This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Traffic impacts
All traffic impacts are tentative and weather dependent. Access to businesses and residences will remain open throughout construction.
Current
Lane closures
Wed, Sept. 11 from 9 a.m. to 6 p.m.
- NB Hwy 169 is reduced to one lane between Hwy 41 and Marystown Rd.
Wed, Sept. 11 from 6 a.m. to 4 p.m.
- SB Hwy 169 is reduced to one lane between Marystown Rd. and Hwy 41
Through 6 p.m. Fri, Sept. 13
- Hwy 169 is reduced to one lane in both directions between Hwy 21 in Jordan and Hwy 41 in Jackson Township. The speed limit in the work zone is 45 mph. Please use both lanes during traffic back-ups.
- Drivers will be limited to right-in, right-out access to Hwy 169 in the project area, except at the Hwy 169 intersections listed below. Use turnarounds at intersections where available.
- Hwy 21 (left-in turns also available)
- 173rd St. (left-in turns also available)
- 166th St.
- Bluff Dr.
- Northbound left-in turn available at commercial entrance just south of Co. Rd. 14
- Hwy 41 interchange
Upcoming
Information about upcoming traffic impacts will be posted as details become available.
Lane closures
Thu, Sept. 12 from 9 a.m. to 6 p.m.
- NB Hwy 169 is reduced to one lane between Hwy 41 and Marystown Rd.
Thu, Sept. 12 from 6 a.m. to 4 p.m.
- SB Hwy 169 is reduced to one lane between Marystown Rd. and Hwy 41
About this project
We are repaving and repairing Hwy 169 from Hwy 21 in Jordan to Co. Rd. 15/Marystown Rd. in Shakopee along with constructing new medians and J-turns to eliminate left turns onto Hwy 169. These improvements will remove high risk movements and improve safety.
Summary of work
- Repave and repair Hwy 169
- Construct new medians and J-turns