | $3,000,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
69 | US212 | Minor concrete pavement rehab and diamond grinding from Olivia to Bird Island | $1,000,000 | Not Selected | District anticipates pavement conditions will not deteriorate as fast as the model predicts |
68 | US14 | Thin mill and overlay from South Dakota/Minnesota State line to US75 | $1,400,000 | 2029 | NA |
67 | Hwy 23 | Medium mill and overlay from Rock/Pipestone County Line (Jasper) to Highway30 (Pipestone) | $5,700,000 | Not Selected | NA |
67 | US71 | Medium mill and overlay from Highway 19 (Morton) to Olivia | $7,500,000 | Not Selected | NA |
65 | US14 | Medium overlay and cold in place recycling from Revere to Redwood/Brown County Line | $6,300,000 | Not Selected | NA |
64 | Hwy 7 | Reclaim and overlay from Highway 40 (Milan) to Montevideo | $11,100,000 | Not Selected | NA |
58 | Hwy 15 | Reclaim and overlay from Hwy 19 to US212 | $4,600,000 | Not selected | NA |
56 | US71 | Concrete reconstruction from Highway 23 to Willmar Bypass | $7,900,000 | Not Selected | NA |
53 | US59 | Reconstruction from Highway 68 (Marshall) to Lyon County Road 33 | $8,900,000 | Not Selected | NA |
48 | US71 | Cold in place recycling and medium overlay from Hwy 7 to Hwy 23 | $2,500,000 | Not selected | NA |
46 | US212 | Minor CPR and diamond grinding from Hwy 22 to Morningside Dr | $1,400,000 | Not selected | NA |
45 | US212 | Unbonded overlay from Morningside Dr to Hwy 5 | $12,400,000 | Not selected | NA |
44 | US212 | Minor CPR and diamond grinding from US75 to .5 miles west of Hwy 29 (excluding Dawson) | $3,400,000 | Not selected | NA |
43 | Hwy 22 | Cold in place recycling and medium overlay from Cedar Ave to McLeod County Road 115 | $2,600,000 | Not selected | NA |
40 | Hwy 22 | Concrete reconstruction from Glencoe to Hutchinson | $50,600,000 | Not Selected | NA |
40 | US12 | Thin overlay from Highway 22 to Highway 24 (Litchfield) | $200,000 | Not Selected | NA |
39 | US12 | Concrete reconstruction from Highway 71 to Kandiyohi/Meeker County Line | $58,300,000 | Not Selected | NA |
37 | Hwy 15 | Thin overlay from Meeker County Road 18 to south of US12 | $200,000 | Not selected | NA |
37 | US71 | Thin overlay from Kandiyohi County Road 93 to Hwy 23 | $100,000 | Not selected | NA |
37 | US59 | Thin overlay from Nobles/Murray County Line to Highway 62 (Fulda) | $400,000 | Not Selected | NA |
36 | US71 | Thin overlay from Quality Drive (Redwood Falls) to Highway 71 and additional locations on Highway 71 | $1,300,000 | Not Selected | NA |
36 | US12 | Thin mill and overlay from 25th St. SE (Willmar) to Highway 71 | $400,000 | Not Selected | NA |
35 | Hwy 7 | Thin overlay from the end of bridge 8518 to Carver County Road 33 | $100,000 | Not selected | NA |
33 | Hwy 23 | Major CPR and diamond grinding from .1 mile south of Hwy 7 to .3 miles north of Hwy 7 | $200,000 | Not selected | NA |
31 | US14 | Thin overlay from Redwood County Road 7 to Main St | $100,000 | Not selected | NA |
30 | US59 | Thin overlay from .6 miles south of Hwy 62 to Hwy 62 | $100,000 | Not selected | NA |
20 | US212 | Thin overlay eastbound from west of Highway 5 to Highway 5 | $100,000 | Not Selected | NA |
12 | US59 | Thin overlay from Murray County Road 6 to 1st St | $100,000 | Not selected | NA |
8 | Hwy 15 | Minot CPR and diamond grinding from north of High Dr/County Road 15 to north of High Drive | $100,000 | Not selected | NA |
8 | Hwy 7 | Thin mill and overlay on Highway 7 & Highway 25 Roundabout | $100,000 | Not Selected | NA |
8 | US71 | Thin overlay on Highway 71 & Highway 7 Roundabout | $100,000 | Not Selected | NA |
7 | Hwy 15 | Thin overlay on Highway 19 (Winthrop) to north of Highway 19 | $100,000 | Not Selected | NA |
6 | Hwy 7 | Thin overlay from Swift Chippewa County Line to Hwy 40 | $500,000 | Not selected | NA |
6 | Hwy 7 | Minor concrete pavement rehab and diamond grinding at the intersection of Highway 23 & Highway 7 (Clara City) - approx. 1000 feet on each leg | $300,000 | Not Selected | NA |
View more detailed scores (Excel).
