Minnesota Department of Transportation

511 Travel Info

I-35W

Burnsville

Traffic impacts

I-35W between Cliff Road and the I-35/35W/35E split in Burnsville project location map

I-35W in Burnsville project location map.

View full-size map

All traffic impacts are tentative and weather dependent.

Current

Lane closures

Through 6 a.m. Sat, Nov. 9
  • I-35W is reduced to two lanes in both directions between the I-35/I-35E/I-35W split and Black Dog Rd.
    • E-ZPass lanes will be open to general traffic between the Burnsville Split and Black Dog Rd.

Upcoming

Information about upcoming traffic impacts will be posted as details become available. Motorists can expect road, lane and ramp closures as work is completed.

About this project

In coordination with the City of Burnsville and Dakota County, we will resurface I-35W between Cliff Rd. and the Burnsville Split.

Summary of work

  • Replace both pavement and concrete pavement on I-35W
  • Bridge repair, or replace bridges at Cliff Rd., Hwy 13 and Burnsville Pkwy.
  • Update guardrail
  • Improve drainage