Updated June 15, 2018

Know your region? Make this list a little shorter by selecting a region below or from the map.









that have a significant impact on commercial truck traffic.
District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna

Select a project by highway

Select a project by name

Hwys 1–9

Hwy 1

Hwy 1 and 169 — Eagles Nest Lake Reconstruction

Description: Make safety improvements to Hwy 169 from Six Mile Lake Road to Bradach Road

Construction dates: Spring to July 20, 2018

Traffic impacts: Daily flagging operations with temporary lane and shoulder closures

More information: mndot.gov/d1/projects/Hwy169eagles/

Hwy 1 — Finland to Isabella

Description: Resurface pavement

Construction dates: Mid- July to late-September 2018

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/hwy1finlandtoisabella/

Hwy 1 — Kawishiwi River to Isabella

Description: Resurface pavement, replace culverts

Construction dates: May 21 to mid-September 2018
Traffic impacts: Temporary lane closures

More information: mndot.gov/d1/projects/hwy1isabella/

Hwy 2

Hwy 2 and Bingo Palace Road/Cass County Road 75 – Cass Lake

Description: Reconstruct intersection (J-turn)

Construction dates: May 14 to late June 2018

Traffic impacts: Lane closures, detour of Bingo Palace Rd/CR 75

More information: mndot.gov/d2/projects/2018/hwy2-casslake

Hwy 2 – Erskine to Hwy 59

Description: Concrete resurface; Hwy 59 overpass bridge repair

Construction dates: May 14 to late 2018 or summer 2019

Traffic impacts: Single lane, head to head traffic

More information: mndot.gov/d2/projects/2018/hwy2-erskine

Hwy 2 — Kennedy Bridge, East Grand Forks

Description: Replace bridge deck

Construction dates: Spring 2017 through fall 2018

Traffic impacts: Lane closures, detours

More information: mndot.gov/d2/projects/kennedybridge/

Hwy 2 (Belknap Street) — Superior / Duluth

Description: Reconstruct road. WisDOT project.

Construction dates: Spring 2017 through fall 2018

Traffic impacts: Lane closures, detour

More information: https://projects.511wi.gov/belknap/

Hwy 3

Hwy 3 — Inver Grove Heights

Description: Reconstruct Hwy 3 between Hwy 149 and Ann Marie Trail

Construction dates: May through fall 2018
Traffic impacts: Lane and road closures with detours

Contact: Kirsten Klein

More information: mndot.gov/metro/projects/hwy3invergrove

Hwy 4

Hwy 4 — St. James

Description: Reconstruct 1.6 miles of roadway, upgrade city utility infrastructure, enhance pedestrian accommodations

Construction dates: 2017-2018
Traffic impacts: No current traffic impacts

More information: mndot.gov/d7/projects/hwy4stjames/

Hwy 4 — Lake Henry

Description: Reconstruct Hwy 4 from Cartway Dr to Ball Park St in Lake Henry, includes new city utilities and pedestrian sidewalks.

Construction dates: May to August 2018
Traffic impacts: Thru traffic detour and truck route. Locals to encounter lane/access closures on Hwy 4 in Lake Henry, follow signs.

More information: mndot.gov/d3/2018/lakehenry/

Hwy 5

Hwy 5 — Waconia

Description: Intersection Improvement at Orchard Road in two phases. Phase One (complete: July 2017 to early October): Road closure of Hwy 5 at Orchard Rd. Phase 2 (begins Spring 2018): Traffic impacts to county roads only.

Construction dates: July 2017– mid-November 2018

Traffic impacts: Road closure and detour

More information:  https://clients.bolton-menk.com/carvercountycsah10/

Hwy 6

Hwy 6 — Emily

Description: Reconstruct Hwy 6 through Emily, includes storm water drainage, sidewalks, curbs and gutters

Construction dates: May to October 2018

Traffic impacts: Southbound Hwy 6 to detour, northbound Hwy 6 open on one narrow lane, periodic access closures, follow signs

More information: mndot.gov/d3/emily/

Hwy 7

Hwy 7 — Hopkins, Minnetonka and St. Louis Park

Description: Resurfacing improvement project

Construction dates: Spring through fall 2018
Traffic impacts: Lane and road closures with detours

More information: mndot.gov/metro/projects/hwy7minnetonkaslp/

Sign up for Hwy 7 Minnetonka and St. Louis Park project email updates

Hwy 7 — Shorewood to Minnetonka

Description: Construct turn lanes and signal and sidewalk improvements. Install signal poles in 2018.

Construction dates: August 2017 through spring 2018

Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/hwy7minnetonka

Hwy 8

Hwy 8 — Forest Lake and Taylors Falls

Description: Hwy 8 Drainage Improvement Projects

Construction dates: August to December 2018
Traffic impacts: Two week long full road closures

More information: mndot.gov/metro/projects/hwy8drainageimprovements2018

Hwy 8 — Forest Lake to Chisago City

Description: Repair drainage and guardrail on Hwy 8 from just west of Hwy 61 in Forest Lake to 273rd St. in Chisago City

Construction dates: August–October 2018
Traffic impacts: Temporary lane closures with full closure and detour required for up to four days

Contact: Denise Workcuff

Hwy 8 — Taylors Falls

Description: Replace drainage pipe on Hwy 8 near Interstate Park

Construction dates: Mid-September 2018
Traffic impacts: Full closure and detour required for up to five days

Contact: Denise Workcuff

Hwy 9

Hwy 9 — Pomme de Terre River bridge replacement near Morris

Description: New Hwy 9 bridge over the Pomme de Terre River southeast of Morris

Status: Will be replaced in the 2018 construction season

Contact: Lori Vanderhider

More information: mndot.gov/d4/projects/hwy9morris/

Hwys 10–19

Hwy 10

Hwy 10 — Anoka to Elk River (Thurston Ave. to Hwy 101)

Description: Install cable median barrier between Thurston Ave. and Hwy 101

Construction dates: April-August 2018

Traffic impacts: Temporary off-peak lane closures, shoulder closures during peak hour traffic may be needed. Note: All businesses and residences will remain accessible throughout the project.

Benefits: Improved safety

Contact: Kent Barnard

More information: www.mndot.gov/trafficeng/reports/cmbarrier.html

Hwy 10 — Arden Hills

Description: Construct a third lane on eastbound Hwy 10 between I-35W and Co Rd 96

Construction dates: 2018-2019
Traffic impacts: Non-peak lane closures and shoulder closures

More information: mndot.gov/metro/projects/hwy10ardenhills/

Sign up for Hwy 10 Arden Hills project email updates

Hwy 10 — Blaine to Mounds View

Description: Install freeway lighting between University Ave (Anoka Co Rd 51) to I-35W

Construction dates: July-August 2018

Traffic impacts: Possible off-peak lane closures

Contact: Kent Barnard

Hwy 10 — Clear Lake to Big Lake

Description: Reconstruct eastbound Hwy 10 road surface and improve the access at Hwy 10, and County Rd 23/Sherburne Ave with a new Reduced Conflict Intersection in Becker.
Construction dates: June to October 2018
Traffic impacts: Single lane traffic on both directions, plan for delays, narrow lanes,  access road changes. Temp signal at Hwy 25 in Becker.
More information: mndot.gov/d3/2018/clearlaketobiglake/

Sign up for Hwy 10 Clear Lake to Big Lake project email updates

Hwy 10 — Denmark Township to Prescott, WI

Description: Repair Hwy 10 Bridge over St. Croix River (WisDOT is the lead for the project)