Total Score | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
85 | Hwy 4 | Reclaim and overlay from Highway 19 (Fairfax) to Highway 12 (Hector) | $9,200,000 | 2025 | NA |
85 | Hwy 68 | Reclaim and overlay from Canby to Minneota | $13,000,000 | 2030 | NA |
83 | Hwy 24 | Medium overlay Highway 12 (Litchfield) to Highway 15 | $8,800,000 | Not Selected | This section has not been selected because it is a thin whitetopping test section (4-inch bonded concrete overlay in 2015). District will continue to monitor performance for research purposes. |
81 | US 75 | Medium overlay from Murray County Road 3 to Hwy212 | $4,000,000 | Not Selected | Not a district priority. Will continue to monitor pavement performance. |
81 | Hwy 30 | Thin mill and overlay from South Dakota/Minnesota State line to 8th St in Pipestone | $1,200,000 | 2029 | NA |
80 | Hwy 271 | Reclaim and overlay from Highway 19 to Minnesota/South Dakota State Line | $4,900,000 | 2023 | NA |
80 | US75 | Medium overlay from Pipestone Creek to Lake Benton | $5,400,000 | 2026 | NA |
78 | Hwy 40 | Medium mill and overlay from Highway 59 (Milan) to Highway 29 | $4,000,000 | 2024 | NA |
78 | Hwy 22 | Medium overlay from Hutchinson to Highway 7 | $3,300,000 | Not Selected | Candidate for reconstruction in 2034 |
78 | Hwy 30 | Reclaim and overlay from Hwy59 to Murray/Cottonwood County line | $4,900,000 | 2026 | NA |
75 | Hwy 19 | Reclaim and overlay from Ivanhoe to Lincoln County Road 5 | $13,900,000 | 2029 | NA |
75 | US 59 | Reclaim and overlay from 15th Ave to west junction of Hwy212 | $3,800,000 | Not Selected | NA |
75 | Hwy 22 | Thin overlay from Hwy12 to Fredricks Ave | $1,100,000 | 2026 | NA |
74 | Hwy 68 | Reclaim and overlay from Hwy71 to Hwy 57 in Morgan | $3,900,000 | Not Selected | NA |
74 | Hwy 40 | Reclaim and overlay Old Highway 277 to Kandiyohi County Road 5 (Willmar) | $12,700,000 | 2026 | NA |
74 | Hwy 55 | Medium overlay from Stearns/Meeker County Line to Eden Valley | $3,000,000 | Not Selected | Candidate for preventive maintenance in 2024 |
73 | Hwy 30 | Medium overlay from Hwy75 to Ravine St in Lake Wilson | $4,300,000 | Not Selected | NA |
71 | Hwy 119 | Medium mill and overlay from Highway 212 (Dawson) to Highway 40 | $2,700,000 | Not Selected | Candidate for preventive maintenance in 2021 |
71 | Hwy 67 | Thin mill and overlay from Hwy 23 to Upper Sioux Agency State Park | $1,000,000 | 2027 | Project was selected because a thin mill & overlay is a low cost treatment with a large performance benefit for this segment (as indicated by low levels of cracking) |
69 | Hwy 4 | Reclaim and overlay from Hector to Cosmos | $10,100,000 | Not Selected | Candidate for preventive maintenance in 2021 |
67 | Hwy 68 | Thin mill and overlay from Redwood County Road 6 in Wabasso to south junction with Hwy71 | $1,100,000 | 2029 | Project was selected because a thin mill & overlay is a low cost treatment with a large performance benefit for this segment (as indicated by low levels of cracking) |
65 | Hwy 40 | Medium mill from Highway 119 to Highway 59 (Milan) | $3,600,000 | 2025 | Coordinated with other projects |
