Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.138(A) (PDF) |
7.138(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.138 Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.138(B) (PDF) |
7.138(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.138(B) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.138(C) (PDF) |
7.138(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.138(C) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.138(D) (PDF) |
7.138(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.138(D) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) No Approach Panel |
7.138(E) (PDF) |
7.138(E) (DGN) |
May 10, 2017 |
Dec. 21, 2022 |
7.138(E) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.139(A) (PDF) |
7.139(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.139(A) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.139(B) (PDF) |
7.139(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.139(B) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.139(C) (PDF) |
7.139(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.139(C) Revision Log (PDF) |
Concrete Barrier 36” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.139(D) (PDF) |
7.139(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.139(D) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.140(A) (PDF) |
7.140(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.140(A) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.140(B) (PDF) |
7.140(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.140(B) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.140(C) (PDF) |
7.140(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.140(C) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.140(D) (PDF) |
7.140(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.140(D) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.141(A) (PDF) |
7.141(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.141(A) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.141(B) (PDF) |
7.141(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.141(B) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.141(C) (PDF) |
7.141(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.141(C) Revision Log (PDF) |
Concrete Barrier 42” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.141(D) (PDF) |
7.141(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.141(D) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.142(A) (PDF) |
7.142(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.142(A) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.142(B) (PDF) |
7.142(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.142(B) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.142(C) (PDF) |
7.142(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.142(C) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.142(D) (PDF) |
7.142(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.142(D) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (Without Concrete Wearing Course) |
7.143(A) (PDF) |
7.143(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.143(A) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Guardrail Connection) (With 2" Concrete Wearing Course) |
7.143(B) (PDF) |
7.143(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.143(B) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (Without Concrete Wearing Course) |
7.143(C) (PDF) |
7.143(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.143(C) Revision Log (PDF) |
Concrete Barrier 54” (Type S, TL-4) (Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection) (With 2" Concrete Wearing Course) |
7.143(D) (PDF) |
7.143(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.143(D) Revision Log (PDF) |
Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Split Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.144(A) (PDF) |
7.144(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.144(A) Revision Log (PDF) |
Split Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.144(B) (PDF) |
7.144(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.144(B) Revision Log (PDF) |
Split Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.144(C) (PDF) |
7.144(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.144(C) Revision Log (PDF) |
Split Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.144(D) (PDF) |
7.144(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.144(D) Revision Log (PDF) |
Split Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.145(A) (PDF) |
7.145(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.145(A) Revision Log (PDF) |
Split Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.145(B) (PDF) |
7.145(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.145(B) Revision Log (PDF) |
Split Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.145(C) (PDF) |
7.145(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.145(C) Revision Log (PDF) |
Split Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.145(D) (PDF) |
7.145(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.145(D) Revision Log (PDF) |
Split Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.146(A) (PDF) |
7.146(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.146(A) Revision Log (PDF) |
Split Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.146(B) (PDF) |
7.146(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.146(B) Revision Log (PDF) |
Split Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.146(C) (PDF) |
7.146(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.146(C) Revision Log (PDF) |
Split Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.146(D) (PDF) |
7.146(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.146(D) Revision Log (PDF) |
Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Solid Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.147(A) (PDF) |
7.147(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.147(A) Revision Log (PDF) |
Solid Median Barrier 36” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.147(B) (PDF) |
7.147(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.147(B) Revision Log (PDF) |
Solid Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.147(C) (PDF) |
7.147(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.147(C) Revision Log (PDF) |
Solid Median Barrier 36” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.147(D) (PDF) |