Construction dates: September 2018 – May  2019

Traffic impacts: Temporary lane closures

Contact: Kent Barnard

Hwy 10 — Elk River

Description: Reconstruct the Hwy 10 bridge over Lake Orono, install a pedestrian trail, and resurface Hwy 10 from Joplin St to Xenia Ave in Elk River in Sherburne County.
Construction dates: July 6, 2017 - Fall 2018
Traffic impacts: Lane closures, narrow lanes, lane shifts, plan for delays.
More information: mndot.gov/d3/h10orono/

Sign up for Hwy 10 project email updates

Hwy 10 — Lake Park

Description: Traffic signal installation at Hwy 10 and Co Rd 7 in Lake Park

Status: Late summer 2018

Contact: Justin Knopf, project manager, 218-846-7968

More information: mndot.gov/d4/projects/lakepark/

Hwy 11

Hwy 11 — Koochiching County bridge replacement project

Description: Replace bridge

Construction dates: May 15 to October 12, 2018   August 12 to October 4, 2019

Traffic impacts: Single lane, controlled by signals

More information: mndot.gov/d1/projects/hwy11bridge/

Hwy 11 and Hwy 72 — Baudette/Rainy River International Bridge Replacement

Description: Preliminary design and environmental study for the replacement of the Baudette/Rainy River International Bridge on Hwy 72 in the city of Baudette and Hwy 11 in the town of Rainy River.

Status: Work begins 2018

More information: mndot.gov/baudette-bridge/

Hwy 12

Hwy 12 — Cokato to Howard Lake

Description: Resurface and upgrade guardrail from 7th St E in Cokato to 13th Ave in Howard Lake in Wright County

Construction dates: May - June 2018

Traffic impacts: Hwy 12 reduced to single lane, flaggers, pilot cars
More information: mndot.gov/d3/cokato/

Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project

Description: Rail realignment and industrial park access

Status: Study in progress. Work begins summer 2018.

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/willmarwye/

Hwy 13

Hwy 13 — New Richland

Description: Resurfacing approximately 11 miles of Hwy 13 from New Richland to about 1 mile south of Hwy 14 near Waseca

Construction dates: April 30 to July 27, 2018

Traffic impacts: Detour during culvert replacement beginning in May through early-June. Detour route is Hwy 30 east from New Richland to I- 35 north to Hwy 14 west to Waseca.
More information: mndot.gov/d6/projects/hwy13-resurfacing/

Sign up for Hwy 13 project email updates

Hwy 13 — Prior Lake to Savage

Description: Resurface road, improve sidewalks, guardrail and repair drainage between Eagle Creek and Hwy 101

Construction dates: May –Nov 2018

Traffic impacts: Lane closures

Contact: Kirsten Klein

Hwy 14

Hwy 14 and Hwy 169/Hwy 41 Intersection Improvements Project

Description: Scott County in partnership with MnDOT is finalizing the design for a diverging diamond interchange at the Hwy 169/Hwy 41 and Co Hwy 78 intersection, frontage roads, and an overpass at Co Hwy 14.

Construction Dates: Fall 2018 to fall 2020

Traffic impacts: Lane and intersection closures with detours

Contact: Diane Langenbach

More information: www.scottcountymn.gov/608/US-169-TH-41CH-78-Interchange-Design-Pro

Hwy 14 — Mankato Bypass

Description: Resurface and repair Hwy 14 bypass around the city of Mankato

Status: Construction begins 2018

Contact: Rebecca Arndt

More information: mndot/gov/d7/projects/hwy14mankato/

Hwy 14 — New Ulm to N. Mankato

Description: Replace New Ulm Minnesota River Bridge and Front Street Bridge, build interchange at Hwy 14/15/CR 21

Construction dates: Fall 2017 - fall 2019. In the meantime, MnDOT has taken steps to address the safety issues.

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/14newulmtonmankato/

Hwy 14 and I-35 — Steele County near Owatonna

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge/

Hwy 18

Hwy 18 — West of Garrison

Description: Restore the historical Kenney Lake roadside overlook along Hwy 18
Construction dates: August 2017-May 2018
Traffic impacts: Roadside overlooks closed
More information: mndot.gov/roadsides/historic/projects.html

Hwy 19

Hwy 19 — Cannon Falls

Description: Bridge replacement

Construction dates: May 7 to July 27, 2018

Traffic impacts: Detour during bridge replacement. Westbound Hwy 19 route is Hwy 52 north to Dakota County Road 86 west to Hwy 56 south to Hwy 19. Eastbound is reverse route.

More information: mndot.gov/d6/projects/hwy19-bridge-replacement/

Sign up for Hwy 19 Cannon Falls project email updates

Hwy 19 — Marshall

Description: Bridge rehabilitation

Construction dates: Work begins April 16, 2018

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy19marshallbridge/

Sign up for Hwy 19 Marshall project email updates

COMPLETE: Hwy 19 — Marshall to Vesta

Description: Resurface road and seal coat

Construction dates: Aug. 21, 2017–Spring 2018

Traffic impacts: Lane closures, flagger and pilot car directing traffic

More information: mndot.gov/d8/projects/hwy19marshalltovesta/

Hwys 19 and 71 — Redwood Falls

Description: Construction of two-way left turn lane, signal replacements and replacement of pedestrian ramps, sidewalks and driveways to be in compliance with the Americans with Disabilities Act

Construction dates: Summer 2018

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/hwys19and71redwoodfalls/

Hwys 20–29

Hwy 22

Hwy 22 — Eden Valley

Description: Resurfacing and ADA improvements

Status: Work begins 2018

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/hwy22edenvalley

Hwy 22 — Mapleton to Blue Earth County Road 15

Description: Reconstruct or mill-and-overlay deteriorating pavement segments. Replace Big Cobb River Bridge at Beauford

Construction dates: Spring 2017 - fall 2018

Traffic impacts: Detour

More information: mndot.gov/d7/projects/hwy22mapleton/

Hwy 23

Hwy 23 — Marshall

Description: Construction of two reduced conflict intersections and restricted left turn lane

Construction dates: Summer 2018
Contact: Mark Klema
More information: mndot.gov/d8/projects/hwy23marshall/

Hwy 23 — Mission Creek

Description: Construct bridge, replace storm sewer, make intersection accessibility improvements

Construction Dates: May 2017 (work has stopped, traffic impacts still in place)

Traffic Impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy23-mission-creek/

Hwy 23 — Mora

Description: Resurface from Hwy 65 in Mora to Hwy 107 east of Brook Park 

Construction Dates: July to mid-September 2018

Traffic Impacts: Single lane traffic, flaggers and pilot car

Hwy 23 – Willmar to New London

Description: Resurface road and seal coat, ADA improvements in Spicer
Construction dates: August 13 – end of Sept. 2018

More information: mndot.gov/d8/projects/hwy23willmarnewlondon

Sign up for Hwy 23 project email updates

Hwy 24

Hwy 24 — Clearwater

Description: New Mississippi River bridge open. Remove old bridge piers, approaches through June 2018. Landscape in Fall 2018.

