Work, traffic plan
Three-year look ahead
The future three-mile Hwy 169 freeway between Hwy 101/Hwy 10 and 197th Ave. in Elk River will take three full construction seasons to complete from April 2022 to November 2024.
Overall, Hwy 169 will be reduced to one lane of traffic in both directions through each work area. Access to/from Hwy 169 and adjacent streets will change, and motorists will follow road signs to the next open access. Pedestrians will have sidewalk closures with detours.
Construct 2024
Work includes bridge, freeway lanes, adjacent road and sidewalk connections, city utilities and underground infrastructure at:
- Hwy 169 bridge over Main St. interchange
Map: Image, PNG
Construct 2023: Complete
Work includes two bridges, freeway lanes, adjacent road and sidewalk connections, city utilities and underground infrastructure at:
- School St. /Elk Hills Dr. over Hwy 169 interchange
- Hwy 169 bridge over Jackson Ave./193rd Ave. interchange
Construct 2022: Complete
Work included two bridges, freeway lanes, adjacent road and sidewalk connections, city utilities and underground infrastructure at:
- Hwy 10/101/169 interchange
- Northbound Hwy 101/169 bridge over Hwy 10
- 197th Ave. bridge over Hwy 169 interchange
Timeline table
Dates |
Map |
Construct |
Impacts |
April-Nov 2022 |
|
|
|
April-Nov 2023 |
|
|
|
April-Nov 2024 |
|
|
Note: Off-road work to occur year-round. Information is tentative and subject to change.