Join us for a community celebration for the reopening of the Stone Arch Bridge on Sat, Aug. 9. For more information, visit the meetings webpage.
This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Pedestrian and bicyclist impacts

Stone Arch Bridge project location map.
Current
Bridge closure
Early December 2024 through Sat, Aug. 9, 2025
- The downtown side of the Stone Arch Bridge is closed. Pedestrians and bicyclists will not be able to cross the full length of the bridge.
- Pedestrian detour: SE 6th Ave. to SE 2nd St. to Central Ave./Third Ave. Bridge to S. 1st St. (PNG)
- Northbound bicyclist detour: W. River Pkwy. to Portland Ave. to S. 2nd St. to Third Ave. Bridge/Central Ave. to SE University Ave. to SE 6th Ave. (PNG)
- Southbound bicyclist detour: SE 6th Ave. to SE 4th St. to Central Ave./Third Ave. Bridge to S. 2nd St. to Portland Ave. to W. River Pkwy. (PNG)
Upcoming
Information about upcoming pedestrian and bicyclists impacts will be posted as details become available.
About this project
The historic Stone Arch bridge in Minneapolis will get repairs to the mortar. The rocks and stones will be replaced and repaired as needed.
Summary of work
- Repoint mortar on entire bridge
- Repair/replace stone
- Additional repairs as required