Construction dates: Aug. 15, 2015–June 2018

Traffic Impacts: Periodic lane closures near bridge.
More information: mndot.gov/d3/hwy24/

Hwy 24 — Clearwater to Clear Lake

Description: Resurface from I-94 in Clearwater to Hwy 10 in Clear Lake, upgrade signals, repair storm sewers and improve pedestrian access, includes all new sidewalks in Clear Lake

Construction dates: Mid-April to mid-August 2018

Traffic impacts: Night work on Hwy 24, expect narrow lanes, shoulder/lane closures; no parking along Hwy 24 in Clear Lake. Daytime sidewalk closures in Clear Lake, follow signs.
More information: mndot.gov/d3/hwy24/

Hwy 25

Hwy 25 — Montrose to Watertown

Description: Resurface road, replace underground culverts and upgrade guardrail,  from south of Hwy 12 in Montrose to Hwy 25/Carver CR 10 in Watertown

Construction dates: May-August 2018

Traffic impacts: Segments of Hwy 25 close, detours, lane closures, pilot cars, flaggers

More information: mndot.gov/d3/2018/h25/

Sign up for Hwy 25 Montrose to Watertown project email updates

Hwy 27

Hwy 27 — East of Lastrup

Description: Replace bridge (box culvert) between 350th Ave/Ranch Rd and Morrison CR 47, seven miles east of Lastrup
Construction dates: Mid-June to August 2018
Traffic impacts: Hwy 27 to close and detour via Morrison CR 47 and CR 23

More information: mndot.gov/d3/2018/h27/

Hwy 27 — East of Lastrup (north of Hillman)

Description: Install rural intersection conflict warning system signal at Hwy 27/Morrison County Rd 8

Construction dates: Summer 2018

Traffic impacts: Periodic lane/shoulder closures, flaggers

More information: mndot.gov/trafficeng/signals/conflictwarning.html

Hwy 27 and Hwy 75 — Wheaton area

Description: Resurface Hwy 27 from just west of Co Rd 6 to the west end of Wheaton and Hwy 75 from Dumont to Wheaton

Status: Work scheduled for 2018.

Contact: Tom Pace, project manager

More information: mndot.gov/d4/projects/wheaton/

Hwy 28

Hwys 28, 29 and 104 — Glenwood

Description: Resurfacing of Hwys 28, 29 and 104 throughout Glenwood, downtown Complete Streets reconstruction, Hwy 28 grade raise near Pope County Fairgrounds

Status: Work begins 2018

Contact: Tom Pace, project manager

More information: mndot.gov/d4/projects/glenwood/

Hwy 28 — Graceville to Chokio

Description: Resurfacing of Hwy 28 from Hwy 75 in Graceville to just west of 4th Street in Chokio

Construction dates: Work begins 2018

Contact: Tom Pace

More information: mndot.gov/d4/projects/hwy28chokio/

Hwys 30-39

I-35

I-35 — Corridor projects page

Description: A complete listing of projects happening along I-35 in Minnesota

Construction start dates: 2018

Traffic impacts: Various closures will occur, check project sites for specific details

More information: www.mndot.gov/metro/projects/i35corridor2018

I-35 — Chisago

Description: Construct multiple crossovers and emergency pull offs in advance of a 2019 project  between Chisago Co. Rd 9 to the Chisago/Pine County Line

Construction dates: September–November2018

Traffic impacts: Lane closures

Contact: Denise Workcuff

I-35 and Hwy 33 — Cloquet roundabout

Description: Roundabout at I-35 and Hwy 33

Construction dates: May 21 to October 2018

Traffic impacts: Lane closures, detour, frontage road closure

More information: mndot.gov/d1/projects/i-35-cloquet/

I-35 — Elko New Market

Description: Repair bridge at Main St. (Scott Co Rd 2) over I-35

Construction dates: April through June 2018

Traffic impacts: Possible lane closures. Co. Rd 2 Bridge spanning I-35 reduced to a single lane controlled by a stop sign or a  signal flagging operation at each end of the bridge through June 30.

Contact: Kirsten Klein

I-35 — Faribault

Description: Concrete overlay of southbound I-35 from north of Rice Couty 9 to south of Highway 21

Construction dates: July to October 2018

Traffic impacts: Traffic to exit at southbound Exit 59 will be detoured during the work. Southbound traffic will be diverted onto the northbound lanes with traffic traveling in both directions on I-35 in the northbound lanes during the project.

More information: mndot.gov/d6/projects/i35-concreteoverlay/

Sign up for I-35 Faribault project email updates

I-35 — Goose Creek Rest Area

Description: Reconstruct building, grade and pave parking lot at the Goose Greek Rest Area

Construction dates:September 2017 – September 2018

Traffic impacts: Rest Area closed

Contact: Denise Workcuff

I-35 – Harris to Chisago/Pine County line

Description: Concrete pavement work, drainage updates and safety improvements

Construction dates: Fall 2018 through fall 2019

Contact: Denise Workcuff

More information: mndot.gov/metro/projects/i35harris

I-35, I-35E, I-35W — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 to October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35 — Pine County bridge replacement project over Snake River

Description: Resurfacing, new bridges

Status: Construction mid-April to mid-October 2018, June to October 2019

Traffic Impacts: Lane restrictions, ramp detours

More information: mndot.gov/d1/projects/i35snakeriver

I-35 — St. Louis, Carlton and Pine counties bridge painting project

Description: Paint 10 bridges

Construction dates: July to fall 2018

Traffic Impacts: Lane closures

More information: mndot.gov/d1/projects/i35bridges/

I-35 and Hwy 14 — Steele County near Owatonna

Description: Replace 10 bridges and reconstruct short segment of Hwy 14

Construction dates: April 2017-Fall 2018
Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/steelecty-bridge/

I-35E

I-35E — Burnsville to Eagan

Description: Replace lighting from Co. Rd. 42 to Co Rd 32 (Cliff Rd)

Construction dates: Spring 2018

Traffic impacts: Possible off-peak lane closures

Contact: Kirsten Klein

I-35E — Little Canada

Description: Realign the NB I-35E ramp to EB Hwy 36 with concrete pavement, update traffic management system and lighting

Construction dates: July-Aug. 2018

Traffic impacts: Temporary lane and ramp closure with detours

Contact: Denise Workcuff

I-35E, I-35W, I-35 — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 to October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35E — St. Paul

Description: Landscape center median between West 7th St to Grand Ave.

Construction dates: Summer-Fall 2018

Traffic impacts: Possible Lane closures

Contact: Kevin Walker

I-35W

I-35W — Burnsville and Bloomington

Description: Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane

Construction dates: Work begins July 2018

Traffic impacts: Lane closures and detours

Contact: Kirsten Klein

More Information: mndot.gov/metro/projects/i35wbloomington/

Sign up for I-35W Burnsville project email updates

I-35W and County Rd I — Arden Hills, Shoreview

Description: Build a new frontage road along the east side of I-35W between Co Rd H and Co Rd I; Construct a roundabout on Co Rd I at Rice Creek Pkwy east of I-35W. Close the ramp from Co Rd I to northbound I-35W

Construction dates: June-December 2017; work resumes in 2018

Traffic impacts: Delays, ramp and lane closures.

More information: https://www.ramseycounty.us/residents/roads-transit/2018-construction-maintenance/county-road-irice-creek-parkway-roundabout

Sign up for I-35W / County Rd I project email updates

I- 35W and I-94 — Downtown to Crosstown

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts:
Road, lane and ramp closures and delays
More information:
mndot.gov/35w94/

Sign up for 35W@94 project email updates

I-35W and I-94 — Minneapolis drainage tunnels

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014-Winter 2017/2018
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-35W, I-35E, I-35 — North Metro Split — Lino Lakes to Forest Lake

Description: Project includes resurfacing the road and replacing bridges

Construction dates: October 2017 to October 2019

Traffic impacts: Lane and ramp closures

More information: mndot.gov/metro/projects/i35northmetrosplit

Sign up for I-35 North Metro Split project email updates

I-35W — Minneapolis

Description: Replace anti-icing system on the I-35W St. Anthony Falls Bridge over the Mississippi River

Construction dates: April –November 2018

Traffic impacts: All work is beneath the bridge

Contact: Dave Aeikens

I-35W — Minneapolis to Roseville

Description: Resurface road between 4th St SE and County Rd C

Construction dates: July to October 2018

Traffic impacts: Five scheduled weekend road closures. Lane and ramp closures.

