I-494 Bridge over Minnesota River

Bloomington, Eagan and Mendota Heights

This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.

Traffic impacts

I-494 bridge over the Minnesota River between 24th Ave. in Bloomington and Pilot Knob Rd. in Mendota Heights/Eagan project location map

I-494 project location map.

View full-size map

All traffic impacts are tentative and weather dependent.

Current

Ramp closures

Wed, April 17 through Mon, May 2

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect weekend, nighttime and directional closures.

Lane closures

5 a.m. Mon, April 29 through late October
  • EB I-494 is reduced to two lanes between 24th Ave. and Pilot Knob Rd.
5 a.m. Wed, May 1 through late October
  • WB I-494 is reduced to two lanes between 24th Ave. and Pilot Knob Rd.

Ramp closures

10 p.m. Sun, April 28 through October
Late May through early June

About this project

MnDOT is doing work on the I-494 bridge over the Minnesota River. This 43-year-old bridge is in need of major repairs to continue to safely transport people and goods between the cities of Bloomington, Eagan, and Mendota Heights. Once construction is completed, travelers using the bridge will enjoy a smoother safer road. The project will also extend the life of the bridge and improve drainage.

Summary of work

  • Repair pavement on I-494
  • Reconstruct the regional trail
  • Replace bridge joints
  • Repair bridge deck, beam ends and railings
  • Reconstruct bearings
  • Replace highway lighting
  • Repair/replace drainage