Example Accelerated Bridge Construction options
Standard ABC details are under development.
Full depth bridge deck panels
Bridge 69071
- New bridge example plan - Br 69071 (PDF)
- New bridge example special provision - Br 69071 (PDF)
- Bridge construction timeline (PDF)
- Lessons learned (PDF)
- Photos
Bridge 27504
Lateral bridge slide
- New bridge example plan - Br 62646 Larpenteur Ave over I-35E, St. Paul (PDF)
- Contractor slide system details (PDF)
- New bridge example special provision - Br 62646 (PDF)
- Lessons learned (PDF)
- Videos
Self-Propelled Modular Transporters
Bridge 62626
- New bridge example plan - Br 62626 Maryland Ave over I-35E, St. Paul (PDF)
- Contractor SPMT drawings (PDF)
- Design-build example special provision - Br 62626 (PDF)
- Contractor safety and contingency plan (PDF)
- Bridge construction timeline (PDF)
- Videos
Bridge 19004
Inverted tees
- New bridge example plan - Br 62037 TH 36 over Keller Lake, Maplewood (PDF)
- New bridge example special provision - Br 62037 (PDF)
- Photos
Precast substructures (abutments, piers)
- New bridge example plan - Br 25024 TH 61 over Gilbert Creek, Lake City (PDF)
- New bridge example special provision - Br 25024 (PDF)
- Photos
Additional options for local system bridges
Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS)
- New bridge example plan - Rock County Br 67564 (PDF)
- New bridge example special provision - Br 67564 (PDF)
- FHWA Geosynthetic Reinforced Soil-Integrated Bridge System
- Lessons learned (PDF)
- Photos