Contact: Kevin Walker

More Information: mndot.gov/metro/projects/i35w-mpls-roseville/

Sign up for I-35W Minneapolis to Roseville project email updates

Hwy 36

Hwy 36 — Stillwater Lift Bridge

Description: Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements.
Construction dates: Aug. 2017 to June 2019
Traffic impacts: The bridge is closed to ALL traffic, but will still operate to accommodate boat navigation.
More information: mndot.gov/metro/projects/liftbridge/

Sign up for Stillwater Lift Bridge project email updates

Hwy 95 (near Hwy 36)— St. Croix River Crossing

Description: Mitigation for construction of the new St. Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the upper loop trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95.
Construction dates: May 2014 to June 2019
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/metro/projects/hwy95stillwater/

Sign up for Stillwater Lift Bridge project email updates

Hwy 95 (near Hwy 36)— Stillwater

Description: Build St. Croix Crossing Upper Loop Trail, improve drainage
Construction dates: March 2018 to June 2019
Traffic impacts: Road closure (one month), detour
More information: mndot.gov/metro/projects/hwy95stillwater/

Sign up for Hwy 95 Stillwater project email updates

Hwy 37

Hwy 37 — St. Louis County bridge project

Description: Construct new bridge over Hwy 53

Construction dates: July to fall 2018

Traffic impacts: Hwy 37 detour, Hwy 53 brief lane closures

More Information: mndot.gov/d1/projects/hwy37bridge

COMPLETE: Hwy 37 — St. Louis County resurfacing project

Description: Resurfacing project

Construction dates: Spring 2018

Traffic impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy37

Hwy 38

Hwy 38 — Grand Rapids

Description: Resurface road, traffic signal and accessibility improvements

Construction dates: March to August 2018

Traffic impacts: Lane closures

More information: mndot.gov/d1/projects/hwy-38-grand-rapids

Hwy 38 — Pughole Lake to Marcell

Description: Resurface pavement, replace culverts

Construction dates: March to October 2018

Traffic impacts: Detour, local access will be maintained

More Information: mndot.gov/d1/projects/hwy-38

Hwys 40-59

Hwy 40

Hwy 40 – MN/SD State line to Hwy 119

Description: Resurface road
Construction dates: Work begins Aug. 13, 2018
Traffic impacts: Alternating lane closures, flagger and pilot car

More information: mndot.gov/d8/projects/hwy40mnstateline

Hwy 41

Hwy 41 — Chaska

Description: Landscape, reconstruct and expand road, improve intersection, signals and pedestrian ramps, relocate trail and build underpass for trail between Hwy 212 and Pioneer Trail. Project lead is Carver County.

Construction dates: May- November 2018

Traffic Impacts: Full closure and detours

More information: co.carver.mn.us/Hwy41ProjectJonathan

Hwy 41 and Hwy 169 — Scott County intersection improvements

Description: Scott County in partnership with MnDOT is finalizing the design for a diverging diamond interchange at the Hwy 169/Hwy 41, and Co Hhwy 78 intersection; frontage roads; and an overpass at Co Hwy 14.

Construction dates: Fall 2018 to fall 2020

Traffic impacts: Lane and intersection closures with detours

Contact: Diane Langenbach

More information: scottcountymn.gov/608/US-169-TH-41CH-78-Interchange-Design-Pro

Hwy 42

Hwy 42 Roundabout — Eyota

Description: Roundabout

Construction dates: May 7 - mid-July 2018

Traffic impacts: Detour

More information: mndot.gov/d6/projects/hwy42-roundabout/

Sign up for Hwy 42 Roundabout project email updates

Hwy 43

Hwy 43 — Winona

Description: Repair current bridge and construct new bridge across Mississippi River

Construction dates: July 2014-fall 2019

Traffic impacts: Minimal — short-term local road detour

More information: mndot.gov/winonabridge/

Sign up for Hwy 43 Winona project email updates

Hwy 46

Hwy 46 — Deer River

Description: Resurface, culvert replacement

Construction dates: May 21 to late July 2018

Traffic impacts: Detour

More information: mndot.gov/d2/projects/2018/hwy46-deer-river

Sign up for Hwy 46 Deer River project email updates

Hwy 47

COMPLETE: Hwy 47 — Minneapolis to Columbia Heights

Description: Road resurfacing

Construction dates: May to July 2018

Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47mpls/

Hwy 47 and Hwy 65 — Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at nine intersections on Hwy 47/University Ave. and Hwy 65/Central Ave. (14 total between 2016 and 2017 project work)

Construction dates: Spring 2016 to fall 2018
Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

Hwy 48

COMPLETE: Hwy 48 — Hinckley

Description: Resurface road; improve traffic signal functionality and pedestrian accessibility and safety

Construction dates: May 2018
Traffic impacts: Temporary lane closures

More information: mndot.gov/d1/projects/hwy48hinckley/

Hwy 50

Hwy 50 — Hwy 3 in Farmington to Hwy 52 in Hampton

Description: Resurfacing, renew signing, upgrade ADA crossings, modify intersections and add right turn lanes

Construction dates: April through August 2018

Traffic impacts: Lane closures, detour

More information: mndot.gov/metro/projects/hwy50farmington/

Sign up for Hwy 50 Farmington project email updates

Hwy 51

Hwy 51 (Snelling Avenue) — St. Paul

Description: Construct center median and left turn lanes, and improve pedestrian crossings between Ford Pkwy and Randolph Ave. (City of St. Paul is leading the project)

Construction dates: October to November 2018

Traffic impacts: Lane closures

Contact: Kevin Walker

Hwy 52

Hwy 52 — Coates to Cannon Falls

Description: Install Reduced Conflict Intersections

Construction dates: Summer 2017 - Spring 2018

Traffic impacts: Lane closures

More information: mndot.gov/metro/projects/hwy52coates/

Sign up for Hwy 52 Coates to Cannon Falls project email updates

Hwy 52 — Preston to Harmony

Description: Resurfacing

Construction dates: May 7 – late June 2018

Traffic impacts: Daily lane closures with flagger. Expect short delays.

More information: mndot.gov/d6/projects/hwy52-preston-harmony-resurfacing/

Sign up for Hwy 52 Coates to Cannon Falls project email updates

Hwy 52 — Rochester

Description: Resurfacing

Construction dates: July 9 – late fall 2018
Traffic impacts: Long-term lane closures with some short-term ramp detours. Expect delays during peak travel times.

More information: mndot.gov/d6/projects/hwy52-rochester-resurfacing/

Sign up for Hwy 52 Rochester project email updates

Hwy 53

Hwy 53 — Eveleth to Virginia

Description: Relocate this highway.

