This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Traffic impacts
All traffic impacts are tentative and weather dependent.
Current
Bridge closure
Mon, April 15 through Sat, Oct. 5
- The 63rd Ave. bridge is fully closed for the duration of construction. There will be no access onto Hwy 169 from 63rd Ave.
- Detour: I-94/I-694
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect the bridge to be closed and traffic detoured during construction.
About this project
We will be closing and rebuilding the 63rd Ave. bridge over Hwy 169 in Brooklyn Park and Maple Grove, as part of the replacement to the bridge. The current bridge was built in 1968 and its condition has deteriorated to a point where it needs to be fully replaced.
Summary of work
- Replace 63rd Ave. bridge over Hwy 169
- Extend acceleration lanes on Hwy 169
- Construct a multi-use trail between Mendelssohn Ave. and Magda Dr.
- ADA improvements
- Signing replacement at the exits to EB I-94 and EB I-694