About the project
	    Project Elements
- Pavement reconstruction
 - Sidewalk reconstruction
 - Storm sewer reconstruction
 - Corridor lighting
 - Utility improvements
 - Tree/brush removal
 
Project Staging
Disclaimer: Staging information and detour route are subject to change.  Estimated durations and detour are as follows.
        
A detour will be used for the duration of the project. Traffic will detour onto  Roseau County roads 4 and 23. Local traffic can use city streets to avoid the  road closure.
      
Stage 1
Hwy 11 will be closed between the east side of 4th St to west side of Hwy 32 intersection (Approximately 5 weeks)
Work to be completed:
- Install storm sewer on Hwy 11
 - Install storm sewer outlet to South Brantch Two Rivers
 - Reconstruct Hwy 11
 - Sidewalk reconstruction
 - Install bases for corridor lighting
 
Stage 2
Hwy 11 will be closed between the west side of 7th St to the east side of 4th St (Approximately 7 weeks)
Work to be completed:
- Install storm sewer on Hwy 11
 - Reconstruct Hwy 11
 - Sidewalk reconstruction
 - Install bases for corridor lighting
 
	     Stay Informed
      
	  Stay informed during the project by signing up for email updates.
Nearby Projects
	  
	  2025: Hwy 11/313 Warroad
      2026: Hwy 11 Roseau to Warroad 
      2028: Hwy 89 Roseau
Work Zone Safety Tips
- Obey posted speed limits
 - Drive undistracted
 - Move over-Give workers room to safely complete their work.
 - Know before you go: www.511mn.org
 - Be patient.
 - Do the zipper merge
 - Avoid making unnecessary lane changes
 - Never enter a road blocked with barriers or cones
 -  Expect work zones to constantly change
 