Construction dates: Fall 2015 - fall 2017
Traffic impacts: Minimal

More information: mndot.gov/d1/projects/hwy53relocation

Sign up for Hwy 53 Eveleth to Virgina project email updates

Hwy 55

Hwy 55 — Buffalo to Rockford

Description: Reconstruct/resurface Hwy 55 from Division St in Buffalo to the Crow River bridge in Rockford, upgrade culverts/pipes, guardrail and pedestrian sidewalks in Rockford, in Wright County

Construction dates: June-October 2018

Traffic Impacts:

  • Buffalo to Rockford: Hwy 55 to close to thru traffic and detour from early July to late August; detour through Delano
  • Rockford: Hwy 55 open with periodic lane or access closures, follow signs, access to be maintained

More information: mndot.gov/d3/2018/h55/

Sign up for Hwy 55 Buffalo to Rockford project email updates

Hwy 55 — Eden Valley

Description: Resurfacing and ADA improvements

Status: Work begins 2018

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/hwy55edenvalley

Hwy 55 — Golden Valley

Description: Replace signal at Meadow Ln.

Construction dates: July-November 2018

Traffic Impacts: Short-term lane closure

Contact: Dave Aeikens

Hwy 55 — Inver Grove Heights

Description: Reconstruction of Co Rd 28 and 63 at Hwy 55 adding turn lanes, and permanent signal system. County-led project.

Construction dates: April 3, 2017- June 2018
Traffic impacts: Lane and road closures with detours; Note: Hwy 55 will be a single lane in each direction at Argenta Trail June 21 to Oct. 13

More information: co.dakota.mn.us/Transportation/CurrentConstruction/CR28-63/Pages/default.aspx

Hwy 55 — Rockford to Theodore Wirth Pkwy

Description: Safety improvements including culvert replacement, tree removal, curb and gutter replacement and guardrail replacement.

Construction dates: July through fall 2018

Traffic impacts: Short-term lane closures

Contact: Dave Aeikens

More information: mndot.gov/metro/projects/hwy55safetyimprovements2018

Renaming Hwy 55, Hwy 110 in Inver Grove Heights to Hwy 62 in Mendota Heights

Description: Renaming the stretch of highway between I-494 and Hiawatha Ave. to Hwy 62: Hwy 55 between Hiawatha and Hwy 13 will be dual signed with Hwy 62. Hwy 110 between Hwy 13 and I-494 will be renamed to Hwy 62.

Construction dates: Signing begins July 2018

Traffic impacts: Lane and shoulder closures

Contact: Kirsten Klein

More information: mndot.gov/metro/projects/hwy110renamingtohwy62/

Hwy 59

Hwy 59 — Detroit Lakes to Becker County line

Description: Resurfacing

Status: Late summer through fall 2018

Contact: Brian Bausman

More information: mndot.gov/d4/projects/hwy59dl/

Hwy 58

Hwy 58 and Hwy 52 — Zumbrota

Description: Bridge replacement and roadway approach improvement

Construction dates: Summer 2017 - summer 2018

Traffic impacts: Lane closures

More information: mndot.gov/d6/projects/hwy58-bridge

Hwys 60-79

Hwy 60

Hwy 60 — Windom to Mountain Lake

Description: Complete four-lane expansion of Hwy 60 from Windom to St. James

Construction dates: Spring 2017-2018

Traffic impacts: Lane closures

More information: mndot.gov/d7/projects/hwy60stjames

Hwy 61

Hwy 61 — Hastings

Description: Replace signal and improve sidewalk accessibility at 15th St.

Construction dates: April-June 2018

Traffic impacts: Lane and turn lane closures, pedestrian detours

Contact: Kirsten Klein

Hwy 61 — Lafayette Tunnel Area

Description: Resurfacing project

Status: May 29 to late-June 2018

Traffic impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy61lafayette

Hwy 61 — Two Harbors

Description: Signal replacements, resurfacing, accessibility improvements.

Status: June 11 to October 2018
Contact: Derek Fredrickson

More Information: mndot.gov/d1/projects/hwy61twoharbors/

Hwy 62

Hwy 62 and Hwy 212 — Eden Prairie and Edina

Description: Resurface the hwy and move the pedestrian crossings at Beach Rd. from the east to the west of the intersection

Construction dates: Work begins summer 2018

Traffic impacts: Llane, shoulders and road closures with detours
Contact: David Aeikens

More information: mndot.gov/metro/projects/hwy62/

Sign up for Hwy 62 Eden Prairie and Edina project email updates

COMPLETE: Hwy 62 — Minneapolis

Description: Repair 34th St. bridge over Hwy 62

Construction dates: May 11 to June 8

Traffic impacts: Lane and temporary access closures with detours
Contact: David Aeikens

Hwy 62 — Minneapolis

Description: Resurface the road from Portland Ave. to Hwy 77

Construction dates: Summer 2018

Traffic impacts: Weekend closure
Contact: David Aeikens

Renaming Hwy 55, Hwy 110 to Hwy 62

Description: Renaming the stretch of highway between I-494 and Hiawatha Ave. to Hwy 62: Hwy 55 between Hiawatha and Hwy 13 will be dual signed with Hwy 62. Hwy 110 between Hwy 13 and I-494 will be renamed to Hwy 62.

Construction dates: Signing begins July 2018
Contact: Kirsten Klein

More information: mndot.gov/metro/projects/hwy110renamingtohwy62/

Hwy 63

Hwy 63 — Red Wing bridges

Description: Rehabilitate existing bridges, identify a preferred alternative for a bridge crossing between Red Wing, Minn. and Wisconsin

Status: Construction begins May 2017. Anticipated end date August 2020.

Contact: Mike Dougherty

More information: mndot.gov/d6/projects/redwing-bridge/

Hwy 63 — Rochester to Zumbro Falls

Description: Pave concrete and replace four culverts

Status: Work begins 2018
Contact: Mike Dougherty

More Information: mndot.gov/d6/projects/hwy63-resurfacing/

Hwy 63 — north of Zumbro Falls

Description: Replace culverts; resurface blacktop 5 miles of Hwy 63 from Zumbro Falls to Wabasha County Road 78.

Status: August - October 2018
Contact: Mike Dougherty

More Information: mndot.gov/d6/projects/hwy63-repaving-north-of-zumbrofalls/

Hwy 65

Hwy 65 — Aitkin County

Description: Resurface Hwy 65 from 0.14 miles south of CR 2 to the north Jct of Hwy 27

Construction dates: Fall 2018
Traffic impacts: Lane closures

More Information: mndot.gov/d1/projects/hwy65aitkin

Hwy 65 — Blaine

Description: Install new signal system at the intersection of Hwy 65 and 105th Ave. NE and ADA Accessibility improvements

Construction dates: Preliminary work began mid-September 2017. Construction begins spring 2018.
Traffic impacts: Short-term lane closures. No closures during tournaments at the Natl. Sports Center

Contact: Kent Barnard

Hwy 65 — Blaine, Ham Lake and East Bethel

Description: Construction of Reduced Conflict Intersections along Hwy 65 from north of Bunker Lake Blvd to 245 Ave. N. Lengthen left turn lanes at intersections between 85th Ave., Blaine and Sims Rd., East Bethel

Construction dates: July 2018 to October 2019

Traffic impacts: Expect Intermittent temporary detours for local roads accessing Hwy 65 and off-peak lane closures on Hwy 65.

Contact: Kent Barnard

More information: mndot.gov/metro/projects/hwy65rci

Sign up for Hwy 65 project email updates

Hwy 65 — Cambridge to south of Isanti

Description: Resurface both directions of Hwy 65 from 357th Ave NE, three miles north of Cambridge, south to 245th Ave NE at the Isanti/Anoka county line, south of Isanti (14.5 miles). Also, extend most turn lanes, repair/replace drainage, improve pedestrian access, and upgrade signals.

Construction dates: July 5, 2017 to June 1, 2018

Traffic impacts: Both directions of Hwy 65 to be reduced to a single-lane of traffic. Work will be done in segments. Plan for delays.