65 | Hwy 68 | Reclaim and overlay from Redwood County Road 3 (Morgan) to Redwood/Brown County Line | $3,100,000 | Not Selected | Candidate for reconstruction in 2030 |
65 | Hwy 7 | Reclaim and overlay Highway 71 to Highway 4 (Cosmos) | $13,000,000 | Not Selected | NA |
65 | Hwy 7 | Reclaim and overlay from Highway 4 (Cosmos) to Highway 22 | $7,400,000 | Not Selected | Candidate for preventive maintenance in 2025 |
64 | Hwy 4 | Reclaim and overlay from Cosmos to Meeker County Road 23 | $5,400,000 | 2023 | This section has been prioritized due to maintenance patching losing effectiveness because of the level of deterioration. |
64 | Hwy 267 | Reclaim and overlay from Iona to Highway 30 | $4,000,000 | Not Selected | NA |
63 | Hwy 68 | Reclaim and overlay from South Dakota/Minnesota State Line to Canby | $6,400,000 | Not Selected | NA |
62 | Hwy 29 | Medium mill and overlay from west junction of Highway 40 to east junction Highway 40 and additional locations on Highway 40 | $5,200,000 | 2024 | Coordinated with projects on Highway 40 |
62 | Hwy 67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
62 | Hwy 29 | Reclaim and overlay from Airport Trail to Hwy 40 | $3,700,000 | Not Selected | NA |
61 | Hwy 274 | Reclaim and overlay from Wood Lake to Highway 23 | $6,500,000 | Not Selected | NA |
59 | Hwy 67 | Reclaim and overlay from Travers Ln. to Highway 19 | $12,300,000 | Not Selected | NA |
58 | Hwy 68 | Reclaim and overlay Highway 71 to Redwood County Road 3 (Morgan) | $7,700,000 | Not Selected | NA |
58 | Hwy 67 | Reclaim and overlay from Hwy 75 to Hwy59 near Clarkfield | $7,200,000 | Not Selected | NA |
54 | US59 | Reclaim and overlay from Yellow Medicine County Road 3 to Clarkfield | $4,100,000 | Not Selected | NA |
42 | Hwy 22 | Thin overlay from .1 miles east of Hwy 7 to .2 miles west of Hwy 7 | $100,000 | Not Selected | NA |
40 | Hwy 67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln. | $2,100,000 | Not Selected | NA |
39 | Hwy 269 | Thin overlay from South Dakota/Minnesota State Line to Highway 23 (Jasper) | $600,000 | Not Selected | NA |
37 | Hwy 9 | Thin overlay from Kandiyohi County Road 7 to Kandiyohi/Swift County line | $100,000 | Not Selected | NA |
36 | US75 | Thin overlay from 4th St. N. (Pipestone) to Pipestone County Road 22 | $100,000 | Not Selected | NA |
32 | Hwy 29 | Thin overlay from Hwy 40 to Chippewa/Swift County Line | $400,000 | Not Selected | NA |
31 | Hwy 68 | Thin overlay on from Highway 19 to Redwood County Road 32 (Milroy) | $700,000 | Not Selected | NA |
29 | Hwy 19 | Thin overlay from Reference pt 003 to Reference pt 004 | $200,000 | Not Selected | NA |
6 | Hwy 330 | Thin overlay from Highway 14 to University of Minnesota SW Research and Outreach Center | $500,000 | Not Selected | NA |
6 | Hwy 22 | Thin overlay from Sibley/McLeod County line to Hwy212 | $200,000 | Not Selected | NA |
3 | Hwy 104 | Thin mill and overlay Highway 9 to Kandiyohi/Pope County Line | $1,400,000 | Not Selected | NA |
View more detailed scores (Excel).