7.147(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.147(D) Revision Log (PDF) |
Solid Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.148(A) (PDF) |
7.148(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.148(A) Revision Log (PDF) |
Solid Median Barrier 42” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.148(B) (PDF) |
7.148(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.148(B) Revision Log (PDF) |
Solid Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.148(C) (PDF) |
7.148(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.148(C) Revision Log (PDF) |
Solid Median Barrier 42” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.148(D) (PDF) |
7.148(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.148(D) Revision Log (PDF) |
Solid Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (Without Concrete Wearing Course) |
7.149(A) (PDF) |
7.149(A) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.149(A) Revision Log (PDF) |
Solid Median Barrier 54” (Type S, TL-4) (Integral or Semi-Integral Abutment) (With 2" Concrete Wearing Course) |
7.149(B) (PDF) |
7.149(B) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.149(B) Revision Log (PDF) |
Solid Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (Without Concrete Wearing Course) |
7.149(C) (PDF) |
7.149(C) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.149(C) Revision Log (PDF) |
Solid Median Barrier 54” (Type S, TL-4) (Parapet Abutment) (With 2" Concrete Wearing Course) |
7.149(D) (PDF) |
7.149(D) (DGN) |
Aug. 24, 2016 |
Dec. 21, 2022 |
7.149(D) Revision Log (PDF) |
Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) |
7.157(A) (PDF) |
7.157(A) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(A) Revision Log (PDF) |
Integral or Semi-Integral Abutment with Guardrail Connection (With 2” Concrete Wearing Course) |
7.157(B) (PDF) |
7.157(B) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(B) Revision Log (PDF) |
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) |
7.157(C) (PDF) |
7.157(C) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(C) Revision Log (PDF) |
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) |
7.157(D) (PDF) |
7.157(D) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(D) Revision Log (PDF) |
Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) |
7.157(E) (PDF) |
7.157(E) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(E) Revision Log (PDF) |
Parapet Abutment with Guardrail Connection (With 2” Concrete Wearing Course) |
7.157(F) (PDF) |
7.157(F) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(F) Revision Log (PDF) |
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) |
7.157(G) (PDF) |
7.157(G) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(G) Revision Log (PDF) |
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) |
7.157(H) (PDF) |
7.157(H) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.157(H) Revision Log (PDF) |
Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Ornamental Metal Railing Design T-4 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) |
7.162(A) (PDF) |
7.162(A) (DGN) |
Nov. 6, 2013 |
Dec. 21, 2022 |
7.162(A) Revision Log (PDF) |
Ornamental Metal Railing Design T-4 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) |
7.162(B) (PDF) |
7.162(B) (DGN) |
Dec. 2, 2020 |
Dec. 21, 2022 |
7.162(B) Revision Log (PDF) |
Ornamental Metal Railing Design T-4 Parapet Mount Parapet Abutment (without Guardrail Connection) |
7.162(C) (PDF) |
7.162(C) (DGN) |
Feb. 8, 2022 |
Dec. 21, 2022 |
7.162(C) Revision Log (PDF) |
Ornamental Metal Railing Design T-4 Parapet Mount Parapet Abutment (with Guardrail Connection) |
7.162(D) (PDF) |
7.162(D) (DGN) |
Feb. 8, 2022 |
Dec. 21, 2022 |
7.162(D) Revision Log (PDF) |
Design T-4 Curb Mount Integral or Semi-Integral Abutment |
7.163(A) (PDF) |
7.163(A) (DGN) |
Nov. 6, 2013 |
Dec. 21, 2022 |
7.163(A) Revision Log (PDF) |
Design T-4 Curb Mount Parapet Abutment |
7.163(B) (PDF) |
7.163(B) (DGN) |
Feb. 8, 2022 |
Dec. 21, 2022 |
7.163(B) Revision Log (PDF) |
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) |
7.164(A) (PDF) |
7.164(A) (DGN) |
Feb. 22, 2018 |
Dec. 21, 2022 |
7.164(A) Revision Log (PDF) |
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) |
7.164(B) (PDF) |
7.164(B) (DGN) |
Dec. 2, 2020 |
Dec. 21, 2022 |
7.164(B) Revision Log (PDF) |
Design T-5 Parapet Mount Parapet Abutment (without Guardrail Connection) |
7.164(C) (PDF) |
7.164(C) (DGN) |
Feb. 8, 2018 |
Dec. 21, 2022 |
7.164(C) Revision Log (PDF) |
Design T-5 Parapet Mount Parapet Abutment (with Guardrail Connection) |
7.164(D) (PDF) |
7.164(D) (DGN) |
Feb. 8, 2022 |
Dec. 21, 2022 |
7.164(D) Revision Log (PDF) |
Design T-5 Curb Mount Integral or Semi-Integral Abutment |
7.165(A) (PDF) |
7.165(A) (DGN) |
Feb. 22, 2018 |
Dec. 21, 2022 |
7.165(A) Revision Log (PDF) |
Design T-5 Curb Mount Parapet Abutment |
7.165(B) (PDF) |
7.165(B) (DGN) |
Feb. 8, 2022 |
Dec. 21, 2022 |
7.165(B) Revision Log (PDF) |
Standard figure |
PDF |
DGN |
Approval date |
Revision date |
Revision log |
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) With Raised Sidewalk |
7.166(A) (PDF) |
7.166(A) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(A) Revision Log (PDF) |
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) |
7.166(B) (PDF) |
7.166(B) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(B) Revision Log (PDF) |
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk |
7.166(C) (PDF) |
7.166(C) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(C) Revision Log (PDF) |
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) |
7.166(D) (PDF) |
7.166(D) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(D) Revision Log (PDF) |
Parapet Abutment (Without Concrete Wearing Course) With Raised Sidewalk |
7.166(E) (PDF) |
7.166(E) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(E) Revision Log (PDF) |
Parapet Abutment (Without Concrete Wearing Course) |
7.166(F) (PDF) |
7.166(F) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(F) Revision Log (PDF) |
Parapet Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk |
7.166(G) (PDF) |
7.166(G) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(G) Revision Log (PDF) |
Parapet Abutment (With 2” Concrete Wearing Course) |
7.166(H) (PDF) |
7.166(H) (DGN) |
April 9, 2020 |
Dec. 21, 2022 |
7.166(H) Revision Log (PDF) |