More information: mndot.gov/d3/h65isanti/

Hwy 65 — Nashwauk (Itasca County)

Description: Resurfaces Hwy 65 from Nashwauk to Hawkins

Status: May to September 2018

Traffic impacts: Lane closures

Contact: Beth Petrowske

More information: mndot.gov/d1/projects/hwy65itascacounty/

Hwy 65 and Hwy 47 — Minneapolis (University & Central Avenues)

Description: Reconstruct the signal systems and sidewalk ramps to comply with ADA requirements at nine intersections on Hwy 47/University Ave. and Hwy 65/Central Ave. (14 total between 2016 and 2017 project work)

Construction dates: Spring 2016 to fall 2018
Traffic impacts: Off-peak lane closures, local road closures, sidewalk closures

More information: mndot.gov/metro/projects/hwy47andhwy65

Hwy 67

Hwy 67 — Bridge

Description: Bridge replacement

Construction dates: July 9, 2018 – August 7, 2018

Traffic impacts: Detour

More information: mndot.gov/d8/projects/hwy67

Hwy 67 — Morgan

Description: Resurface road. Project led by City of Morgan.

Construction dates: Summer 2018 to 2021
Traffic impacts: Lane closures, pilot car and flagger

More information: mndot.gov/d8/projects/hwy67morgan

Hwy 68

Hwy 68 — Marshall

Description: Bridge rehabilitation

Construction dates: Work begins April 16, 2018.
Traffic impacts: Lane closures.

More information: mndot.gov/d8/projects/hwy68marshallbridge/

Hwy 71

Hwy 71 – Jct Hwy 9 to Belgrade

Description: Resurface road and seal coat

Status: Sept. 1 – Sept. 21, 2018

Traffic impacts: Lane closures, flagger and pilot car directing traffic

More information: mndot.gov/d8/projects/hwy71/

Hwy 71 — Kandiyohi County

Description: Resurface of US 71, construction of left turning lanes, bypass lanes, right turning lanes and a pedestrian underpass.

Status: Work begins summer of 2018

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/us71north

Hwy 72

Hwy 72 and Hwy 11 — Baudette/Rainy River International Bridge Replacement

Description: Preliminary design and environmental study for the replacement of the Baudette/Rainy River International Bridge on Hwy 72 in the city of Baudette and Hwy 11 in the town of Rainy River.

Status: Environmental Study Complete: Spring 2016. Final Bridge Design: 2016-17. Construction: 2018.

More information: mndot.gov/baudette-bridge/

Hwy 73

Hwy 73 — Floodwood

Description: Resurfacing project

Status: Sept. 15 - November 2018

Traffic impacts: Single lane closures, temporary detour

More information: mndot.gov/d1/projects/hwy73floodwood/

Hwy 75

Hwy 75 — near Kent to near Wolverton

Description: Road resurfacing.

Status: Work begins 2018

Contact: Justin Knopf

More information: mndot.gov/d4/projects/hwy75/

Hwy 75 — Pipestone

Description: Road resurfacing, construction of continuous left turn lane, replacement of pedestrian ramps and sidewalks to be in compliance with the Americans with Disabilities Act.

Construction dates: May 2018

Contact: Mandi Lighthizer-Schmidt

More information: mndot.gov/d8/projects/hwy75pipestone/

Hwy 75, Hwy 27 — Wheaton area

Description: Resurface Hwy 27 from just west of Co Rd 6 to the west end of Wheaton and Hwy 75 from Dumont to Wheaton

Status: Work scheduled for 2018.

Contact: Tom Pace, project manager

More information: mndot.gov/d4/projects/wheaton/

Hwy 77

Hwy 77 — Bloomington to Eagan

Description: Replace lighting systems from Old Shakopee Rd to Hwy 13

Construction dates: April-June 2018

Traffic impacts: Shoulder closure on Cedar Ave. bridge

Contact: Dave Aeikens

Hwy 77 — Eagan (Diffley Rd)

Description: Replace bridge joints on Diffley Road spanning Hwy 77

Construction dates: 2018

Traffic impacts: Lane closures and possible ramp closures

Contact: Kirsten Klein

Hwy 78

Hwy 78 — Battle Lakes to I-94

Description: Resurfacing, drainage and safety improvements

Status: Early May to late July 2018

Traffic Impacts: Intermittent lane closures, detours (during culvert work)

Contact: Tom Lundberg

More Information: mndot.gov/d4/projects/hwy78/

Co Hwy 78 and Hwy 169/Hwy 41 Intersection Improvements Project

Description: Scott County in partnership with MnDOT is finalizing the design for a diverging diamond interchange at the Hwy 169/Hwy 41 and Co Hwy 78 intersection, frontage roads, and an overpass at Co Hwy 14.

Construction Dates: Fall 2018 to fall 2020

Traffic impacts: Lane and intersection closures with detours

Contact: Diane Langenbach

More information: www.scottcountymn.gov/608/US-169-TH-41CH-78-Interchange-Design-Pro

Hwys 80-99

I-90

I-90 — Corridor Preservation

Description: Pavement restoration and bridge rehab

Construction dates: 2014-2018

More information: mndot.gov/d7/projects/I90preserve/

Sign up for I-90 project email updates

Hwy 92

Hwy 92 — Bagley

Description: Urban reconstruct, pedestrian improvements, curb/gutter and sewer replacement

Construction dates: May 14 to mid Aug 2018

Traffic impacts: Staged detours

More information: mndot.gov/d2/projects/2018/hwy92-bagley

I-94 in Twin Cities Metro

I-94 — Minneapolis noise wall replacement

Description: Replace noise wall on I-94 from Cedar Ave. to the Mississippi River

Construction dates: Mid-November 2017 to fall 2018

Traffic impacts: Crews will begin work in mid-November 2017, but will work away from traffic. Beginning spring 2018: ramp closures.

More Information: mndot.gov/metro/projects/i94mplsnoisewall

Sign up for I-94 Noise Wall Replacement project email updates

I-94 — Minneapolis to Brooklyn Center

Description: Resurface road, repair bridges on or over I-94, reconstruct westbound I-94 bridge deck over Hwy 252, and repair Lowry and Portland Avenue tunnels.

Construction dates: Spring 2017 through summer 2018

Traffic impacts: road, lane and ramp closures - delays

More Information: mndot.gov/metro/projects/i94brooklyncntr

Sign up for I-94 Minneapolis to Brooklyn Center project email updates

I-94 — St. Paul to Maplewood

Description: Resurface road, construct auxiliary lane and emergency pull-offs, build noisewall and replace part of an existing noisewall, repair bridges.

Construction dates: Spring 2016 to late fall 2017; minor wrap-up work in spring 2018

Traffic impacts: Lane closures, delays

More information: mndot.gov/metro/projects/i94stpaul

Sign up for I-94 St. Paul to Maplewood project email updates

I-94 and I-35W — Downtown to Crosstown

Description: Improve transit and regional access, reconstruct bridges and pavement
Construction dates: August 2017 through fall 2021
Traffic impacts: Lane and ramp closures
More information:
mndot.gov/35w94/

Sign up for 35W@94 project email updates

I-94 and I-35 — Minneapolis drainage tunnels

Description: Repair drain tunnels, construct new tunnel access shaft

Construction dates: Fall 2014-Winter 2017/2018
Traffic impacts: Delays, lane closures at staging area

More information: mndot.gov/metro/projects/stevensavenuempls

I-94 — West Lakeland Township

Description: Parking lot expansion for trucks at the St. Croix Rest Area in Washington Co.

