About this project
Hwy 77 project location map
Click map for full-size version
In 2026, we will begin a project to repair and resurface Hwy 77 between 138th St. in Apple Valley and the Minnesota River bridge in Eagan. We will also repair ten bridges in the area.
The main needs along this stretch of Hwy 77 are improving pavement conditions, as the pavement is aging, and managing traffic flow. The project will smooth the road surface and strengthen the pavement to improve ride quality.
At this time, there is no funding available for future improvements related to traffic mobility.
Summary of work
- Repair and resurface Hwy 77 between 138th St. West and the Minnesota River bridge
- Repair ten bridges:
- Eastbound I-494 ramp to southbound Hwy 77 over American Blvd.
- Northbound Hwy 77 ramps to eastbound I-494 over American Blvd.
- 81st St. ramp to northbound Hwy 77 over 81st St.
- Killebrew Dr. ramps to/from southbound Hwy 77
- Lindau Ln. ramps to/from southbound Hwy 77
- Accessibility improvements
- Update drainage
- Widening of ramps