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
85 | Hwy 4 | Reclaim and overlay from Highway 19 (Fairfax) to Highway 12 (Hector) | $9,200,000 | 2024 | NA |
85 | Hwy 68 | Reclaim and overlay from Canby to Minneota | $13,000,000 | 2028 | NA |
83 | Hwy 24 | Medium overlay Highway 12 (Litchfield) to Highway 15 | $8,800,000 | Not Selected | This section has not been selected because it is a thin whitetopping test section (4-inch bonded concrete overlay in 2015). District will continue to monitor performance for research purposes. |
80 | Hwy 271 | Reclaim and overlay from Highway 19 to Minnesota/South Dakota State Line | $4,900,000 | 2023 | NA |
80 | US75 | Medium overlay from Pipestone Creek to Lake Benton | $5,400,000 | 2026 | NA |
80 | US75 | Medium overlay from Highway 268 (Trosky) to Highway 30 (Pipestone) | $5,200,000 | 2028 | NA |
78 | Hwy 40 | Medium mill and overlay from Highway 59 (Milan) to Highway 29 | $4,000,000 | 2024 | NA |
78 | Hwy 22 | Medium overlay from Hutchinson to Highway 7 | $3,300,000 | Not Selected | Candidate for reconstruction in 2034 |
75 | Hwy 19 | Reclaim and overlay from Ivanhoe to Lincoln County Road 5 | $14,000,000 | 2029 | NA |
74 | Hwy 40 | Reclaim and overlay from old Highway 277 to Kandiyohi County Road 5 (Willmar) | $13,000,000 | 2026 | NA |
74 | Hwy 55 | Medium overlay from Stearns/Meeker County Line to Eden Valley | $3,000,000 | Not Selected | Candidate for preventive maintenance in 2024 |
71 | Hwy 119 | Medium mill and overlay from Highway 212 (Dawson) to Highway 40 | $2,700,000 | Not Selected | Candidate for preventive maintenance in 2021 |
69 | Hwy 4 | Reclaim and overlay from Hector to Cosmos | $10,000,000 | Not Selected | Candidate for preventive maintenance in 2021 |
65 | Hwy 40 | Medium mill from Highway 119 to Highway 59 (Milan) | $3,600,000 | 2025 | Coordinated with other projects |
65 | Hwy 68 | Reclaim and overlay from Redwood County Road 3 (Morgan) to Redwood/Brown County Line | $3,100,000 | Not Selected | Candidate for reconstruction in 2030 |
65 | Hwy 7 | Reclaim and overlay Highway 71 to Highway 4 (Cosmos) | $13,000,000 | Not Selected | NA |
65 | Hwy 7 | Reclaim and overlay from Highway 4 (Cosmos) to Highway 22 | $7,400,000 | Not Selected | Candidate for preventive maintenance in 2025 |
64 | Hwy 4 | Reclaim and overlay from Cosmos to Meeker County Road 23 | $5,400,000 | 2023 | This section has been prioritized due to maintenance patching losing effectiveness because of the level of deterioration. |
64 | Hwy 267 | Reclaim and overlay from Iona to Highway 30 | $4,000,000 | Not Selected | NA |
63 | Hwy 68 | Reclaim and overlay from South Dakota/Minnesota State Line to Canby | $6,400,000 | Not Selected | NA |
62 | Hwy 67 | Reclaim and overlay from Redwood Falls to Fergus Ave. (Morgan) | $8,600,000 | Not Selected | NA |
62 | Hwy 29 | Medium mill and overlay from west junction of Highway 40 to east junction Highway 40 and additional locations on Highway 40 | $5,200,000 | 2024 | Coordinated with projects on Highway 40 |
61 | Hwy 274 | Reclaim and overlay from Wood Lake to Highway 23 | $6,500,000 | Not Selected | NA |
59 | Hwy 67 | Reclaim and overlay from Travers Ln to Highway 19 | $12,000,000 | Not Selected | NA |
58 | Hwy 68 | Reclaim and overlay Highway 71 to Redwood County Road 3 (Morgan) | $7,700,000 | Not Selected | NA |
54 | US59 | Reclaim and overlay from Yellow Medicine County Road 3 to Clarkfield | $4,100,000 | Not Selected | NA |
40 | Hwy 67 | Thin mill and overlay Highway 23 (Granite Falls) to Travers Ln | $2,100,000 | Not Selected | NA |
39 | Hwy 269 | Thin overlay from South Dakota/Minnesota State Line to Highway 23 (Jasper) | $600,000 | Not Selected | NA |
36 | US75 | Thin overlay from 4th St. N. (Pipestone) to Pipestone County Road 22 | $100,000 | Not Selected | NA |
31 | Hwy 68 | Thin overlay on from Highway 19 to Redwood County Road 32 (Milroy) | $700,000 | Not Selected | NA |
6 | Hwy 330 | Thin overlay from Highway 14 to University of Minnesota SW Research and Outreach Center | $500,000 | Not Selected | NA |
5 | Hwy 22 | Thin overlay from Sibley/McLeod County Line to Highway 212 | $400,000 | Not Selected | NA |
3 | Hwy 104 | Thin mill and overlay from Highway 9 to Kandiyohi/Pope County Line | $1,400,000 | Not Selected | NA |