Construction dates: Late-April 2018 - June 2018
Traffic impacts: Truck parking spaces reduced during project

Contact: Denise Workcuff

I-94 in Greater Minnesota

I-94 — Clearwater to Monticello

Description: Diamond grind (smoothen) eastbound and westbound driving lanes

Construction dates: April-May 2018

Traffic impacts: Overnight non-rush hour lane closures

More information: mndot.gov/d3/i94

I-94 — Hwy 79 to Hwy 114

Description: Re-deck four bridges, surface 15 miles of interstate

Construction dates: Late summer 2017 to 2018

Traffic impacts: Two-lane, two-way traffic

More information: mndot.gov/d4/projects/i94overlay/

I-94 — Lake Latoka near Alexandria

Description: Replace the I-94 bridges over Lake Latoka

Status:

  • Westbound bridge tentatively set for replacement in 2018
  • Eastbound bridge tentatively set for replacement in 2019

Contact: Brian Bausman

More information: mndot.gov/d4/projects/94latoka/

I-94 — Monticello

Description: The city of Monticello to construct a new Fallon Avenue overpass at I-94, west of Hwy 25, between Chelsea Rd and 7th St, includes roundabouts at Chelsea Rd, 7th St and Washington St in Monticello.

Construction dates: April-October 2018

Traffic impacts: Shoulder closures on I-94

More information: ci.monticello.mn.us/fallon

Hwy 95

Hwy 95 Cambridge

Description: City of Cambridge to make improvements on Highway 95 near Fern St and Dellwood St.
Construction dates: April 30 to Oct. 1, 2018
Traffic impacts: Periodic lane closures throughout the duration of the project. Detour in June for up to three weeks. Detour uses Isanti CR 70, 2nd Ave SW, S Dellwood St in Cambridge.
More information: www.ci.cambridge.mn.us

Hwy 95 Princeton roundabout

Description: City of Princeton and Mille Lacs County to construct a new roundabout at Highway 95 and 21st Ave N (County Road 157)

Construction dates: April to August 2018

Traffic impacts: Hwy 95 to close and detour in Princeton

More information: mndot.gov/d3/2017/princeton/

Hwy 95 and Manning Avenue — Washington County safety improvements

Description: Widening shoulders, resurface road, add turn lanes and update drainage.

Construction dates: Early July 2017 through late fall 2019; 2017 project work complete

Traffic impacts: Closures, detours

More information: mndot.gov/metro/projects/hwy95safetyimprovements/

Sign up for Hwy 95 Manning Avenue project email updates

Hwy 95, 36 — St. Croix River Crossing

Description: Mitigation for construction of the new St. Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the upper loop trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95.
Construction dates: May 2014 to June 2019
Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts
More information: mndot.gov/stcroixcrossing/

Sign up for Stillwater Lift Bridge project email updates

Hwy 95, 36— Stillwater

Description: Build St. Croix Crossing Upper Loop Trail, improve drainage
Construction dates: March 2018 to June 2019
Traffic impacts: Road closure (one month), detour
More information: mndot.gov/metro/projects/hwy95stillwater/

Sign up for Hwy 95 Stillwater project email updates

Hwy 95, 36 — Stillwater Lift Bridge

Description: Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements.
Construction dates: Aug. 2017 to June 2019
Traffic impacts: The bridge is closed to ALL traffic, but will still operate to accommodate boat navigation.
More information: mndot.gov/metro/projects/liftbridge/

Sign up for Stillwater Lift Bridge project email updates

Hwy 95 Taylors Falls to North Branch

Description: Seal coat the road between Hwy 8 and I-35

Construction dates: Late summer, will take about one week to complete
Traffic impacts: Temporary lane closures; moving flagging operation

Contact: Denise Workcuff

Hwy 97

Hwy 97 Forest Lake

Description: Reconstruct existing bypass lane shoulder, widening for a new shoulder, resurface existing pavement and upgrade drainage.

Construction dates: Late Aug. through early Nov. 2017; Minor wrap-up in spring 2018
Traffic impacts: Off-peak lane closures

More information: mndot.gov/metro/projects/hwy97forestlake/

Hwys 100-199

Hwy 100

Hwy 100 St. Louis Park

Description: Landscaping project along Hwy 100 between Hwy 7 and I-394.

Construction: May through summer 2018
Traffic Impacts: Shoulder closures during non-peak times

Contact: Dave Aeikens

More information: mndot.gov/metro/projects/hwy100slp/

Hwy 104

Hwy 104 Glenwood

Description: Resurfacing

Status: Work begins 2018
Contact: Bryan Christensen

More information: mndot.gov/d4/projects/glenwood/

Hwy 106

Hwy 106 Deer Creek to Hwy 10

Description: Resurfacing, turn lane installation, shoulder widening, pedestrian accessibility improvements

Status: Work begins 2018
Contact: Brian Bausman

More information: mndot.gov/d4/projects/hwy106/

Hwy 110

Renaming Hwy 55, Hwy 110 to Hwy 62

Description: Renaming the stretch of highway between I-494 and Hiawatha Ave. to Hwy 62: Hwy 55 between Hiawatha and Hwy 13 will be dual signed with Hwy 62. Hwy 110 between Hwy 13 and I-494 will be renamed to Hwy 62.

Construction dates: Signing begins July 2018

Traffic impacts: Lane and shoulder closures
Contact: Kirsten Klein

More information: mndot.gov/metro/projects/hwy110renamingtohwy62/

Hwy 149

Hwy 149 High Bridge (Smith Avenue and Dodd Road) — St. Paul to Mendota Heights

Description: Resurface the road, reconstruct the driving surface of the High Bridge, construct turn lane, replace signals and improve drainage

Construction dates: September 2017 to December 2018

Traffic impacts: High Bridge closed; Lane, trail and sidewalk closures

Contact: Nick Carpenter

More information: mndot.gov/metro/projects/hwy149highbridge/

Sign up for Hwy 149 High Bridge project email updates

Hwy 169 in the Twin Cities Metro

Hwy 169 Belle Plaine to Jordan

Description: Resurface and repair concrete pavement, install cable median barrier and construct Reduced Conflict Intersection (RCI)

Construction dates: Spring through fall 2018
Traffic impacts: Lane and intersection closures with detours

More information: mndot.gov/metro/projects/hwy169belleplaineandjordan

Sign up for Hwy 169 Belle Plaine and Jordan project email updates

Hwy 169 Champlin

Description: Replace bridges on Hwy 169 at Elm Creek, resurface highway between Hwy 610 and E Hayden Lake Rd

Construction dates: Fall 2017 through fall 2018
Traffic impacts: Lane closures controlled by signals or flaggers

More information: mndot.gov/metro/projects/hwy169champlin/

Sign up for Hwy 169 Champlin project email updates

Hwy 169 Golden Valley to Brooklyn Park

Description: Install traffic management system between I-394 and I-94

Construction dates: April-July 2018
Traffic impacts: Off-peak lane closures

Contact: Dave Aeikens

Hwy 169/Hwy 41 Intersection Improvements Project

Description: Scott County in partnership with MnDOT is finalizing the design for a diverging diamond interchange at the Hwy 169/Hwy 41 and Co Hwy 78 intersection, frontage roads, and an overpass at Co Hwy 14.

Construction Dates: Fall 2018 to fall 2020

Traffic impacts: Lane and intersection closures with detours

Contact: Diane Langenbach

More information: www.scottcountymn.gov/608/US-169-TH-41CH-78-Interchange-Design-Pro

Hwy 169 in Greater Minnesota

Hwy 169 Aitkin

Description: Restore the historic Pine-Hickory Lakes Roadside Parking Area

Construction dates: Summer 2018

More information: mndot.gov/roadsides/historic/projects.html

Hwy 169 Garrison

Description: Restore historic northbound Hwy 169 bridge over a creek, along Mille Lacs Lake, between Hwy 18 and the Garrison Public Water Access at Pike Point.

Construction Dates: July 9 to late October 2018

Traffic Impacts: Close bridge. Both directions to be single-lane traffic on southbound side of road. Garrison Public Water Access will be open.

More information: www.mndot.gov/d3/2018/garrison/

Hwy 169 Mankato

Description: Approximately 0.8 miles of Hwy 169 just north of the Hwy 14 junction will be grade raised to meet the 100-year base flood elevation to aid in flood protection of portions of Mankato and lower North Mankato.

Construction Dates: August to November 2018

Traffic Impacts: No detour for Hwy 169 through traffic is expected; expect periodic northbound and southbound lane closures on 169; expect periodic ramp closures and associated detours

More information: mndot.gov/d7/projects/hwy169mankato/

Hwy 169 Mountain Iron

Description: Repair of two bridges, hwy resurfacing, and traffic signal and accessibility improvements.

Construction Dates: April 9 to Oct. 5, 2018

Traffic Impacts: Short detour, temporary lane closures

More information: mndot.gov/d1/projects/hwy-169-mountain-iron/

Hwy 169 St. Peter to Le Sueur

Description: Concrete overlay and pavement improvement

Status: Work begins 2018
Contact: Rebecca Arndt
More information: mndot.gov/d7/projects/hwy169/

Hwy 169 and Hwy 1 Cross-Range Expressway

Description: This project will expand Hwy 169 from two to four lanes from the east end of the Bovey Bypass, east 1.55 miles through Taconite.

Construction Dates: Mid-May to June 2018

Traffic Impacts: Brief, temporary lane closures

More information: mndot.gov/d1/projects/hwy169-cross-range/

Hwy 1 and Hwy 169 Eagles Nest Lake Reconstruction

Description: Make safety improvements to Hwy 169 from Six Mile Lake Road to Bradach Road

Construction Dates: Winter (January-March) 2017-summer 2018

Traffic Impacts: Daily flagging operations with temporary lane and shoulder closures

More information: mndot.gov/d1/projects/Hwy169eagles/

Hwy 194

Hwy 194, Mesaba Avenue and Hwy 2 Duluth

Description: Lane reconfiguration, bridge repairs, concrete pavement repairs and ADA improvements

Construction dates: May 14-October 19, 2018

Traffic impacts: Lane closures, detour

Contact: Beth Petrowske

More information: mndot.gov/d1/projects/hwy194-mesaba-duluth/

Hwys 200-299

Hwy 210

Hwy 210 — West of Staples

Description: Replace the Hwy 210 Moran Creek bridge with a new box culvert between 251st Ave and Todd CR 9
Construction dates:
Mid-June to August 2018
Traffic impacts:
Road to close.Detour uses Hwy 10 in Staples and Todd CR 9. Please be alert and watch for slow-moving buggy traffic in the area
More information:
mndot.gov/d3/2018/h210/

Hwy 210 — Aitkin County

Description: Resurfacing project.
Construction dates:
July to September 2018
Traffic impacts:
Lane closures

More information: mndot.gov/d1/projects/hwy210aitkincty

Hwy 212

Hwy 212 – MN/SD state line to Hwy 75

Description: Resurface road and reclaim shoulders
Construction dates: Work begins Aug. 13, 2018
Traffic impacts: Alternating lane closures, pilot car with flagger

More information: mndot.gov/d8/projects/hwy212mnstateline

Hwy 212 – Montevideo to Granite Falls

Description: Pavement resurfacing
Construction dates: July – October 2018
Traffic impacts: Alternating lane closures, flagger and pilot car

More information: mndot.gov/d8/projects/hwy212

Sign up for Hwy 212 project email updates

Hwy 238

Hwy 238 — Albany

Description: Reconstruct Highway 238 between Railroad Avenue and Stearns CR 10, near North Lake, includes new city utilities and pedestrian sidewalks.
Construction dates: June to mid-September 2018
Traffic impacts: Detour in Albany

More information: mndot.gov/d3/2018/albany/

Hwy 252

Hwy 252 and 70th Avenue N — Brooklyn Center

Description: Reconstruct 70th Ave. between Hwy 252 and Dupont Ave. N
Construction dates: August 28 through October 2017; minor wrap-up work in spring 2018.
Traffic impacts: 70th Ave. closed and detoured west of Hwy 252
More information: cityofbrooklyncenter.org/index.aspx?NID=1175

Hwys 300-694

Hwy 371

Hwy 371— Backus to Hackensack

Description: Resurface and repair/replace underground culverts on Hwy 371 from Hwy 87 in Backus to Cass CR 40 in Hackensack
Construction dates: August to mid-October 2018
Traffic impacts: Plan for delay, Hwy 371 to close to thru traffic up to five weeks. Detour uses Hwy 87, Hwy 64 and CR 19/40 in Hubbard and Cass counties.
More information: mndot.gov/d3/2018/h371/

Hwy 371— Baxter/Brainerd

Description: Resurface both directions of Hwy 371from south of Hwy 210 in Baxter to 50th Ave SW, south of the Business Hwy 371 interchange, in Crow Wing County
Construction dates: June to August 2018
Traffic impacts: Segments of single lane closures, reduced speeds, narrowed lanes
More information: mndot.gov/d3/2018/h371/

Hwy 371B — South Sixth Street Brainerd

Description: Reconstruct South Sixth Street in Brainerd; includes city sidewalks, underground utilities and infrastructure and signal systems between Hwy 210 and Joseph St
Construction dates: November 2017 to early-October 2018
Traffic impacts: Prep work November 2017 to March 2018 - Periodic lane or shoulder closures. Reconstruct April to early-October 2018 – Close Hwy 371B in segments and detour
More information: mndot.gov/d3/brd/

Sign up for South Sixth Street Brainerd project email updates

I-494

I-494 Bloomington

Description: Replace cable median barrier between East and West Bush Lake Road

Construction dates: June-August 2018

Traffic Impacts: Lane shifts on I-494

Contact: Dave Aeikens

I-494

I-494 Inver Grove Heights and South St. Paul

Description: Bridge deck resurfacing and auxiliary lane addition

Construction dates: Fall 2018 through fall 2019

Traffic Impacts: Lane and ramp closures with detours

More information: mndot.gov/metro/projects/i494invergroveheights/

Sign up for I-494 Inver grove Heights and South St. Paul project email updates

I-494 and East Bush Lake Road Bloomington

Description: Construct ramp to westbound I-494; reconstruct ramp to eastbound I-494 and modify signals

Construction dates: Mid-October 2017 to Fall 2018

Traffic impacts: Lane closures

More information: bloomingtonmn.gov/eng/east-bush-lake-roadi-494-interchange-west-bound-ramp
Contact: david.aeikens@state.mn.us

Hwy 610

Hwy 610 Brooklyn Park to Coon Rapids

Description: Install traffic management system Hwy 169 in Brooklyn Park to the Mississippi River in Coon Rapids and on 169 from I-394 in Golden Valley to I-94 in Brooklyn Park

Construction dates: Spring-fall 2018

Traffic impacts: Off-peak lane closures

Contact: Kent Barnard